• Title/Summary/Keyword: 자재소요명세서

Search Result 2, Processing Time 0.017 seconds

Design of a Hierarchical Dimension of the Bill of Materials Type (자재소요명세서 유형 계층차원의 설계)

  • Jang Se-Hyeon;Yu Han-Ju;Choi In-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.11 no.4 s.42
    • /
    • pp.243-250
    • /
    • 2006
  • A recursive relationship is a relationship among entities of the same class. N : M recursive relationships can be used to represent bills of materials. A bill of materials is a special data structure that occurs frequently in manufacturing applications. This data structure is a hierarchy. Most business dimensions have a hierarchical structure. In this study, a design of a hierarchical dimension of the bill of materials type is carried out. As with other N : M relationships, an intersection table that shows pairs of related rows is created, and this table is transformed into a dimension in the OLAP(OnLine Analytical Processing) model. This transformation consists of two tasks: (1)replacing the first column of the intersection table with the lowest level of the dimension: and (2)replacing the second column of the table with the only upper level of the dimension. A case multidimensional information system using the hierarchical dimension is also developed.

  • PDF

High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material) (트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템)

  • Na Hong-Bum;Lee Hyung-Gon;Park Jin-Woo
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF