• Title/Summary/Keyword: 자재 관리 시스템

Search Result 223, Processing Time 0.024 seconds

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

Web-based Distributed Lean Construction Information System;Development of System Prototype (웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발)

  • Park, Moon-Seo;Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.182-189
    • /
    • 2007
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

Design and Implementation of single antenna RFID Shelf for FIFO Management of marine materials (선박용 자재 선입/선출관리를 위한 단일안테나 RFID shelf의 구축에 관한 연구)

  • Jang, Won-Tae
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.3
    • /
    • pp.456-461
    • /
    • 2011
  • In this paper, design and Implementation of single antenna RFID Shelf for FIFO management of marine materials, and propose a design as one effective solution of the problem. The goals of the proposed design and system are as follows: cost saving, RFID data validation. Cost problem occurs by the use of many RFID readers. Data problems in the steel structure is generated by the use of radio wave (RFID). In addition, material data from RFID Shelf system, is expected to be used FIFO design information for the vessel information system. Through the proposed RFID Shelf System, it is expected to systematic management and efficient business processes for the vessel information system.

A Study of Material Information System Model For Building Finishes (건축 마감자재정보 시스템 모델 연구)

  • Won, Seo-Kyung;Kang, Min-Woo;Woo, Ji-Youn;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.597-601
    • /
    • 2006
  • There are considerable amount of man power and time spent for analysis and selection of various materials due to the inadequate application system and rapid searching process of material related information in each stage of building production process. Also, due to the insufficiency in recycling system of important information created for each process, they are hoarded at each task stage and project completion. As a result, because of the repetition of the similar/identical tasks on each process, it is the major reason for impeding the efficient employment of manpower of the company and decreasing competition of the company. Moreover, in selecting finish material in the project field, there are many difficulties due to the lack of technical information such as product characteristics and field applications. The construction quality also affects the profit and loss of the product which calls for a need to develop continued information management system that the finish material related examples could be shared in real time. The objective of this study is to propose a building finish material information which the real time research and application is possible to raise the productivity. TO do this, the current material information task status analysis and questionnaire research should be conducted to understand the demand of system development and reflect the result onto the system for easy access and application. Therefore, the building finish material information system for enhancement of productivity of construction task proposed in this study is expected to be utilized in enhancement of construction quality, maximization of company profit, and strengthening of company competition.

  • PDF

Automating Warehouse Management Using a Bar-Code System (바-코드 시스템을 이용한 창고관리의 자동화)

  • 이성열
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.1
    • /
    • pp.20-27
    • /
    • 1999
  • This study presents an Automated Warehouse Management System (AWMS) using a bar-code system The AWMS has been designed to be associated with an Integrated Production Management System (IPMS), which basically includes the following four modules i.e the sales management, production management, material management, and data management. Now, whenever storage or retrieval of the material occurs in the warehouse, the events could be processed quickly and accurately only through reading the 13 digit bar-code including 5 digit position code and simply typing in the number of material. Consequently, the AWMS associated with IPMS could automatically coincide the item counts on document with those in the warehouse. Also, this makes it possible to identify the material quantities in real time.

  • PDF

An Application for Tracking the Location of Material using RFID and Wireless Network Technology (RFID와 무선네트워크 기술을 이용한 자재위치파악 방안)

  • Lee, Nam-Su;Song, Jae-Hong;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.523-528
    • /
    • 2006
  • The management of construction materials is one of the important administration factor to perform construction projects. If it is not flexible to supply necessary materials to a workplace at a proper time, some problems such as a construction cost increase, an operation delay, a lowering of work efficiency and etc. could occur during the progress of work. Therefore, tracking the precise location of materials is important and necessary to input materials in the accurate place. Although Location sensing techniques comprise GPS, Active Badge, EasyLing and so forth, there are technical limitations to apply these techniques on construction site. Accordingly, in this paper, we propose the technically feasible method to automatically locate materials on site using recent RFID and wireless network technologies.

  • PDF

Optimal Inventory Management for Rebar Fabrication Process in Construction Process (건설현장 철근작업 프로세스상의 적정 자재재고 관리 방안에 관한 연구)

  • Jung, Do-Young;Park, Sang-Hyuk;Kwak, Soo-Nam;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.702-707
    • /
    • 2006
  • There have been certain extent of material inventory in construction site because of difficulties in ordering by small quantity, strategy of securing future requirements and prevention of delay. However, carrying these inventory entails a financial cost called inventory holding cost and decrease construction productivity, so proper inventory management in construction industry is important for construction efficiency and cost reduction. This study tries to find analytical method of inventory management. It includes ordering decision which decide how much to order and when to order. Setting these strategies including deciding safety inventory, input and ouput variability are able to controled.

  • PDF

A Study on Computerization Method for the Quality Test Management System in Construction materials (건설자재 품질시험결과 관리시스템 구축방안 연구)

  • Kim, Young-Jin
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.37-39
    • /
    • 2012
  • 건설현장에서 의뢰하여 품질검사전문기관에서 대행하는 건설자재의 품질시험 검사업무에 대한 신뢰성 제고를 위해 품질시험 검사 의뢰절차 및 지방국토관리청의 품질검사전문기관 등록 관리 현황을 조사하고, 품질검사전문기관에서 품질시험 검사성적서 및 시험과정자료를 정보시스템에 입력하여 관리할 수 있는 정보시스템 구축방안을 도출하고자 한다.

Development of a Materials Management System Considering Construction Supply Chain Management (건설공급사슬을 고려한 건설공사 자재관리시스템 개발)

  • Jang, Myung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.87-93
    • /
    • 2009
  • A construction supply chain needs an integrated information system, as the general contractor and subcontractors must communicate regularly with one another and share a substantial amount of information in their cooperative work. In the construction industry, supply chain management is necessary in the management of a system, including business process improvement, participant-oriented management, and the supply chain. This research proposed a supporting system and developed the prototype focusing on materials that play an important role in the supply chain. Construction projects are managed mainly through schedule management. As such, supply chain management should be linked with schedule management. The research implemented a prototype of the supporting system for construction supply chain management. The prototype was implemented in Microsoft Project using VBA, including a simulation tool based on @Risk for Project.

A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

  • PDF