• Title/Summary/Keyword: 일정 단축

검색결과 326건 처리시간 0.025초

Cost-Schedule Tradeoff in Software Project (소프트웨어 프로젝트의 비용-일정 타협)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • 제13권4호
    • /
    • pp.99-106
    • /
    • 2013
  • Generally, software development schedule compression is decided within 75% of nominal schedule. However, there are some difficulties when we judge the possibility of development schedule compression because a nominal schedule has not been definitely. Therefore, this paper investigates various nominal schedule estimation models and decides the optimum range. Basing on the performance of ISBSG Release 8,614 projects are extracted from the actual 1,595 projects. We presented development effort estimation model from those data. Also, we derived the development schedule model from the development effort. When you apply the proposed model, you will be able to estimate development effort and schedule required for the development more actually.

A Study on the Reduction of LSP(Line Spectrum Pair) Transformation Time Using the Voice Characteristic (음성특성을 이용한 LSP 변환시간 단축에 관한 연구)

  • 강은영;민소연;배명진
    • Proceedings of the IEEK Conference
    • /
    • 대한전자공학회 2000년도 제13회 신호처리 합동 학술대회 논문집
    • /
    • pp.557-560
    • /
    • 2000
  • LSP 파라미터는 일정한 ,스펙트럼 민감도와 낮은 스펙트럼 왜곡을 보이고 선형보간이 용이하다는 장점을 갖는다. 피러나 LPC 계수를 LSP 파라미터로 변환하는 방법이 복잡하여 계산시간이 많이 소요된다. 기존의 LSP 변환 방법 중 음성 부호화기에 주로 사용되는 Real Root 방법은 근을 구하기 위해 주파수 역을 순차적으로 검색하기 때문에 계산시간이 많이 소요된다. 본 논문에서 제안하는 방법은 음성 특성을 이용하는 것으로, 묵음의 경우는 묵음 구간에서 일정하게 나타나는 LSP 파라미터의 분포 특성을 이용하여 검색하고 유/무성음에 대해서는 LSP 파라미터의 분포도에 따라 검색구간의 순서와 검색간격을 달리한다. 또한, 모음에 대해서는 제1 포만트와 제2 포만트의 연관성을 고려하여 검색구간을 조절한다. 기존의 Real Root 방법과 제안한 방법을 비교한 결과 검색시간이 평균 46.5% 단축되었다.

  • PDF

A Case Study of Production Scheduling for Core Products (코아제품의 생산일정계획 수립 사례연구)

  • 김봉진;김춘식
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제4권3호
    • /
    • pp.252-256
    • /
    • 2003
  • This paper deals with a case study on the development of computerized scheduling system for core products. We propose a heuristic algorithm which is based on the sequencing rules and the allocation rules to satisfy the due date for each product, and develop a scheduling system for the manufacturer of core products. The system operates under a client/server circumstance. The important information constitutes a database, and it can be retrieved whenever it is needed. The benefits of the scheduling system are the exclusion of hand operations of data, the reduction of execution time for production planning and the reduction of average inventories.

  • PDF

Development of Trip Scheduling Program Consideny User Constraints (사용자 제약조건을 고려한 여행추천 프로그램의 개발)

  • Cho, Dae-Soo;Cho, Sin-Young;Im, Suk-Young;Kim, Seong-Gyu
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 한국컴퓨터정보학회 2013년도 제48차 하계학술발표논문집 21권2호
    • /
    • pp.279-281
    • /
    • 2013
  • 본 논문은 일정을 고려한 추천여행 프로그램으로써 휴가철 외에도 짧은 휴일 간 사용자의 일정을 고려한 효율적인 여행을 추천해 준다. 이 프로그램은 고성능 컴퓨팅 시스템의 성능을 통해 효율적인 여행루트를 추천한다. 본 연구는 출발지에서 도착지간의 이동시간을 최소화한다. 또한 이 연구는 출발지와 도착지를 입력 하였을 때, 프로그램 내에서 그 거리상에 위치한 추천여행지를 알려준다. 이때 작업을 할당 받은 프로그램은 또 다른 GPS시스템과 일정 프로그램으로 작업을 이주시켜 여행 루트와 일정 작업을 균등하게 유지함으로써 작업의 대기시간을 줄이고, 각 작업의 수행시간을 단축한다. 본 논문에서는 시뮬레이션을 통하여 제안하는 일정을 고려한 추천여행 프로그램이 기존의 스스로 계획하여 떠나는 여행의 우수함을 보인다.

  • PDF

육계생산에 있어 출하일령을 단축시키는 방법

  • 오세정
    • KOREAN POULTRY JOURNAL
    • /
    • 제9권2호통권88호
    • /
    • pp.72-76
    • /
    • 1977
  • 부로일러를 육성함에 있어서 일정한 체중의 상품을 만들어 판매할 때 남보다 출하일령 즉 사육일령을 단축시킨다는 것은 사료효율의 향상뿐만이 아니라 생산원가치의 절감, 생산능력의 향상 등 수익성에 큰 영향을 미치게 하는 요인이 된다. 그러면 출하일령을 단축시키자면 병아리의 선택을 무엇보다도 잘하여야 하며 마음은 사료의 품질여하가 성장 및 효율에 큰 영향을 미치게되며 나아가서 같은 병아리에 같은 사료라 할지라도 시설과 환경 및 관리방법의 양부에 따라 큰 영향을 미치게 하니 이점을 특히 고려혀여야 한다. 같은 병아리에 같은 사료로 사용하였다하더라도 환경과 관리방법 여하에 따라서 1.5kg의 체중을 만드는데 50일이 소요된 자가 있는가하면 60$\~$70일이 걸리는 경우가 있으며 더욱이 병아리와 사료까지 품질에 차이가 있는 경우에는 더욱 큰 차이가 생겨 생산원가면에서 생계 1kg중 400원이면 가능한 경우가 있는가하면 600$\~$700원까지 원가가 소요되는 경가 있다. 따라서 수익에 큰 영향을 미치게 되는 것이다. 일반적으로 사육자들이 이러한 것을 잘 알면서 안일과 타성, 인습, 정신 등으로 개선되지 못하고 손해를 보는 경우가 많다. 사육자들에게 현 실정에 입각하여 주의할 점을 제기하므로서 유의하여 시정할 것을 부탁하고자 한다.

  • PDF

Modified Software Equation for Software Cost-Schedule Tradeoff (소프트웨어 비용-일정 타협을 위한 수정된 소프트웨어 공식)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • Journal of the Korea Society of Computer and Information
    • /
    • 제16권9호
    • /
    • pp.35-43
    • /
    • 2011
  • To develop a software, there is a relationship between development organization's productivity, effort, development schedule, and software size. It is software equation that motive these relations. Basically, relationship between size-effort and size-schedule is applied. If this relationship is not proper, there would be no effect of the cost-schedule tradeoff equation that is derived from software equation, and the manpower profile analysis, etc. To solve these unwanted problems, we presented a modified software equation and a cost-schedule tradeoff model based on the modified software equation. To improve software development success rate, applying proposed model will help in contract negotiation or bid.

Studies on a Technique of the Generation shortening for a Breeding Efficiency promotion of Rape-oil Improvement -III. Effects of Ethrel (2-chloroethyl phosphonic acid) on Maturity shortening and Germination power in Brassica napus L.- (유채 성분육종 효율을 증진키 위한 세대단축 기술개발에 관한 연구 -제 III 보. ETHREL 처리가 유채 등숙기간 단축과 발아능력에 미치는 영향-)

  • Jung-Il Lee;Eung-Ryong Son;Gi-Pyeong Choo
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • 제20권
    • /
    • pp.107-114
    • /
    • 1975
  • To develop the technics of generation shortening for the breeding of rape oil composition. effect of the ethrel and hydroperoxide treatment for the increasing of germination ability during maturing period was investigated. It was the most effect ire for a generation shortening that the seeds after, 10 days treated with $H_2O$$_2$-0.5% and 2, 000ppm of ethrel and after 15 days treated with $H_2O$$_2$-0.5% and 500ppm of ethrel on 15 day after flowering were germinated 76% and 90% respectively. It suggested that effect of ethrel and hydroperoxide was multiple and 4-5 generations could pass in a year because one generation needed only 66-71 days.

  • PDF

Simulation on the shape of tuna longline gear (다랑어 연승어구의 형상에 관한 시뮬레이션)

  • 이지훈;이춘우
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • 제39권4호
    • /
    • pp.305-317
    • /
    • 2003
  • Underwater shape and hook depth in tuna longline gear are important factors to decide fishing performance. It also should be considered that management and analysis of hooked rate data from hooked fish species and sizes, and each fishing would be used as a reference data in the future fishing. In this research, after analyzing underwater shape of tuna longline gear by current direction and speed using simulation, experiments were executed in flume tank to verify accuracy of the analysis. Also using the depth of each hook from the simulation, a database system was setup to process the data of bait and hooked fish species. The results were as follows;1. When the attack angle and the shortening rate are fixed, a decrease of the hook depth is proportion to an increase of current speed. 2. When the shortening rate and current speed are fixed, a decrease of hook depth is proportion to an increase of attack angle. 3. When the attack angle and velocity of flow are fixed, a decrease of hook depth is proportion to an increase of shortening rate 4. As a result of comparison between the underwater shape by simulation and that by model gear, the result of the simulation was very close to that of model gear within $$ {\pm}3%$$ 3% error range. 5. In this research, hooked rate database system using hook depth of simulation can analyze the species and size of fish by the parameter; bait. hook depth, so It could be helpful to manage and analyze the hooked data on the field.

Improvement of arc quenching room in Molded Case Circuit Breaker using Finite Elements Methode (유한요소법을 이용한 Molded Case Circuit Breaker소호부의 소호능력 향상)

  • Kim, Yu-Min;Cho, Sung-Hoon;Kwon, Jung-Hun;Lim, Kee-Joe
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1550-1551
    • /
    • 2011
  • 본 논문은 가정에서 사용하는 중 저압용 차단기의 차단 능력을 향상시키기 위한 방법에 초점을 두었다. MCCB의 차단 능력은 MCCB내부 부품들의 재료나 형상 그리고 배열 등 여러 요소에의해 결정된다. 특히 본 논문에서는 MCCB 그리드의 형상을 변화하여 소호시간을 단축하는 방법을 제안하였다. 사고에 의해 차단기가 작동하게 되면 차단기 내부 접점에서 Arc가 발생하게 된다. 이때 발생된 Arc에의한 2차 사고를 방지하기위해, Arc를 빠른 시간에 소호시켜야한다. Arc가 발생하게 되면 Arc내부는 도체처럼 전류가 흐르게 되는데 이 전류에 의해 소호부의 그리드를 따라 자속이 형성된다. 그리드의 형상에 따라 Arc 기둥 주변에 불균형적인 자속이 유도되고 이 불균형한 자속에 의해 Arc 주변에는 불균형한 로렌츠힘이 발생하여 일정 방향으로 힘이 작용하게 된다. 이때 발생한 로렌츠힘 에의해 Arc 기둥은 그리드 방향으로 소호된다. 분석을 위해 유한요소법을 이용한 시뮬레이션을 사용하였고 그리드 형상 변화를 통해 일정방향으로 로렌츠힘이 변화 전보다 증가한 결과를 얻었다. 본 논문의 내용에 추가로 그리드 내부에서 자속의 이동을 효율적으로 전달하기위한 방법을 연구하면 더 큰 로렌츠힘을 얻어 소호시간을 단축시킬 수 있을 것으로 사료된다.

  • PDF

Periodic Scheduling Problem on Parallel Machines (병렬설비를 위한 주기적 일정계획)

  • Joo, Un Gi
    • Journal of Convergence for Information Technology
    • /
    • 제9권12호
    • /
    • pp.124-132
    • /
    • 2019
  • Scheduling problems can be classified into offline and online ones. This paper considers an online scheduling problem to minimize makespan on the identical parallel machines. For dynamically arrived jobs with their ready times, we show that the sequencing order according to the ERD (Earliest Ready Date) rule is optimal to minimize makespan. This paper suggests an algorithm by using the MIP(Mixed Integer Programming) formulation periodically to find a good periodic schedule and evaluates the required computational time and resulted makespan of the algorithm. The comparition with an offline scheduling shows our algorithm makes the schedule very fast and the makespan can be reduced as the period time reduction, so we can conclude that our algorithm is useful for scheduling the jobs under online environment even though the number of jobs and machines is large. We expect that the algorithm is invaluable one to find good schedules for the smart factory and online scheduler using the blockchain mechanism.