• Title/Summary/Keyword: 유역의 물환경 관리

Search Result 472, Processing Time 0.036 seconds

Estimation of Pollution Contribution TMDL Unit Watershed in Han-River according to hydrological characteristic using Flow Duration Curve (유량지속곡선을 이용한 수문특성별 한강수계 총량관리 단위유역의 오염기여도 추정)

  • Kim, Dong Young;Yoon, Chun Gyeong;Rhee, Han Pil;Choi, Jae Ho;Hwang, Ha Sun
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.6
    • /
    • pp.497-509
    • /
    • 2019
  • After the Total Maximum Daily Loads(TMDLs) was applied, it became beyond the limit of concentration management. However, it does not adequately reflect the characteristics of various watersheds, and causes problems with local governments because of the standard flow set. Thus, in this study, the Han River system is organized into four groups in estimating the Pollution Contribution by applying the Flow Duration Curve(FDC) created by the daily flow of data from the HSPF. And the method of this study is expected to be valuable as basic data for the TMDLs. As a result, Group I contains the main watersheds with no large hydraulic structures and tributary watersheds. There is no specificity in the FDC and the Pollution Contribution is estimated as rainfall runoff. Group II contains watersheds near the city where the FDC is maintained above a certain level during the Low Flow Conditions and the Pollution Contribution is estimated as the discharge flow of large scale point pollution facilities. Group III contains the main watersheds in which the large hydraulic structures are installed and FDC is curved in the Low Flow Conditions. So the Pollution Contribution is estimated as the water quality of the large hydraulic structures. Group IV contains the upstream in mainstream watersheds in which the large hydraulic structures are installed and the FDC is disabled before the Low Flow Conditions. As the flow is concentrated in the High Flow Conditions, the non-point pollution sources are estimated as the Pollution Contribution.

Application of FDC and LDC using HSPF Model to Support Total Water Load Management System (오염총량관리제 지원을 위한 유역모형 기반 유량지속곡선 및 부하지속곡선 활용방안)

  • Lee, Eun Jeong;Kim, Tae Geun;Keum, Ho Jun
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.1
    • /
    • pp.33-45
    • /
    • 2018
  • In this study, we discussed the application of Watershed model and Load Duration Curves (LDC) in Total Water Load Management System. The Flow Duration Curves (FDC) and the LDC were generated using the results of the daily HSPF model and analyzed on monthly or yearly flow duration variability, and non-point pollutant discharge loads by entire flow conditions. As a result of the calibration and verification of the HSPF model, both the flow and the water quality were appropriately simulated. The simulated values were used to generate the Flow Duration Curve and the Load Duration Curve, and then the excess rate by entire flow conditions was analyzed. The point and non-point pollutant discharge loads for entire flow conditions were calculated. It is possible to evaluate the variability of water quality in specific flow duration through the curves reflecting the flow duration variability and to confirm the characteristics of the pollutant source. For a more scientific Total Water Load Management System, it is necessary to switch from a current system to a system that can take into account the entire flow conditions. For this, the application of the watershed model and load duration curve is considered to be the best alternative.

Development of a Flow Duration Curve with Unit Watershed Flow Data for the Management of Total Maximum Daily Loads (수질오염총량관리 단위유역 유량측정자료를 이용한 유황곡선 작성)

  • Park, Jun Dae;Oh, Seung Young;Choi, Yun Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.224-231
    • /
    • 2012
  • It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.

Estimation of Soil Erosion using SATEEC and USPED and Determination of Soil Erosion Hot Spot Watershed (SATEEC과 USPED를 이용한 토양 유실량 산정 및 우선관리 유역 선정 평가)

  • Seo, Il Kyu;Park, Youn Sik;Kim, Nam Won;Moon, Jong Pil;Ryu, Ji Chul;Ok, Yong Sik;Kim, Ki-Sung;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.3
    • /
    • pp.497-506
    • /
    • 2010
  • Severe muddy water problem has been the hot issue in Korea. Because of increased nonpoint source pollutions at Kangwon province, best soil erosion management system is required to reduce inflow of nonpoint source pollutions into the waterbodies. The USLE-based SATEEC system have been developed and enhanced for soil erosion and sediment yield estimation. However, the SATEEC cannot estimate soil depositions depending on topography in the watershed, while the USPED estimates soil erosion and deposition using sediment transport capacity of the surface runoff. In this study, the SATEEC and USPED were used to determine soil erosion hot spot subbasins. For this, 54 subbasins were delineated. In general, soil erosion hot spot subbasins were identified similarly with SATEEC and USPED. However, depending on erosion and deposition patterns in each subbasin. USPED estimated soil erosion hot spot subbasins didn't match those estimated with SATEEC. For some subbasins, much deposition was expected than erosion. This indicates that SATEEC estimated soil erosion values may be overestimated for these subbasins. Thus, care should be taken when understanding soil erosion status in the watershed based on USLE-based SATEEC results. In addition, the USPED results could be used to identify the site-specific soil erosion best management practices. If the USPED and USLE-based SATEEC are combined, it would help determining soil erosion hot spot subwatersheds in economic and environmental perspectives.

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Evaluation on the environmental effects of rain garden treating roof stormwater runoff (지붕 강우유출수를 처리하는 빗물정원의 환경적 효과 평가)

  • Flores, Precious Eureka D.;Maniquiz-Redillas, Marla C.;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.18 no.1
    • /
    • pp.10-15
    • /
    • 2016
  • In this research, the environmental effects of rain garden when applied to a stormwater runoff originated from a rooftop were evaluated. The rain garden that was utilized as LID represents less than 1% of the catchment area that it drains. Storm event monitoring was conducted from March 2012 to August 2014 on a total of 19 storm events. In the 19 storm events that was monitored only 32% produced an outflow which has a mean rainfall characteristic of approximately 25 mm. With the application of rain garden, hydrologic improvement was observed as the facility exhibit a delay and reduction in the production of runoff and peak flows as the rainfall progresses. Furthermore, in terms of pollutant reduction, it was observe that the rain garden showed a generally satisfactory performance in reducing pollutants. In addition to this, the rain garden also has additional attributes that adds to the aesthetic appeal of the surrounding environment as well as in the lives of the people. The findings of this research will help in the further improvement and reinforcement of LID designs.

Study on Representation of Pollutants Delivery Process using Watershed Model (수질오염총량관리를 위한 유역모형의 유달 과정 재현방안 연구)

  • Hwang, Ha Sun;Rhee, Han Pil;Lee, Sung Jun;Ahn, Ki Hong;Park, Ji Hyung;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.6
    • /
    • pp.589-599
    • /
    • 2016
  • Implemented since 2004, TPLC (Total Pollution Load Control) is the most powerful water-quality protection program. Recently, uncertainty of prediction using steady state model increased due to changing water environments, and necessity of a dynamic state model, especially the watershed model, gained importance. For application of watershed model on TPLC, it needs to be feasible to adjust the relationship (mass-balance) between discharged loads estimated by technical guidance, and arrived loads based on observed data at the watershed outlet. However, at HSPF, simulation is performed as a semi-distributed model (lumped model) in a sub-basin. Therefore, if the estimated discharged loads from individual pollution source is directly entered as the point source data into the RCHRES module (without delivery ratio), the pollutant load is not reduced properly until it reaches the outlet of the sub-basin. The hypothetic RCHRES generated using the HSPF BMP Reach Toolkit was applied to solve this problem (although this is not the original application of Reach Toolkit). It was observed that the impact of discharged load according to spatial distribution of pollution sources in a sub-basin, could be expressed by multi-segmentation of the hypothetical RCHRES. Thus, the discharged pollutant load could be adjusted easily by modification of the infiltration rate or characteristics of flow control devices.

Research on the Evaluation of Impaired Waterbody using the Flowrate Group at TMDL Unit Watershed in Nakdong River Basin (수질오염총량관리 단위유역 유량그룹별 수체 손상 분석)

  • Hwang, Ha-Sun;Kim, Sang-Soo;Kim, Jin-Lee;Park, Bae-Kyung
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.933-942
    • /
    • 2012
  • The purpose of this study is to evaluate the degree of waterbody impairment according to the flow conditions and present to the appropriate water quality improvement alternatives using observed water quality and flow for Total Maximum Daily Load (TMDL) implementation at 39 unit watersheds the nakdong river basin. Observed water quality data for 7 years are divided into five cumulative flow frequency group and comparing the each observed water quality data and TMDL Target water quality (TWQ) the last evaluate the water quality is impaired group. We found that the cumulative flow frequency group-specific the average excess rate of V group was the highest (32.86%), followed by the IV group (26.04%), group III (23.36%), II group (22.67%), I group (20.70%), the degree of impaired waterbody tended to be inversely proportional to the flow rate. Resulted from cumulative flow frequency group of impaired water quality assessment, 13 unit watersheds are impaired from a group IV and group V affected by point sources. Therefore, improvement of sewage discharge and the initial composition of the riparian buffer zone are needed. Nakbon F, Namkang D and Namkang E within 13 unit watersheds are impaired from group II and III affected by non-point sources. Therefore, application of Best Management Practices (BMPs) is needed for these watersheds. Evaluation of impaired waterbody using Cumulative flow frequency group is able to determine the extent of the judgment to TWQ exceeded by the flow conditions and helps proper setting Standard flow and planning pollutant reduction for TMDL.

Application of a Watershed-Based Land Prioritization Model for the Protection of Drinking Water Reservoir (상수원 보호를 위한 유역기반 토지관리 우선순위 모델 적용)

  • Lee, Jee Hyun;Choi, Ji Yang;Park, Seok Soon
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.397-408
    • /
    • 2004
  • Due to the growing impact of non-point source pollution and limitation of water treatment technology, a new policy of water quality management, called a source protection, is now becoming more important in drinking water supply. The source protection means that the public agency purchases the pollution sensitive area, such as riparian zone, and prohibit locations of point and non-point sources. Many studies have reported that this new policy is more economical in drinking water supply than the conventional one. However, it is very difficult to determine location and size of the pollution sensitive zone in the watershed. In this paper, we presented the scientific criteria for the priority of the pollution sensitive zone, along with a case study of the upstream watershed of the Paldang Reservoir, Han River. This study includes applications of the analytical hierarchy process(AHP) and a watershed-based land prioritization(WLP) model. After major criteria affecting water quality were selected, the AHP and geographic analysis were performed. The WLP model allowed us to include both quantity and quality criteria, using AHP as the multi-criteria method in making decision and reflecting local characteristics and various needs. By adding a travel-time function, which represents the prototype effectively, the results secured adaptability and scientific objectivity as well. As such, the WLP model appeared to provide reasonable criteria in determining the prioritization of land acquisition. If the tested data are used with a validated travel-time and AHP method is applied after further discussion among experts in such field, highly reliable results can be obtained.

Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed (수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황)

  • Park, Jae Hong;Park, Jun Dae;Rhew, Doug Hee;Jung, Dong Il
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.