• Title/Summary/Keyword: 원전해체

Search Result 148, Processing Time 0.023 seconds

Status of Nuclear Power Plant Decommissioning Cost Analysis in USA (미국의 원전해체 비용평가 기초자료 및 동향 분석)

  • Shin, Sanghwa;Kim, Soonyoung
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.2
    • /
    • pp.139-148
    • /
    • 2018
  • Assessment of NPP(Nuclear Power Plant) decommissioning cost is very important for safe decommissioning of nuclear power plants. In the United States, which has the most NPP decommissioning experience, the cost evaluation study has been conducted since the 1970s in order to decommissioning nuclear facilities. The US NRC has conducted studies on decommissioning technology, safety and cost for a variety of reactor type and nuclear installations. In the total decommissioning costs, the end of operation licenses accounted for the largest portion, followed by spent fuel management and site restoration. In case of immediate decommissioning, spent fuel management cost increased compared to delayed decommissioning, and delayed deocmmissioning increased the cost of terminating the operation license. However, in general, delayed decommissioning does not show any significant benefit as compared with immediate decommissioning. It is necessary to consider the evaluation according to the site conditions when evaluating the cost of decommissioning domestic nuclear power plants. Also, in Korea, IAEA recommendations were applied to reorganize the radioactive waste classification system. Therefore, it is necessary to develop a method to appropriately use the decommissioning data of the preceding US Nuclear Power Plant in the new classification system when estimating the amount of radioactive waste generated during decommissioning. In particular, the establishment of the evaluation methodology for the waste to be disposed of will be an important factor in securing the accuracy of the decommissioning cost. In addition, it is necessary to construct information data that can be applied to facility characteristics and work characteristics in order to evaluate the cost of demolition of domestic nuclear power plants.

A preparation plan proposal of nuclear power plant decommissioning radioactive waste characterization report (원자력발전소 해체 방사성폐기물 특성보고서 작성 방안 제안)

  • Kim, Chang Lak;Lee, Sun Kee;Kim, Heon;Park, Hae Soo;Sung, Suk Hyun;Kong, Chang Sig
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.1
    • /
    • pp.76-84
    • /
    • 2021
  • Radioactive waste generated from nuclear power plant decommissioning shall be strictly managed so that radioactive materials above the allowable limit are not leaked into the environment. Radioactive wastes shall be classified and treated for management based on characteristics such as the type of waste, physicochemical properties, nuclide concentration and radioactivity. Waste characterization report shall be prepared and submitted to the disposal facility operator to ensure that the treated waste is suitable for disposal. The disposal facility operator shall review the waste Characterization report and visit the nuclear power plant decommissioning site to ensure that the wastes are processed step by step according to the plan. The waste Characterization report may be used as input data to evaluate disposal facility safety. Domestic and foreign data are collected and reviewed to confirm the entire processes from waste generation to delivery. This paper proposes the method to prepare the waste Characterization report which contains data and information on waste characteristics, treatment facilities & method and packaging method & container.

Assessment of the Radiological Inventory for the Reactor at Kori NPP Using In-Situ Measurement Technology (In-Situ 측정법을 이용한 고리 원자로 방사선원항 평가)

  • Jeong, Hyun Chul;Jeong, Sung Yeop
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.12 no.2
    • /
    • pp.171-178
    • /
    • 2014
  • After the expiration of operating license of a plant, all infrastructures within the plant must be safely dismantled to the point that it no longer requires measures for radiation protection. Despite the fact that Kori 1 and Wolsong 1 are close to the expiration of their operating license, sufficient technologies for radiological characterization, decontamination and dismantling is still under development. The purpose of this study is to develop one of methods for radiological inventory assessment on measuring object by using direct measure of large component with In-Situ measurement technique. Radiological inventory was assessed by analyzing nuclide using portable gamma spectroscopy without dismantling reactor head, and the result of direct measurement was supplemented by performing indirect measurement. Radiochemical analysis were performed on surface contamination samples as well. During the study, radiological inventory of reactor vessel calculated expanding the result. Based on the result and the radioactivity variation of each radionuclides time frame for decommissioning can be decided. Thus, it is expected that during the decommissioning of plants, the result of this study will contribute to the reduction of radiation exposure to workers.

Preparation of Radiological Environmental Impact Assessment for the Decommissioning of Nuclear Power Plant in Korea (국내 원전 해체시 방사선환경영향평가 방안)

  • Lee, Sang-Ho;Seo, Hyung-Woo;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.1
    • /
    • pp.107-122
    • /
    • 2018
  • Kori unit 1, the oldest commercial nuclear power plant in South Korea, was permanently shut down in June 2017. There are a lot of things to consider in decommissioning nuclear power plants, and one of them is the radiological environmental impact assessment. Performed to promote the health and safety of residents around the nuclear power plant, radiological environmental impact assessment aims to confirm that off-site radiological dose from radioactive material released from the facility does not exceed the regulatory criteria. There are three main parts of environmental impact assessment: pre-decommissioning environmental monitoring, environmental monitoring during decommissioning, and impact on nearby residents. At present, although the Korea Nuclear Safety Act stipulates that radiological environmental impact assessment resulting from decommissioning should be carried out, the details have not been specified. Therefore, this paper compares and analyzes guidelines for evaluation of radiological environmental impacts of nuclear power plants overseas, and presents a draft on the assessment of radiological dose resulting from decommissioning according to the Korean situation.

Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning (BIM을 활용한 원전 해체 물량산출 방안)

  • Jung, In-Su;Won, Ji-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6297-6304
    • /
    • 2015
  • Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.

Fire Protection Regulations for Ensuring Fire Safety during Decommissioning Nuclear Power Plants in Korea (해체원전 화재안전 확보를 위한 화재방호 규정 고찰)

  • Kim, Jung-Wun;Park, Chan-Geun
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.134-140
    • /
    • 2020
  • Nuclear power plants (NPPs) in Korea are required to be maintained using a defense in-depth approach to prevent leakage of radioactive substances outside the plant and allow safe shutdown in the event of a fire. Periodic testing must be conducted to ensure that the fire protection facilities perform as required by the laws for various nuclear reactor types. In June 2017, for the first time in Korea, a nuclear plant, Kori Unit 1, was permanently shut down. It was prepared for decommissioning in accordance with the fire protection regulations imposed by the regulatory body. However, a standard protocol is necessary for systematically establishing the fire protection program for decommissioning of NPPs in the future. Therefore, the nuclear legal systems of countries with many operating nuclear power plants, such as the United States, Japan, Canada, and various European countries, were reviewed and guidelines for establishing a fire protection program for decommissioning NPPs was suggested; the fire protection requirements stated by Reg Guide 1.191 (Decommissioning fire protection program for NPPs during decommissioning and permanent shutdown) were used as a model. Suggestions for establishing legal regulations to optimize fire protection programs and secure basic technology for decommissioning NPPs were also made.

Chemical Decontamination Design for NPP Decommissioning and Considerations on its Methodology (원전해체를 위한 화학제염 설계 및 그 방법론에 대한 고려사항)

  • Park, Geun Young;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.13 no.3
    • /
    • pp.187-199
    • /
    • 2015
  • Decontamination is one of the crucial technologies that are applied during the decommissioning process of nuclear facilities to secure the safety of workers and to minimize the quantity of radioactive waste. Decontamination removes radionuclides on the surface of contaminated metal. Compared with decontamination for operational nuclear facilities, decontamination for nuclear power plants that are being decommissioned needs to remove the more and thicker surface using more aggressive agents or specially developed equipment. This paper analyzed the factors to be considered before planning the decontamination, representative decontamination technologies, and their application procedure,etc. ORCID