• Title/Summary/Keyword: 입찰·계약단계

Search Result 37, Processing Time 0.02 seconds

Exploratory Factor Analysis of the Causes of Corruption in Iranian Construction Projects (이란 건설 프로젝트의 부패 원인에 대한 탐색적 요인 분석)

  • Kim, Soo Yong;Rad, Kiyanoosh Golchin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.369-376
    • /
    • 2018
  • The majority of construction projects, from the initiation phase to the project completion and operation phase, are influenced by various types of corruption. Iran, as a developing country, has been suffering from this issue in bidding, tendering procedure, contracts etc. Therefore, due to the importance of this issue, this study attempted to identify the causes of corruption and evaluate the most significant factors in the construction projects in Iran. To this aim, an intensive literature review was performed to investigate the various types of corruption and identify the potential factors causing corruption in construction projects. The questionnaire survey was designed, considering twelve forms of corruption, including 77 causes of corruption in construction projects in Iran. Out of 220 distributed questionnaires, 188 were returned by the participants. The valid collected data sets were analyzed and then Exploratory Factor Analysis was applied. It was discovered that "Inappropriate power-sharing," "Lack of obligation for human resources to properly use resources and abide by the rules and regulations" and "Lack of any monitoring of the government's performance" are the most significant factors. Findings from the study would be valuable for the construction projects authorities and academia in order to combat corruption in the construction projects.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

A Modeling of Web-service for Construction CALS/EC Standard Guideline by using Component Based Development (컴포넌트 기반 개발방법론에 의한 건설 CALS/EC 표준지침 웹서비스의 모델링)

  • 이상호;정용환;김소운
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.78-83
    • /
    • 2003
  • 본 연구에서는 건설CALS/EC 기반의 정보화 추진을 위한 정보시스템을 개발할 때 적용되는 기존의 소프트웨어 개발방법론의 문제점을 분석하고, 표준화되지 않은 개발방법론의 적용으로 시스템 개발에 비효율적인 비용을 투자하는 문제점과 특성상 입찰, 구매, 계약 등 분야별로 상이한 기능의 업무에 따라 구축되는 건설산업 정보화에 있어서 상호간에 데이터 및 프로세스를 원활히 통합하지 못하므로 인하여 발생되는 개발의 중복성, 정보 활용의 비효율성 등의 문제점을 개선하고자 하였다. 이를 위하여 최근 새로이 부각되고 있는 방법론인 컴포넌트 기반 개발방법론(CBD: Component-Based Development)을 사용하여 건선CALS/EC 표준지침 웹서비스를 위한 시스템의 업무프로세스를 모델링하여 사용자가 쉽게 재사용가능하고 타업무분야에 확대 가능한 방향을 제시하였다. 본 연구를 위하여 기존의 소프트웨어 개발 방법론의 적용상 문제점 분석을 통하여 컴포넌트 기반 개발방법론의 필요성을 증명하고 비즈니스 컴포넌트 프레임워크를 사용하여 건설 CALS/EC 표준지침 웹서비스의 업무프로세스에 적용할 기술적인 방법론을 고찰하고 업무에 효과적으로 적용할 수 있는 업무프로세스 컴포넌트를 제시하였다. 본 연구에서 도출된 컴포넌트 모델은 향후 타업무분야의 시스템을 개발할 때 사용자요구분석 단계부터 별도의 재 작업이 없이 사용될 수 있으며 시스템을 구현할 때 개발 모듈의 중복방지와 용이한 비즈니스로직의 변경 등이 가능하며, 추가의 업무 프로세스나 연관된 다른 분야의 업무프로세스의 반영 및 추가 시 컴포넌트의 활동모델을 쉽게 수정하여 정의함으로써 쉽게 시스템의 기능을 확장할 수 있다.LE 산정에 관한 지속적인 실험적 연구가 이루어져야 하겠다. 증가할 것이다. 또한 부분육을 이용한 완전제품, 적색육제품, 유기농이나 별미식 제품과 같은 형태의 다양한 포장육 제품이 도입 될 것으로 생각되어진다.e in vitro SPF test method will be able to be used as an alternative method for in vivo SPF in case of lotion and cream. replica. A statistically significant improvement of Star Fruit Leaf Extract BG30-treated site was seen in decreased wrinkles. Star Fruit Leaf Extract BG30 results in clinically visible improvement in wrinkling when used topically for 5 weeks. 또한 관계마케팅, CRM 등의 이론적 배경이 되고 있는 신뢰와 결속의 중요성이 재확인하는 결과도 의의라고 할 수 있다. 그리고 신뢰는 양사 간의 상호관계에서 조성될 수 있는 특성을 가진 반면, 결속은 계약관계 초기단계에서 성문화하고 규정화 할 수 있는 변수의 성격이 강하다고 할 수가 있다. 본 연구는 복잡한 기업간 관계를 지나치게 협력적 측면에서만 규명했기 때문에 많은 측면을 간과할 가능성이 있다. 또한 방법론적으로 일방향의 시각만을 고려했고, 횡단적 조사를 통하고 국내의 한 서비스제공업체와 관련이 있는 컨텐츠 공급파트너만의 시각을 검증했기 때문에 해석에서 유의할 필요가 있다. 또한 타당성확보 노력을 기하였지만 측정도구

  • PDF

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

A Design of Internet-Based Safety Guarantee Global Integrated Logistics Management System Framework (인터넷 기반의 안전보장 글로벌 통합물류관리시스템 프레임워크 설계)

  • Hong, Ho-Seon;Hong, Ki-Sung;Lee, Chulung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.5
    • /
    • pp.103-111
    • /
    • 2013
  • This paper provide a framework for an IGILMS(internet-based global integrated logistics management system) which can access and mediate cargo transportations among small- and medium-sized domestic/international logistics corporations as regards cargo, registration and search for space, public tender and negotiation, contract, payment and safety-guarantee, transportation through the internet, wireless communication means, or smart phone etc. In addition, we describe a model to provide customized services in the B2B e-market for IGILMS and the structure and the control of its fulfillment process, and provide technical architecture of the IGILMS for an internet-based global logistics management system. To validate an efficiency of the proposed system, we develop a simulation model and analyze the performance of the proposed system.

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전력시설물공사 감리제도의 현황과 실태분석 및 개선방안에 관한 연구)

  • Seo, Hwang-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.15-17
    • /
    • 2008
  • 본 논문은 현행 전력기술 관리법에 의하여 시행되고 있는 전력시설물공사 감리제도의 제도개선에 관한 연구로서 연구자의 현장 실무경험과 감리제도의 일반사항, 감리업자와 감리원에 대한 사항, 감리업자 선정 및 입찰에 관한 사항을 조사하여 전력시설물공사 감리제도의 현황과 실태분석 및 개선방안을 제시한 내용으로 연구결과는 다음과 같다. 첫째, 법적 및 제도적 측면에서 시급히 개선될 사항이다. 정부는 1995년 12월 법률 제5,132호로 전력기술관리법을 제정하여 전력시설물에 대한 공사감리 업무를 별도 분리 발주하여 전문성을 높이도록 전기 분야 전문기술자에 의해 수행토록 하는 것을 골자로 하는 책임 감리제도를 도입하여 오늘에 이르고 있다. 그러나 공사 준골단계에서 전기사업법 제98조 2항에 의해 위탁업무를 하고 있는 전기 안전공사가 사용전 검사를 함으로서 책임 감리제도의 도입 취지를 무색케 한 정도로 심각한 국면에 접어들었다. 전력기술관리법이 제정되어 13년이 지난 오늘까지도 책임 감리제도가 성공적으로 정착되지 못한 근본적인 문제는 사용전 검사를 전기 안전공사에서 대행하고 있다는 것이다. 물론 그동안의 많은 노력으로 어느 정도의 개선은 있었지만 근본적인 문제가 해결되지 않고서는 전력시설물공사의 감리기술의 전문화를 기대하기 어려운 실정이다. 따라서 책임 감리계도의 성공적인 정착을 위해서는 전기사업법 제98조 2항에 의한 위탁 업무인 사용전 감사 제도를 감리업자에게 돌려줌으로서 책임과 권한을 실질적으로 부여하고 감리회사 자체의 기술력 및 기술자 확보와 기술개발에 필요한 운영자금 및 투자 확대를 유도해 나가야 하며, 무엇보다도 확실한 법적 제도적 뒤받침이 선행되어야 한다. 둘째, 제도적 측면에서 일반건축물은 사업주가 전력시설물공사 감리업자를 임의선정 및 수의계약에 의해 감리업자를 지정하고 해당 공사기간동안 전기 감리원을 투입토록 되어 있어 인건비에 미치지 못하는 저가수주와 다음계약을 위해 어쩔 수 없이 사업주에게 종속되는 경우가 많으며, 이로 인해 감리수행에 혼란이 야기되고 책임소재의 불분명 책임 감리원의 조정 및 통제기능이 약화되는 부작용이 나타나고 있다. 전력시설물공사의 감리는 전력시설물의 안전사고, 비효율 및 부실소지 둥을 방지하기 위해서 필수적이고 발주자 감리업자 시공업체에게 모두 도움을 주는 업무이며, 일정규모이상의 건축물은 자발적인 참여로 유도할 수 있도록 적격심사제도(PQ심사)도입이 적극 필요한 실정이다. 셋째, 운용측면에서 공동주택의 주택법에 의한 전력시설물공사 감리는 사업승인권자가 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 평가기준이 세대수에 따라 정해져 있어 효율적, 기술적 측면에 미치지 못하는 경우가 많다. 수준 높은 감리를 수행하려면 그에 맞는 적정한 감리원의 투입이 필수적이다. 넷째, 운용 및 제도적 측면에서 공공발주 건축물(공동주택 포함)의 전력시설물공사는 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 발주자 소속직원의 감리수행 근거에 의해 자체 감리를 함으로서 시장경쟁 및 민간경제 활성화의 제약, 부정부패 및 비효율 등 사회에 전반적으로 악영향을 끼쳐 하루 빨리 민간 감리업자에게로의 개선이 시급한 실정이다.

  • PDF

A Study on Cause-and-Effect Hierarchy of Profit Factors for the Feasibility Evaluation of Overseas Construction Projects (해외건설공사의 타당성 평가를 위한 수익성 영향인자의 인과관계 계층구조 구축에 관한 연구)

  • Sun Seung-Min;Kim Han-Him;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.373-378
    • /
    • 2003
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market following the outbreak of Iraq war. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposures through contract negotiation and its adjustment. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors from real overseas construction projects and structuring their cause-and-effect relationships. The profitability causal hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.