• Title/Summary/Keyword: 의사결정계층

Search Result 449, Processing Time 0.027 seconds

A Study on the Priority and Evaluation Criteria of the Korea Export Insurance System (수출보험제도 기능의 우선순위 및 평가기준에 관한 연구)

  • Son, Yong-Jung
    • International Commerce and Information Review
    • /
    • v.13 no.1
    • /
    • pp.179-196
    • /
    • 2011
  • This study aims to measure the relative importance of trade insurance using AHP developed by Thomas Saaty of Pennsylvania in early 1970s. Moreover, it provides help in the development of a comprehensive strategy of trade insurance. To obtain priority of trade insurance in its functions, this study discovered significance and relative importance of two evaluation standards and four individual evaluation items. Of the two evaluation standards, importance of credit exposure was 63%. It was discovered that it was more important than political means (37%). Of the four individual evaluation items, importance of banking supplementation was 60%. It was more important than credit investigation of overseas traders (40%). Importance of trade promotion policy was 69%, which was more important than removal of anxiety in trade (31%). As a result of comparing priorities of the f tire evaluation items, priority of banking supplementation was 38% followed by trade promotion policy means (26%), credit investigation of overseas traders (25%) and removal of anxiety in trade (12%).

  • PDF

VTS Task Assessment using AHP (AHP를 활용한 VTS업무 중요도 평가)

  • Kim, Joo-Sung;Jung, Cho-Young;Kim, Kwang-il
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.261-262
    • /
    • 2018
  • The tasks of Vessel Traffic Services are classified according to the content of the information provided. Since the establishment of the first Vessel Traffic Service center in 1993 at Phohang harbour, it has been steadily developed and its work domain and scope have been expanded. In this paper, the importance and workload of Vessel Traffic Service operators were analyzed according to classification of the tasks. In order to measure the importance and workload, questionnaires were conducted for the operators nationwide, and conclusions were drawn using the multi-criteria decision making process. The relationship between the importance of tasks and the workload might be used as the weights for setting the service areas in the future. Furthermore, it is expected to be used as the data of changable sector operation based on the relationship between importance and workload.

  • PDF

Development of Framework for Integrated Work-Risk Breakdown Structurebased on Fatal Incident Cases in Construction Industry (중대재해 사례에 기반한 건설업의 작업 및 위험분류체계 통합 프레임워크 개발)

  • Jeong, Jaemin;Jeong, Jaewook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.11-19
    • /
    • 2020
  • Since an accident in construction industry has been higher than others for decades, the accident in construction industry should be decreased. To prevention this problem, the work breakdown structure (WBS) and risk breakdown structure (RBS) are presented. the WBS and RBS, are hierarchy structure which can find fatal incident considering type of building and type of work easily and quickly. So, this study aims to develop framework for the integrated WBS-RBS to prevent fatal incident on construction industry. The research process is conducted by following 3 steps: (I) collection of data; (II) classification of data; and (III) development of the integrated WBS-RBS. The result of this study can propose the most dangerous fatal incident aspect of type of building, type of work, and type of accident. Through the result, the decision maker can reduce or eliminate fatal incident considering type of building, type of work and type of accident in construction industry.

A Study on Location of Mobile Field Testbed (모바일산업클러스터구축 입지선정에 관한 연구)

  • Moon, Joon-Seo;Jang, Won-Gyu
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.3B
    • /
    • pp.159-164
    • /
    • 2008
  • For increasing productivity of domestic IT industry, government and local agencies have some plans to establish industrial clusters to provide local firms with testbed, R&D center, and cooperative research project. The most difficult problem in this process is to decide the location of them by resonable methodology. In this paper, the subject is to find what the factors to be considered in locating facilities and industrial clusters invested by government are and how to decide efficiently. First, we look over some cases of other countries, and then find assessment items for locating. Finally we analyze these items and assessment model by the analytic Hierachy Process(AHP) and make conclusion, As a conclusion, we find the result that there are some differences between the object of govenmental policy and needs of industry. 'The base infrastructure for telecommunications environment' is more important to be considered by the firms than 'The local benefit of the public'

Analysis of Longevity Factor through Japan shinise (일본 시니세를 통해 본 장수요인분석)

  • Choi, Seung-Il;Kim, Dong-Il
    • Journal of Digital Convergence
    • /
    • v.13 no.1
    • /
    • pp.85-92
    • /
    • 2015
  • Recently more and more shortened of corporation's sustainable longevity at the enterprise, and enterprise environment is also changing drastically. In this study, we wanted to obtain a solution that enable to continue the company's corporate longevity through critical factor analysis of the Japan Shinise. In the analysis results of Japan corporation as Doraya, Deicoko, Shinise longevity, we can explain about critical factors like that credit, tradition, customization, products development, changes of management methods and finding a global new markets. Also, In this study, analyzed a significance of critical factors for focusing on each cases and theories using Analytic Hierarchy Process(AHP), and did prediction and analysis about critical longevity factors. However, it need to collect sufficient data and a lots of variables for input. because the sample may be it insufficient. Results of the study, will be expected to be a useful guide for analysis of longevity factors at the company in the future.

A Model Study for Development of Evaluation Criteria for Smart Farm Horticultural (시설원예 스마트 팜 평가 기준 개발을 위한 모델 연구)

  • Kim, Tae-Hyeong;Kim, Dae Ho
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.9
    • /
    • pp.339-345
    • /
    • 2017
  • Recently, agriculture and the environment has changed dramatically due to global warming and abnormal weather. In particular, it is necessary to develop new agricultural techniques according to transforming the growing environment of agricultural crops. Therefore, "Smart Farm" building technology for controlling agricultural environment and improving efficiency for ICT technology development has recently been introduced. However, in reality, systematic and objective evaluation items are absent at various levels and management levels that affect the management environment of the smart farm. In this research, it derived the importance index among the factors associated with Smart Farm technology by AHP method. As a result, in order to evaluate comprehensive operation and management of the smart farm, the two evaluation fields(sensor device and control/information management system) were selected as the top evaluation items. These results mean that system that can detect the growth environment information of agricultural crops and control the growing environment is more important than anything, when smart farm is applied. It is judged that the results of this research can be used as basic data for making evaluation indicators associated with the introduction of smart palm technology in the future.

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase (공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안)

  • Jeong, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.111-119
    • /
    • 2008
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

A Study on the Design Evaluation Indicators and Improvements of Urban Public Space (도시 공공공간 디자인 평가 지표 도출 및 개선 방안 연구)

  • Lee, Hoon-Gill;Lee, Joo-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.8021-8029
    • /
    • 2015
  • This study obtains design assessment indexes that should be considered in order to improvements of the public space was to analysis the importance in the public officials/academics and practitioners side. Obtained assessment topics in accordance with characteristic of public space through previous research to them and after a detailed selection indicators was so lead through the FGI. Derived surface was subjected to the significance analysis AHP through the survey expert. For this study, the importance of the public space are working professionals usability, publicness, environment, connectivity, identity, spatiality the order, public officials/academics usability, environment, connectivity, identity, spatiality, publicness the order. In addition, professionals working in the comprehensive analysis of the most important priority was to recognize safety, public officials/academics of the most important element appeared to have cleanliness. The results obtained in this study will be used as an index that can be used in planning and evaluation for consideration of the next improvement of public space.

The Risk Factor Analysis of Power Line Tunnel Using the AHP Method in Construction Stage (AHP기반 지중 전력구 굴착 위험요소 평가)

  • Woo, Sang-Kyun;Kim, Kyung-Jin;Kim, Tae-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.5
    • /
    • pp.122-129
    • /
    • 2013
  • In this study, the risk factors which derive from the ground condition of typical construction sites are put forward. In order to prioritize the risk elements, the analytical method of AHP was used. The result of using a weighting factor for each risk analysis showed that if the constituency index is less than 0.1, then reliable results and priorities for each of the risk elements can be calculated using the AHP method. From now on, if the range of measured value can be established, the risk or safety value of concrete structures for power lines can be applicable.