• Title/Summary/Keyword: 위험관리 프로세스

Search Result 194, Processing Time 0.026 seconds

A Study on Strengthening Consequence Management System Against CBRN Threats (CBRN 위협에 대비한 사후관리체계 강화방안)

  • Kwon, Hyuckshin;Kwak, Minsu;Kim, Kwanheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.429-435
    • /
    • 2020
  • North Korea declared itself complete with nuclear force after its sixth nuclear test in 2017. Despite efforts at home and abroad to denuclearize the Korean Peninsula, the prospects for the denuclearization are not bright. Along with political and diplomatic efforts to deter NK's WMD threats, the government is required to strengthen its consequence management capabilities against 'catastrophic situations' expected in case of emergency. Accordingly, this study was conducted to present measures to strengthen follow-up management against CBRN threats. The research model was partially supplemented and utilized by the THIRA process adopted and utilized by the U.S. Department of Homeland Security among national-level disaster management plan development models. Korea's consequence management (CM) system encompasses risk and crisis management on disaster condition. The system has been carried out in the form of a civil, government and military integrated defense operations for the purpose of curbing the spread or use of CBRNs, responding to threats, and minimizing expected damages. The preventive stage call for the incorporation of CBRN concept and CM procedures into the national management system, supplementing the integrated alarm systems, preparation of evacuation facilities, and establishment of the integrated training systems. In the preparation phase, readjustment of relevant laws and manuals, maintenance of government organizations, developing performance procedures, establishing the on-site support systems, and regular training are essential. In the response phase, normal operations of the medical support system for first aid and relief, installation and operation of facilities for decontamination, and development of regional damage assessment and control guidelines are important. In the recovery phase, development of stabilization evaluation criteria and procedures, securing and operation of resources needed for damage recovery, and strengthening of regional damage recovery capabilities linked to local defense forces, reserve forces and civil defense committees are required.

The Effect of Composition and Security Activities for Information Security Architecture on Information Asset Protection and Organizational Performance (정보보호 아키텍처 구성과 보안활동이 정보자산보호 및 조직성과에 미치는 영향)

  • Jeong, Gu-Heon;Yi, Dong-Wook;Jeong, Seung-Ryul
    • The KIPS Transactions:PartD
    • /
    • v.17D no.3
    • /
    • pp.223-232
    • /
    • 2010
  • This study was carried out for the purpose of inquiring into the effect of composition and security activities for information security architecture on information asset protection and organizational performance in terms of general information security. This study made a survey on 300 workers in the government, public institutions and private companies, which it showed that management factors of risk identification and risk analysis, in general, have an usefulness to composition and security activities for information security architecture to prevent inside information leakage. And the understanding and training factors of IT architecture and its component were rejected, requiring the limited composition and security activities for information security architecture. In other words, from the reality, which most institutions and organizations are introducing and operating the information security architecture, and restrictively carrying out the training in this, the training for a new understanding of architecture and its component as an independent variable made so much importance, or it did not greatly contribute to the control or management activities for information security as the generalized process, but strict security activities through the generalization of risk identification and risk analysis management had a so much big effect on the significant organizational performance.

A Process of the Risk Management for a Space Launch Vehicle R&D Project (우주발사체 개발사업의 위험관리 프로세스)

  • Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.2
    • /
    • pp.19-27
    • /
    • 2016
  • Many countries concentrated on the space developments to enhance the national security and the people's quality of life. A space launch vehicle for accessing the space is a typical large complex system that is composed of the high-technology like high-performance, high-reliability, superhigh-pressure, etc. The project developing large complex system like space launcher is mostly conducted in the uncertain environment. To achieve a goal of the project, its success probability should be enhanced consistently by reducing its uncertainty during the life cycle: it's possible to reduce the project's uncertainty by performing the risk management (RM) that is a method for identifying and tracing potential risk factors in order to eliminate the risks of the project. In this paper, we introduce the risk management (RM) process applied for a Space Launch Vehicle R&D Project.

Development of Risk Management Process for KSLV-I Program (KSLV-I 사업을 위한 위험관리 프로세스 개발)

  • Yoo, Il-Sang;Cho, Kwang-Rae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.94-100
    • /
    • 2006
  • The risk management is an organized method for identifying and measuring risk and for selecting, developing, and implementing options for the handling of risk. The risk management covers all programatic and technical factors which affect the system development performance, cost, and schedule. While technical issues are primary concern for systems engineering, the three elements(performance, cost, and schedule) must be balanced for a successful risk management process. This paper proposes the risk management process for the KSLV-I(Korea Space Launch Vehicle-I) program using computer-aided systems engineering tool, Cradle. The risk management process of KSLV-I program is similar to the general risk management process, but it has its own specific features to manage large-scale complex characteristics of KSLV-I program.

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

Comprehensive Crisis Management System of Operational Continuity Management (운영연속성관리(OCM)관점에서 위기관리통합시스템 구축)

  • Kang, Heau-Jo
    • Journal of Advanced Navigation Technology
    • /
    • v.14 no.1
    • /
    • pp.127-133
    • /
    • 2010
  • The process for establishment of Operational Continuity Management Plan is organized repeatedly of Business Risk Assessment, Crisis Analysis, Business Impact Analysis, Establishing Business Recovery Strategies, Detailed Planning, Plan Execution, Test and Maintenance(Including Monitoring). Therefore, in this paper in response to global environmental change and the construction and operation of social security systems to maximize operational continuity management, crisis management and crisis management systems, building integrated systems for building technology in general and operational continuity management within an organization to understand developed to provide a framework for implementing operational continuity management in terms of crisis management has proposed to build an integrated system.

A Study for Enterprise Type Realtime Information Security Management System (기업의 상시 보안관리 체계 연구)

  • Noh, Shi-Yeong;Lim, Jong-in
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.27 no.3
    • /
    • pp.617-636
    • /
    • 2017
  • Many businesses have adopted the standard security management structure such as ISO27001 and K-ISMS for strengthening business's security management structure to protect their core information assets and have acquired partial output from such effort. However, many risk factors such as recent advances in Information Technology and evolution of intrusion methods have increased exponentially requiring the businesses to response even more quickly with better accuracy. For such purpose, a study of 'Real Time Security Management Structure for Business' based on security management process optimization, defining a set of security index for managing core security area and calculation of risk indices for precognition of intrusion risk area has been made. Also, a survey on opinions of an expert panel has been conducted. The effectiveness of studied structure was analyzed using AHP method as well. Using this study, security personnels of a company can improve efficiency of the preemptive responsive and quicker measure from the current security management structure.

A Study on Conversion Security Control System for Industrial Security (산업보안을 위한 융합보안관제시스템에 관한 연구)

  • Ha, Ok-Hyun
    • Convergence Security Journal
    • /
    • v.9 no.4
    • /
    • pp.1-6
    • /
    • 2009
  • Current paradigm of industrial security is changing into the effective operation and management from simple establishment of security equipments. If the physical security system(entry control system, video security system, etc.) and the IT integrated security control system are conversed, it makes us possible to prevent, disrupt and track afterwards the insider's information leakage through the risk and security management of enterprise. That is, Without the additional expansion of the existing physical security and IT security manpower, the establishment of systematic conversion security management process in a short time is possible and can be expected the effective operation of professional organization system at all times. Now it is needed to build up integrated security management system as an individual technique including the security event collection and integrated management, the post connected tracking management in the case of security accident, the pattern definition and real time observation of information leakage and security violation, the rapid judgement and response/measure to the attempt of information leakage and security violation, the establishment of security policy by stages and systematically and conversion security.

  • PDF

Study on Developing the Information System for ESG Disclosure Management (ESG 정보공시 관리를 위한 정보시스템 개발에 관한 연구)

  • Kim, Seung-wook
    • Journal of Venture Innovation
    • /
    • v.7 no.1
    • /
    • pp.77-90
    • /
    • 2024
  • While discussions on ESG are actively taking place in Europe and other countries, the number of countries pushing for mandatory ESG information disclosure related to non-financial information of listed companies is rapidly increasing. However, as companies respond to mandatory global ESG information disclosure, problems are emerging such as the stringent requirements of global ESG disclosure standards, the complexity of data management, and a lack of understanding and preparation of the ESG system itself. In addition, it requires a reasonable analysis of how business management opportunities and risk factors due to climate change affect the company's financial impact, so it is expected to be quite difficult to analyze the results that meet the disclosure standards. In order to perform tasks such as ESG management activities and information disclosure, data of various types and sources is required and management through an information system is necessary to measure this transparently, collect it without error, and manage it without omission. Therefore, in this study, we designed an ESG data integrated management model to integrate and manage various related indicators and data in order to transparently and efficiently convey the company's ESG activities to various stakeholders through ESG information disclosure. A framework for implementing an information system to handle management was developed. These research results can help companies facing difficulties in ESG disclosure at a practical level to efficiently manage ESG information disclosure. In addition, the presentation of an integrated data management model through analysis of the ESG disclosure work process and the development of an information system to support ESG information disclosure were significant in the academic aspects needed to study ESG in the future.

A Study on Management Applications Using 6 Sigma Techniques to Supply Equipment Maintenance of City Gas (6시그마 기법을 이용한 도시가스 공급시설 관리 응용 연구)

  • Kim, Woon-Tae
    • Journal of the Korean Institute of Gas
    • /
    • v.11 no.3
    • /
    • pp.56-63
    • /
    • 2007
  • These days, needs and wants of the customers are getting diversified and the market is also changing rapidely. Many organizations are now attempting change and innovation activities to improve products and service quality. This study was performed to apply 6 sigma tools for the efficient repair management of city gas supply equipment. Vital few factors, RISK factors, sigma values, root causes. and solutions were derived by 6 sigma tools. We are performing statistical process control for the new process. Six sigma for city gas supply equipment safety management enabled to improve the business management for efficiency by reducing variation and eliminating cost for quality.

  • PDF