Optimized Boreoung Dam Emergency Diversion Tunnel Operation Rule Study, considering Water Quantity-BOD-Electric Power in Boreong Dam Water Supply Network (보령댐계통 물 공급망 운영에 있어서의 수량-수질(BOD)-전력을 고려한 보령댐 비상도수로 최적운영 Rule 연구)
-
- Proceedings of the Korea Water Resources Association Conference
- /
- 2020.06a
- /
- pp.42-42
- /
- 2020