• Title/Summary/Keyword: 입찰실무자

Search Result 11, Processing Time 0.019 seconds

Predicting Fair Bidding Behavior of Bidding Practitioners using TPB (TPB를 활용한 입찰실무자들의 공정입찰 행동 예측)

  • Cho, Jin-Ho;Shin, Young-Su;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.23-31
    • /
    • 2024
  • This study highlights the importance of understanding the fair bidding behavior of bid practitioners in order to eliminate bid-rigging, which has a detrimental impact on the construction industry and the overall economy. The research collected survey data from bid practitioners in the Daegu and Gyeongbuk regions of South Korea and analyzed the causal relationships between attitudes towards bid-rigging, subjective norms, perceived behavioral control, and the intention to engage in fair bidding using PLS-SEM analysis. The analysis results confirm that attitudes towards bid-rigging and perceived behavioral control are significant variables predicting the intention to engage in fair bidding among bid practitioners. This indicates that bid practitioners' perceptions of bid-rigging and personal behavioral control influence their willingness and actions towards fair bidding. The insights gained from this research provide valuable insights into bid practitioners' behavioral changes and can aid in the development of policies and measures to promote fair bidding and prevent bid-rigging.

설계$\cdot$시공 일괄입찰제도 개선

  • 조영준;남정수;김홍만;이태식
    • 월간 기계설비
    • /
    • s.35
    • /
    • pp.28-42
    • /
    • 1993
  • 최근들어 우루과이 협상의 진전이 가사화됨에 따라 서비스업의 개방이 현실적인 사항으로 인식되고 있고, 서비스업으로 분류되는 건설업도 개방압력에 직면해 있다. 건설시장의 개방에 따라 가장 크게 우려되는 부분은 국내업체의 설계 및 엔지니어링 분야를 들 수 있으며 선진외국 건설업체와 비교했을 때 매우취약한 실정이다. 이에 대처하기 위해 설계 및 엔지니어링 기술을 육성시킬 수 있는 기술경쟁입찰 풍토를 조성할 필요성이 있으며 설계 및 시공단계의 상호조정을 통하여 공사수행을 보다 효율적으로 수행할 수 있는 일괄입찰제도의 확대운용은 필수적이라 하겠다. 따라서 본 연구는 국내 일괄입찰공사의 확대시행을 위한 현행 일괄입찰제도의 개선방향을 설정하고 일괄입찰제도 절차의 개선안을 제안하여 설계입찰자의 평가 및 낙찰자 선정에 대한 구체적인 개선안을 도출하고자 하였다. 이와 같은 개선방안의 마련을 위해 설문 및 면담조사가 실시되었으며 최종적으로 실무자들과의 총의회를 통하여 최종안을 제안하였다. 본 연구의 주된 내용은 일괄입찰공사유형의 제시, 사전자격심사, 입찰서류 및 입찰기간, 입찰자평가시 발주처참여, 낙찰자선정, 실시설계판정, 건축$\cdot$토목$\cdot$기계$\cdot$설비에 대한 새로운 평가체계 제시 등으로 요약할 수 있다.

  • PDF

A Study on Predicting the Potential for Bid-Rigging among Bidders using FTT in Public Construction Projects (FTT를 활용한 입찰실무자의 입찰담합 가능성 예측 연구)

  • Cho, Jin-Ho;Shin, Young-Su;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.36-44
    • /
    • 2023
  • The aim of this study is to predict the potential for bid-rigging among public construction bidders and develop preventive and responsive measures. By employing the Fraud Triangle Theory (FTT), which considers the factors of opportunity, pressure, and rationalization, we analyze and explore the bid-rigging potential among construction industry professionals. A survey is conducted among General and specialized construction firms to validate the FTT research model and predict individual bid-rigging tendencies. The results indicate that higher levels of pressure, greater opportunities, and stronger rationalization increase the likelihood of individual bid-rigging. Moreover, more opportunities and stronger rationalization also raise the potential for bid-rigging by others. Understanding these dynamics enhances our knowledge and contributes to the development of policies aimed at preventing bid-rigging.

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

A Study on the Perception Gaps on the Causes and Improvement Measures of Bid Rigging in the Construction Industry due to the Abolition of Industry Regulations (업역규제 폐지에 따른 입찰담합의 원인과 개선방안에 관한 인식 차이)

  • Cho, Jin-ho;Shin, Young-Su;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.75-83
    • /
    • 2024
  • This study examined the causes and remedies of bid-rigging in the construction industry through a survey of procurement practitioners. The study identified potential problems from the business, construction, and bidding environments, and proposed improvements to the procurement and bidding systems to address these problems. The study found that transparency, fairness, and diversity are important factors in reducing bid-rigging. These factors can be achieved through a variety of measures, such as expanding bidding systems, strengthening fairness standards, and increasing the diversity of participating companies. The study also found that unfair subcontracting regulations are a problem that needs to be addressed. There were differences in the perceptions of the causes of bid-rigging between the general and specialized construction groups. However, there was no difference in the perceptions of improvements to the procurement system between the two groups. This suggests that a consistent solution to bid-rigging can be found. The study's findings are expected to contribute to the resolution and prevention of bid-rigging in the construction industry.

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

A Study on Improvement Direction for Construction Environment of Small Houses -Focused on Expert Group- (소형주택의 건설 프로세스 개선방향에 관한 연구 -전문가 집단을 중심으로-)

  • Ha, Jun-Geun;Yoo, Seok-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.7
    • /
    • pp.388-400
    • /
    • 2018
  • Small houses are continuously supplied after the alleviated housing act enacted in 2009. This study aimed to conduct a survey among an expert group associated with small house construction, propose problems by discovering difficulties and vulnerable points small and medium-sized construction companies experience while launching construction works as well as factors that impede the safety and housing environment of small houses. Furthermore, it ultimately intends to propose improvements. First, low-priced order is a major cause of unreasonable contract. Most companies were found to have low-priced orders in order to manage order performance. Low bidding and low-priced order are implemented to maintain construction businesses, ultimately threatening the safety environment of buildings. In addition, it is assumed that moderate bid periods and construction periods should be guaranteed. Second, work standardization for small and medium-sized companies is needed due to numerous cases that failed to meet order process. Additionally, regular instruction is required as many employees are not fully aware of relevant contents. Third, the most urgent policy direction turned out avoidance of low-priced bidding and removing insolvent enterprises from the market. Small and medium-sized construction companies that primarily build small houses undergo poor work condition. Therefore, the safety environment of small houses should be enhanced through work standardization and avoiding low-priced order.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects (해외건설공사 수익성 영향인자의 계층구조 및 사레적용에 관한 연구)

  • Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.64-76
    • /
    • 2006
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposure through contract negotiation and its adjustment. This research discusses the trend of environment in international construction markets. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects, and it analyzes the key factors by using statistical methods. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors using the result of statistical analysis, literature review and structuring their cause-and-effect relationships. The profitability casual hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative and quantitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.