• Title/Summary/Keyword: 운영 중 터널

Search Result 121, Processing Time 0.024 seconds

Evaluation of Hydrogeological Characteristics of Deep-Depth Rock Aquifer in Volcanic Rock Area (화산암 지역 고심도 암반대수층 수리지질특성 평가)

  • Hangbok Lee;Chan Park;Junhyung Choi;Dae-Sung Cheon;Eui-Seob Park
    • Tunnel and Underground Space
    • /
    • v.34 no.3
    • /
    • pp.231-247
    • /
    • 2024
  • In the field of high-level radioactive waste disposal targeting deep rock environments, hydraulic characteristic information serves as the most important key factor in selecting relevant disposal sites, detailed design of disposal facilities, derivation of optimal construction plans, and safety evaluation during operation. Since various rock types are mixed and distributed in a small area in Korea, it is important to conduct preliminary work to analyze the hydrogeological characteristics of rock aquifers for various rock types and compile the resulting data into a database. In this paper, we obtained hydraulic conductivity data, which is the most representative field hydraulic characteristic of a high-depth volcanic bedrock aquifer, and also analyzed and evaluated the field data. To acquire field data, we used a high-performance hydraulic testing system developed in-house and applied standardized test methods and investigation procedures. In the process of hydraulic characteristic data analysis, hydraulic conductivity values were obtained for each depth, and the pattern of groundwater flow through permeable rock joints located in the test section was also evaluated. It is expected that the series of data acquisition methods, procedures, and analysis results proposed in this report can be used to build a database of hydraulic characteristics data for high-depth rock aquifers in Korea. In addition, it is expected that it will play a role in improving technical know-how to be applied to research on hydraulic characteristic according to various bedrock types in the future.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Enhanced Oil Recovery (EOR) Technology Coupled with Underground Carbon Dioxide Sequestration (CO2 지하저장과 연계한 원유회수증진 기술)

  • Kim, Hyung-Mok;Bae, Wi-Sup
    • Tunnel and Underground Space
    • /
    • v.23 no.1
    • /
    • pp.1-12
    • /
    • 2013
  • Enhanced oil recovery (EOR) technology coupled with underground carbon dioxide sequestration is introduced. $CO_2$ can be injected into an oil reservoir in order to enhance oil production rate and $CO_2$ EOR can be turned into CCS in a long term sense. Coupling $CO_2$ EOR with CCS may secure a large scale and consistent $CO_2$ source for EOR, and the $CO_2$ EOR can bring an additional economic benefit for CCS, since the benefit from enhanced oil production by $CO_2$ EOR will compensate costs for CCS implementation. In this paper, we introduced the characteristics of $CO_2$ EOR technology and its market prospect, and reviewed the Weyburn $CO_2$ EOR project which is the first large-scale $CO_2$ EOR case utilizing an anthropogenic $CO_2$ source. We also introduced geotechnical elements for a successful and economical implementation of $CO_2$ EOR with CCS and they were a miscroseismic monitoring during and after injection of $CO_2$, and determination of minimum miscible pressure (MMP) and maximum injection pressure (MIP) of $CO_2$.

Analysis of Civil Defense Shelters and Measures (민방위 대피소의 실태분석 및 대책방안)

  • Kim, Tae-Hwan
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.31-31
    • /
    • 2011
  • 1990년 이후 공산체계인 구소련과 동구권이 몰락하고 세계적으로 탈냉전의 변화와 우리의 민주정부 수립 후 햇빛정책 등에도 불구하고 북한은 적화통일을 포기하지 않고 작년 11월에 연평도에 포격을 가하여 민간인과, 군이 2명이 사망하는 사건이 발생 하였다. 또한 북한의 공격은 과거의 포탄공격뿐만 아니라 미사일이나 화생방과 같은 생화학물질 탑재 가능한 공격이 예상된다. 이에 대비 정부에서는 고정시설의 화생방 방호는 일단유사시에 국민의 생명과 재산을 보호하는데 필수요소로서 집단보호개념에 도입하고 있으며, 현재 각 중요 대피시설 및 지자체의 기존 대피시설을 개인방호, 탐지, 제독, 운용절차를 포함한 실태파악 및 재래식 탄을 포함한 통합적인 조치를 마련하고 있다. 작년 2010년 11월 연평도에서의 북한 포격이후 우리는 서해5도나 접경지역 주민과 그리고 근접거리의 서울시민들이 안전하게 포격으로부터 피난 할 수 있는 민방위대피소에 대한 문제점이 대두되고 대책방안을 요구하고 있다. 소방방재청 기준에 따르면 직격(直擊) 핵폭탄을 제외한 화생방, 재래식 무기 공격에 견딜 수 있는 시설은 '1등급 대피시설'인데 서울에는 한 곳도 없다. 고층건물의 지하 2층 이하나 지하철, 터널 같은 2등급 대피시설도 폭격은 견딜 수 있지만 화생방 공격에는 취약하다. 지하상가 등 건축물의 지하층, 지하차도나 보도는 그보다 더 취약한 3등급이며 단독 주택의 지하층처럼 방호 효과가 떨어지는 곳이 4등급이다. 2등급으로 분류된 대피소의 경우 분류만 되어 있을 뿐 장기간 대피시 시민들이 사용 할 수 있는 거주공간이 아닌 임시 대피로서의 역할만 하고 있다. 본 연구에서는 민방위 기본법에 따라 지하에 $3.3m^2$ 당 4명 이상이 대피할 수 있는 규모의 공간을 갖추기만 하면 대피시설로 볼 수 있는 현 문제점과 1등급에서 4등급으로 나뉘어져있는 민방위 대피소와 대피소가 있지만 피난공간으로서의 역할과 구조적으로 안전한가에 대한 국내외 실태 분석을 통하여 분석한 결과 우리는 서해5도 대피시설의 반 이상이 무용지물이고 접경지 또한 피난시에 피난장으로서의 대피소가 난방이나, 구급품과 식구 시설 등이 구비가 되어 있지 않고 대피시설로 지정한곳이 간판이나 안내시설이 없다. 외국의 경우 스위스는 연방정부의 관리책임으로 전쟁이나 핵 확산에 따른 화생방 업무 전담팀을 두고 있으며, 방독면은 개인 방호물자로서 전국민 100% 보유하고, 각가정이나 건축, 시설물의 경우 화생방 표준 대피시설 설치관련 규정 마련 시행하고 있다. 대피시설은 화생방 방호가 가능한 지휘부용 대피시설과 일반 주민대피용 시설을 구분하여 설치운영하고 있으며, 전국에 650만개를 설치하고 있다. 결론은 대피시설이 북한 공경시 피난시설로의 활용방안을 모색 등급구분에 따른 현실적용 수정과 기존 대피소 보강과 재선별이 필요하고, 신축시 설계 표준설계안 그리고 기존의 대피소에 대한 보수, 보강방법 가이드라인과 장기간 거주에 대한 설비구축 등과 국민 대홍보등을 제안하였다.

  • PDF

A Fundamental Study on Backfilling and Monitoring System for Stability of Underground Mine Openings (채굴공동의 안정성 유지를 위한 채움재의 충전과 계측시스템 구축에 관한 기초연구요)

  • Kim, Byung-Ryeol;Lee, Seung-Joong;Choi, Sung-Oong
    • Tunnel and Underground Space
    • /
    • v.29 no.6
    • /
    • pp.407-424
    • /
    • 2019
  • To prevent possible accidents by surface subsidence, backfilling operation is known to be one of the most effective methods for ensuring the long-term ground stability because it can eliminate fundamentally the origin of underground mine opening collapse. Also, for effective backfilling of underground mine opening, it is necessary to keep monitoring of backfilled mine opening for analyzing several factors such as filling effect with change of backfill material and characteristics of backfill material. Therefore, in this study, a monitoring system which consists of measuring device and software program has developed to examine the performance of backfilling operation and verify to field applicability to underground mine. Sensors for measuring device have been selected through study of recent research papers and mock-up test has been performed to verify the system compliance. Also, monitoring result of the mock-up test compared to case studies in some countries. From monitoring result fo the mock-up test compared to case studies in some countries, consequently, it was concluded that the developed real-time monitoring system had ensured filed applicability in the underground mine.

Development of Air Cleaning Roll-Filter for Improving IAQ in Subway (도시철도 객실 공기질 개선을 위한 롤필터 개발연구)

  • Kwon, Soon-Bark;Park, Duck-Shin;Cho, Young-Min;Kim, Jong-Bum;NanGoong, Seok;Han, Tae-Woo;Cho, Kwan-Hyun;Kim, Tae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.4
    • /
    • pp.313-319
    • /
    • 2011
  • In a modern society, various type of transportation modes are utilized, among them the subway system is the one of the main transportation mode which more than 7.21 million people ride a day in Seoul. Due to the increased interests on the indoor air quality (IAQ) of underground facilities, public concerns on IAQ of subway system are increasing also. Platform screen door (PSD) recently installed at the whole stations of Seoul subway and tunnel washing-out appeared to be effective in reducing particulate matters in the platform and tunnel. However there has not been any attempt to improve IAQ of subway cabin inside. Most technologies for removing airborne particulate matters are known to be difficult to adopt on the subway cabin due to the problem of maintenance cost. Therefore, the object of this study is a practical development of cabin air cleaning system which can reduce the concentration of airborne particles and harmful gases at the same time. In this paper, we focused on the development of particle removing system utilizing a roll-filter for increasing operating time of air filter. The prototype of system was designed and manufactured based on the numerical prediction results. For rollfilter device, 5 candidate filter materials were tested in point of particle collection efficiency and pressure drop. It was found that the electrically charged filter material showed the highest performance among them.

A Study on Evaluating the Level of Service for Bridges using Fuzzy Approximate Reasoning (퍼지근사추론을 이용한 교량 서비스 수준 산정에 관한 연구)

  • Jo, Byung-Wan;Kim, Heon;Kim, Jang-Wook;Chi, Se-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.8
    • /
    • pp.8-17
    • /
    • 2017
  • Infrastructures such as bridges and tunnels are crucial elements of national economic growth, and sudden collapses may lead to great catastrophes with significant social and economic losses, as well as a loss of lives. Hence, an efficient maintenance technique must be applied to guarantee safety, secure budgets to maintain a certain level of service, and prevent maintenance expenditures from being concentrated in a specific time period. Developed countries have experienced rapid increases in maintenance budgets, and maintenance costs now account for about 40% of the total maintenance budget. The level of service in asset management systems is an essential element for setting management goals and making priority decisions. Therefore, this study uses fuzzy theory to develop a new way to assess the level of service.The assessment model was applied to an actual bridge to evaluate the level of service for users.

Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea (MW급 EGS 지열발전 상용화 기술개발사업의 추진 배경 및 계획)

  • Yoon, Woon-Sang;Song, Yoon-Ho;Lee, Tae-Jong;Kim, Kwang-Yeom;Min, Ki-Bok;Cho, Yong-Hee;Jeon, Jong-Ug
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2011
  • Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.

A Study on the Introduction and Application of Core Technologies of Smart Motor-Graders for Automated Road Construction (도로 시공 자동화를 위한 스마트 모터 그레이더의 구성 기술 소개 및 적용에 관한 연구)

  • Park, Hyune-Jun;Lee, Sang-Min;Song, Chang-Heon;Cho, Jung-Woo;Oh, Joo-Young
    • Tunnel and Underground Space
    • /
    • v.32 no.5
    • /
    • pp.298-311
    • /
    • 2022
  • Some problems, such as aging workers, a decreased population due to a low birth rate, and shortage of skilled workers, are rising in construction sites. Therefore research for smart construction technology that can be improved for productivity, safety, and quality has been recently developed with government support by replacing traditional construction technology with advanced digital technology. In particular, the motor grader that mainly performs road surface flattening is a construction machine that requires the application of automation technology for repetitive construction. It is predicted that the construction period will be shortened if the construction automation technology such as trajectory tracking, automation work, and remote control technology is applied. In this study, we introduce the hardware and software architecture of the smart motor grader to apply unmanned and automation technology and then analyze the traditional earthwork method of the motor grader. We suggested the application plans for the path pattern and blade control method of the smart motor grader based on this. In addition, we verified the performance of waypoint-based path-following depending on scenarios and the blade control's performance through tests.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.