Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants (화력발전설비 위험도 평가를 통한 기기별 정비주기 예측)

  • Song, Gee Wook;Kim, Bum Shin;Choi, Woo Song;Park, Myung Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.10
    • /
    • pp.1291-1296
    • /
    • 2013
  • Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (POF) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RBI is to identify important failure modes and causes in the equipment. Once these are defined, the POF and COF can be assessed for each failure. During POF and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the POF is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

Development of Stand-Alone Risk Assessment Software for Optimized Maintenance Planning of Power Plant Facilities (발전설비 최적 정비를 위한 독립형 위험도 평가 소프트웨어 개발)

  • Choi, Woo Sung;Song, Gee Wook;Kim, Bum Shin;Chang, Sung Ho;Lee, Sang Min
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.39 no.11
    • /
    • pp.1169-1174
    • /
    • 2015
  • Risk-Risk-based inspection (RBI) has been developed in order to identify risky equipments that can cause major accidents or damages in large-scale plants. This assessment evaluates the equipment's risk, categorizes their priorities based on risk level, and then determines the urgency of their maintenance or allocates maintenance resources. An earlier version of the risk-based assessment software is already installed within the equipment management system; however, the assessment is based on examination by an inspector, and the results can be influenced by his subjective judgment, rather than assessment being based on failure probability. Moreover, the system is housed within a server, which limits the inspector's work space and time, and such a system can be used only on site. In this paper, the development of independent risk-based assessment software is introduced; this software calculates the failure probability by an analytical method, and analyzes the field inspection results, as well as inspection effectiveness. It can also operate on site, since it can be installed on an independent platform, and has the ability to generate an I/O function for the field inspection results regarding the period for an optimum maintenance cycle. This program will provide useful information not only to the field users who are participating in maintenance, but also to the engineers who need to decide whether to extend the lifecycle of the power machinery or replace only specific components.