• Title/Summary/Keyword: 자재 요소

Search Result 163, Processing Time 0.026 seconds

Separators far Li-Ion Secondary Batteries (리튬이온 2차전지용 분리막)

  • Nam Sang Yong;Lee Young Moo;Lee Chang Hyun;Park Ho Bum;Rhim Ji Won;Ha Seong Yong;Kang Jong Seok
    • Membrane Journal
    • /
    • v.14 no.4
    • /
    • pp.263-274
    • /
    • 2004
  • The polymeric membrane, a component of battery devices such as Li-ion battery (LIB) and Li-polymer battery (LPB), is a typical material in which the carrier mobility dominates the battery performance. In this paper, the state-of-the-art of membranes for secondary battery is described in terms of membrane properties. Several prerequisites, which are related to stability of battery devices, are discussed to design and prepare suitable polymeric membranes. In addition, physical requirements of membranes and their measurement methods are described to develop applicable polymeric membranes in membrane preparation processes.

사이버 아파트 네트워크 기본 설계에 관한 연구

  • Choe Chang-Geun
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2002.08a
    • /
    • pp.85-104
    • /
    • 2002
  • 최근 정부(정보통신부)는 사이버 아파트를 포함하여 초고속 정보통신망을 2005년까지 구축하여 각 가정당 10Mbps의 고속 정보통신서비스를 실현한다는 계획을 발표하고, 초고속 정보통신을 활성화하므로 정보통신 선진국 진입을 위하여 "초고속 정보통신 건물 인증제도"를 발표, 현재 시행하고 있다. (1999.7 제정발표) 그러나 시행 과정에서 아파트 중앙 관리실에 있는 MDF 이후의 광케이블과 기타 공사는 건설회사에서 시공하고 중앙 관리실 MDF 이전의 광케이블 공사와 중앙관리실 LAN시설 등의 공사는 통신 전문업체로 하여금, 입주자 별도 부담금으로 시공하고 있다. (컨소시엄구성) 최근 아파트 분양열기 고조로 건설회사 마다 "초고속 정보통신아파트"인증 1등급이라고 선전 및 분양광고 중인데 실제는 "1등급"이 아니고 "2등급" 또는 "3등급"인 경우가 있어, 정부가 목표하는 각 가정당 10Mbps, 개인당 2Mbps 고속정보통신 서비스는 실현성 문제점이 있다. 정부의 인증심사 기준에 중앙관리실 장비 등에 대한 것은 심사기준에 누락되어 있고 또 사생활 정보보호를 위한 대응기술, 시스템 준비 정도까지 포함하여 종합적으로 평가한 뒤 인증을 부여하여야 한다는 것이 본인의 연구 초점이다. 사이버 아파트란 광통신을 주축으로 영상과 음성, 데이터를 자유 자재로 전송 처리하는 초고속 정보통신망을 이용하는 것으로 LAN 장비를 이용하여 각 세대간 통신은 물론 누구나 인터넷을 사용할 수 있는 기능이 있는 설계된 아파트를 말한다. 사이버 아파트의 네트워크에는 금융, 홈쇼핑, 예약, 지역정보, 관공서, 의료서비스, 레저 생활정보 등 차별화된 콘텐츠 확보가 필요하다. 본 연구의 핵심은 사이버 아파트의 현 실태와 문제점, 정부의 인증심사 기준의 미비점과 문제점, 사이버 아파트의 기능, 구성요소, 시스템 구축, 서버활용도, 장비들에 관한 것과 그리고 정부의 사이버 아파트 육성정책, 정보보호 대책과 관련업체들의 동향 등을 연구하여 요약 정리하였다.

  • PDF

설계기준해설 - 과거 터널현장 국부적인 붕락 유형 사례 연구

  • Kim, Nak-Yeong;Hwang, Yeong-Cheol
    • 지반과기술
    • /
    • v.10 no.4
    • /
    • pp.20-31
    • /
    • 2013
  • 본 터널 붕락 사례 연구를 종합적으로 분석해 볼때, 시공 공정 중에 발생 가능한 붕괴 및 붕락은 앞서와 같이 과거의 여러 사례들을 토대로 분석함으로서 예측 할 수 있지만, 시공 외적인 요인에 대해서는 사실상 조사, 설계, 시공 중의 오류에 의해 발생되는 것이기 때문에 파악하기 어렵다. 본 터널 붕락사례를 통해 원인을 분석 정리 하면 다음과 같다. (1) 불규칙한 지반구조적 원인 대부분의 터널 붕락을 일으키는 불규칙한 지반구조는 과거 지반구조의 침식 또는 대규모 지반운동 등 지반구조의 급속한 변화에 기인한 것이다. 터널 시공전에 면밀한 사전 지반조사와 선진 보오링 등으로 정확한 지반구조를 파악한다면 이로 인한 터널 붕락은 최소화 시킬수 있다. (2) 기획과 설계단계에서의 오류 충분치 못한 지반조사에 의한 설계 및 부적절한 시공자재 사용등으로 터널 붕락이 발생 될수 있다. 터널 굴착 주변 지반조건과 이러한 지반조건에 적합한 터널 굴착 및 보강공법 등이 터널 설계시 심도있게 검토되어야 할 가장 중요한 요소이다. (3) 시공 및 관리에서의 오류 경험이 부족한 터널기술자의 현장 감독과 현장에서 수집되는 각종 계측자료의 신뢰성 부족과 결과의 재적용 미흡으로 효율적인 계측 및 지반정보를 활용한 정밀 시공이 이루어지지 않는 것도 터널 붕락의 중요한 요인으로 분석되었다. (4) 현장관리 조사서의 표준화 부족 터널굴착공사중 붕락이 발생된 현장의 막장조사결과를 보면 조사자가 임의로 표시를 하여 각 터널별 막장조사결과가 매우 상이할 뿐만 아니라 각 터널별로 기재방법, 양식이 달라서 실제 원인분석에 활용하기가 어려운 것으로 분석되었다.

  • PDF

Framework of Owner-driven Lean Construction for Plant Construction (발주자 주도형 린 건설에 대한 기초 연구;플랜트 건설공사를 중심으로)

  • Ryu, Chung-Kyu;Han, Seung-Heon;Park, Jung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.647-651
    • /
    • 2007
  • The Lean Construction is adopted from Lean Principle of Manufacturing Industry in the early of 1990, that has been providing theoretical background and good practical implementation for maximizing customers' satisfaction and improving productivity through minimizing the waste factors in the construction operations. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research is propose a framework for implementation of LPS conducted by owner in plant construction.

  • PDF

A theoretical study on the concept of supply chain management and strategic implications (통합적 공급체인관리의 개념과 전략적 의의에 관한 이론적 연구)

  • 장경수
    • The Journal of Information Technology
    • /
    • v.2 no.1
    • /
    • pp.65-78
    • /
    • 1999
  • Nowadays, SCM(supply chain management) is recognized as a efficient way to overcome the limits of asset and capability of one fun through the synergy effects comes from strategic alliance. Traditionally material management and logistics are recognized as a simple functional activity. But as the importance and needs of customer service are increased, gradually these activities are given to strategic role of cutting off the cost and increasing the sales. But unlike traditional alliance, for example technology alliance or holding facility in common, SCM has many difficulties in action because of differences in organization structure and management system between two firms. So in this paper, I will review literatures about the concept and constructing factor of SCM, the conditions for effective doing and strategic implications.

  • PDF

A Study on the case study LCA Analysis for the Education and Research Building of S University (S대학교 교육연구동 LCA분석 사례 연구)

  • Bum Sung-Woo;Kim Min-Hyun;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.465-468
    • /
    • 2003
  • It has taken a growing interest about environmental problems such as global warming and water pollution. Because of intensified environmental problems, it would be going on the research about environmental preservation and harmful factor reduction. Also, it makes ISO to show the quantitative data about LCA analysis. The research of LCA method in the domestic construction industry has advanced stealing from a national point of view. In this study, it would be possible to confirm the feasibility of a plan by LCA analysis. Moreover, the result of life cycle cost which deliberate the influence cost of environment in the steps of material production, construction, maintenance, and disposal has made to be 74,819,560,776 won in a plan and 78,979.469,602won in alternative. That is, it would analysis for a plan to reduce 4,159,908,826 won for alternative.

  • PDF

Prediction of temperature distribution in PV module using finite element method (유한 요소 해석 프로그램을 이용한 모듈 내 온도 분포 예측)

  • Park, Young-Eun;Jung, Tae-Hee;Go, Seok-Hwan;Ju, Young-Chul;Kim, Jun-Tae;Kang, Gi-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.2
    • /
    • pp.65-72
    • /
    • 2016
  • PV module is installed in various outdoor conditions such as solar irradiation, ambient temperature, wind speed and etc. Increase in solar cell temperature within PV module aggravates the behaviour and durability of PV module. It is difficult to measure temperature among respective PV module components during PV module operating, because the temperature within PV module depends on thermal characteristics of PV module components materials as well as operating conditions such as irradiation, outdoor temperature, wind etc. In this paper, simulation by using finite element method is conducted to predict the temperature of each components within PV module installed to outdoor circumstance. PV module structure based on conventional crystalline Si module is designed and the measured values of thickness and thermal parameters of component materials are used. The validation of simulation model is confirmed by comparing the calculated results with the measured temperatures data of PV module. The simulation model is also applied to estimate the thermal radiation of PV module by front glass and back sheet.

An Analysis on the Influence of Work Management Type on Work Condition (작업관리방식이 작업여건에 미치는 영향 분석 - 주단위작업관리방식과 일단위작업관리방식을 중심으로 -)

  • Yoon, Byong-Sik;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.75-83
    • /
    • 2010
  • Construction industries is a labor intensive industries. According to Korea Productivity Center, most OECD members indicate high labor productivity more than Korea labor productivity in construction industries. First of all, for increasing labor productivity work efficiency and work condition should be managed by administrator in work site. Especially, work condition could be controlled by the management behaviors of administrator in work site such as work management type. This indicates that work management type could influence strongly work condition. But although that work management type could influence work condition is the characteristic of construction work is recongized to many people, the quantitative analysis on the relationship between work condition and work management type is not enough. Therefore the purpose of this study is to analyze the Influence of Work Management Type on Work Condition.

A Development of Task Generator through an Analysis of Task Location Information Structure (작업위치 정보체계 분석을 통한 작업정보 생성기 개발)

  • Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.64-71
    • /
    • 2004
  • A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.

Study on the Risk Factors of Construction Projects since COVID-19 (COVID-19가 건설프로젝트 리스크에 미치는 영향)

  • Lee, Jae-Hyun;Lee, Seong-Hyeon;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.4 no.1
    • /
    • pp.1-8
    • /
    • 2021
  • COVID-19, which is currently in vogue, is a pandemic with the largest number of deaths since the establishment of the "World Health Organization". It is also expected to have a significant impact on countless construction projects. After COVID-19 hit the construction industry, the risk that they needed to cover, decreased every year. However, the prolonged COVID-19 increased the risks of air delays, material supply, and economic losses. The exact measurements will be needed to be identified and the risks of the current construction projects must have a mitigated risk with a greater proportion. Therefore, the purpose of this study is to analyze and identify the risks that have influenced construction projects to the domestic construction companies due to COVID-19. Based on the risks of the previous construction projects, risk case studies, and risks related to COVID-19, are extracted through surveys, weights. Each risk factor are calculated based on the AHP analysis technique. Thus, it is expected that the results of the risk research on construction projects will change due to COVID-19. It will be presented to cope with the current situation and later pandemic situations.