Sophisticated Air Navigation System has contributed to enhancing the capacity of airspace capacity, leading to an efficient airspace environment. However, it has acted as a factor increasing the probability of collision. When an aircraft fails to maintain vertical separation and instead exhibits lateral positional errors, it does not necessarily lead to a collision. However, as the lateral positional accuracy increases, the randomness of aircraft positions decrease, resulting in an elevated probability of collisions. Consequently, The International Civil Aviation Organization has introduced Strategic Lateral Offset Procedures(SLOP), intentionally deviating aircraft from the centerline of airways. Likewise, South Korea also operates Offset procedure. The Y579 was operated using the Offset before its conversion to a dual airway and the analysis of the Offset track revealed that it was being operated similarly to a unidirectional dual airway. This paper develops a safety assessment methodology applicable to unidirectional dual airways, and applies it to perform a safety assessment of the Y579 Offset procedure.
Kim, Tae-Hoon;Park, Nam-Kyu;Choi, Han-Na;Lee, Dae-Yoon;Ahn, Jong-Deuk;Cho, Yong-Hwan
Journal of the Korea Society of Computer and Information
/
v.14
no.12
/
pp.139-145
/
2009
This study proposes a model of collection process for real-time forensic data, in which the manager was to respond to infringement incidents in terms of system operation and inspection and to collect, analyze and restore forensic data immediately after an incident took place. The suggested model was modeled in seven processes according to functional elements. Unlike the old and managerial forensic processes, the model allowed the manager to react to infringement incidents in the aspects of system operation and inspection and to follow the processes of collecting, analyzing, and restoring forensic data in case of an incident. There also was a feedback process designed towards the step of gathering forensic data through the stages of systematizing reaction strategies in order that he or she be able to bring about comprehensive and structural responses to an incident like the former processes in which it is difficult to bring about instant responses.
응용체계 보안성 평가. 승인 제도는 정보시스템의 보안성에 대한 품질보증을 위한 핵심적인 수단이다. 응용체계는 동일한 구성요소로 이루어져 있다고 할지라도 운영환경과 이용목적에 따라 보안 요구사항을 달이함으로 적절한 수준의 보안성을 확보하고 있는지를 확인하는 것은 매우 중요하다. 본 연구에서는 응용체계의 보안성을 평가하기 위한 몇 가지 방법론을 절차의 측면에서 살펴보고, 평가. 승인 절차에 있어서 핵심적인 고려사항을 기술하였다.
공정거래법의 실효적 집행을 위해서는 무엇보다도 공적집행을 개선하는 것이 중요하다. 이를 위하여 무엇보다 합리적이고 투명한 절차운영과 이해관계인의 절차상 권리 강화, 경쟁보호라는 목적에 충실하기 위한 공정위의 독립성과 전문성 확보, 그리고 사법심사를 통한 공정위의 재량권 남용 통제의 강화 등이 이루어질 필요가 있다. 아울러 공정거래법의 실효적 집행은 절차법만의 문제가 아니라, 실체법의 문제이기도 하다는 점을 간과해서는 안 된다. 따라서 집행의 개선논의는 금지기준의 명확성, 타당성 및 목적적합성이라는 실체법적 차원에서도 아울러 접근하여야 한다. 그리고 이러한 실체법의 발전과 합리적인 법 적용이란 공정위의 준 사법 기관성에 걸맞는 경쟁법 전문가의 적극적인 활용에 크게 좌우되는 것임은 물론이다.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2023.05a
/
pp.190-191
/
2023
자율운항선박 원격제어시스템은 선박운항상태모니터링시스템, 통신시스템, 선박제어시스템으로 구성되어 있다. 육상제어센터는 상기 개별시스템을 결합한 통합시스템으로 이루어졌으며, 지난 1차, 2차 연안항해 시, 실습선과 육상제어센터간의 육상제어에 필요한 정보의 송수신여부를 확인하고자 테스트를 시행하고, 그 결과를 통해 일부 시스템의 문제점을 식별하였다. 본 연구에서는 식별된 문제점들을 해결하기 위한 방안을 제시하였으며, 차후 진행되는 연안항해 시 시스템 안정을 위한 통합절차에 대한 지침을 제시하고자 한다.
Proceedings of the Korea Information Processing Society Conference
/
2017.04a
/
pp.567-570
/
2017
산업공정에서 공정 정보처리의 극대화를 위하여 PLC, 로봇 등의 여러 프로그램식 단위제어기기가 네트워크로 연결되어 운영되고 있다. 대부분이 RS232C와 고유 장비의 전송절차에 의해 수행되어 왔지만, ISO 등에서는 반도체공정에 적용을 위한 SECS에 대한 프로토콜을 표준화하였다. 본 연구는 반도체 스퍼터 공정에 PLC, 로봇, 반송장치의 연결에 SECS-II를 적용하고, HSMS를 활용하여 TCP/IP와 Host를 연결하여 계층구조의 네트워크를 운영하였다. 전송 메세지 type을 stream과 function으로 나누어 송수신 확인과 데이터 전송절차를 설정하여 공정이 정상적으로 운영됨을 확인하였다.
2007년 하반기부터 국내탄 발전소에 대한 기반기금 지원방식이 변경 적용된다. 현행 발전소 변동비에 대한 시장정산금과의 차액보전에서 국내탄 사용량당 단가지원방식으로 변경된다. 기반기금 지원방식변경과 동시에 현행 전력시장운영규칙 부칙에 의거 국내탄발전소 용량가격이 일반발전기 수준으로 조정된다. 이러한 제도 변경시 국내탄발전소의 수입은 감소 전망으로 현행 적용하고 있는 BLMP수준의 국내탄 상한가격에서 제도변화를 반영한 적정 상한가격 수준설정은 전력시장운영에 있어 매우 중요하다. 기반기금 지원식 변경과 적정 상한가격 운영은 발전회사에게 많은 비용절감 유인을 제공하여 수입창출노력을 할 것으로 보이며, 발전기 이용률 제고 효과를 발휘할 것으로 전망된다. 본 논문에서는 합리적인 상한가격 산정에 필요한 상한가격 산정절차를 수립하고 국내탄발전소 제도개선 종합효과를 분석하고자 한다.
This paper presents methodologies and strategies for developing standard operating procedures (SOPs) that are essential for practical use of disaster communication systems. Therefore, the various factors related to the SOP of the public safety network(SafeNet) are identified and analyzed, and the processes and strategies for the effective development of the SOP are developed and presented based on the analysis. In addition, the proposed SOP is reflected in LTE, which is public safety network implementation technology, and suggests how priority and QoS that are the basis of radio resource allocation should be operated.
Proceedings of the Korea Information Processing Society Conference
/
2009.04a
/
pp.466-468
/
2009
국가과학기술종합정보서비스(NTIS: National Science & Technology Information Service)는 국가R&D 사업정보를 한 곳에서 서비스하는 국가R&D 지식포털이다. NTIS의 효율적 기획 및 업무운영 총괄을 위하여 NTIS 표준운영절차(SOP: Standard Operating Procedures) 수립의 필요성이 증대되었다. 본 연구에서는 본 연구에서는 선진이론 모델 및 국내사례를 분석하고, NTIS 구축에 참여한 내부의 환경적 요건과 운용체계 요구사항을 고려하여, NTIS 운용체계에 가장 실무적으로 적합한 NTIS SOP를 수립하였다. 이와 더불어 NTIS 운영주체간 NTIS SOP 정보의 효율적 공유를 위하여 NTIS SOP 공유시스템을 구축함으로써, 업무별 권한별로 NTIS SOP를 공유하고 활용할 수 있도록 하였다.
Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.