• Title/Summary/Keyword: 운송비용

Search Result 383, Processing Time 0.025 seconds

A Study on Developing Web based Logistic Information System(KT-Logis) (웹 기반 통합물류정보시스템(KT-Logis) 개발에 관한 연구)

  • 오상호;김태준
    • Proceedings of the Korean DIstribution Association Conference
    • /
    • 2001.11b
    • /
    • pp.125-141
    • /
    • 2001
  • In this paper, the current problems of logistics industry in Korea and their possible solutions were discussed. With Korea Telecoms KT-Logis, the supplier and demander of logistics service would not have to invest large sum of money into their computer system. All they need is just a computer with internet connected. What KT-Logis influence on the logistics industry are the following; 1. Many logistics service supplier and demander can do the business on the web with one computer system. 2. This web based computer system does not only work on the office but also apply on the field worker such as delivery personnel or even the forwarder with mobile phone. 3. KT-Logis is an integrated system which cover the broad arrange of logistics management from truck management to customer relations management. 4. Finally, KT-Logis is web based systems which suits for current e-business and mobile environment. In future, more studies should be done to develop more progressive integrated logistics information systems with enterprise resource planning(ERP) and supply chain management(SCM).

  • PDF

Design of Truck Escape Ramps (자동차 긴급 피난 차선의 계획 설계)

  • 구본충
    • Journal of the Korean Professional Engineers Association
    • /
    • v.28 no.4
    • /
    • pp.54-75
    • /
    • 1995
  • This synthesis has been prepared from a review of literature on Truck Escape Ramps technology and a survey of current practice by state department of transportation. Their locations have been determined usually from a combination of accident experience and en-gineering judgement, but new tools are emerging that can identify needs and sites without waiting for catastrophic accidents to happen. The Grade Severity Rating Systems holds promise in this regard. Design Procedures for truck excape ramps continue to evolve. Gravel arrester beds are clearly the preferred choice across the country Rounded aggregate, uniformly graded in the approximate size range of 13 to 18mm. Tech-nical publications typically have dassified TER types as paved gravity, sandpile, and ar-rester bed ramps. The design speed for vehicle entry into the ramp in critical to the deter-mination of ramp length. An escape ramp should be designed for a minimum entry speed of 130km/hr, a 145km/hr design being preferred. The ramps should be straight and their angle to the roadway align-ment should be as possible. The grade of truck escape ramps show the adjustment of ramp design to local topography, such as the tradeoff of ramp length against earthwork requirements. A width of 9 to 12m would more safety acommodate two or more outof con-trol vehicles. Reguarding comments on the most effective material, most respondents cited their own specification or referred to single graded, rounded pea gravel. The consensus essentially Is that single graded, well -rounded gravel is the most desirable material for use in arrester beds. The arrester beds should be constructed with a minimum aggregate depth of 30cm. Successful ramps have used depths between 30 and 90cm.

  • PDF

Development of Analytic Hierarchy Process or Solving Dependence Relation between Multicriteria (다기준 평가항목간 중복도를 반영한 AHP 기법 개발)

  • 송기한;홍상연;정성봉;전경수
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.7
    • /
    • pp.15-22
    • /
    • 2002
  • Transportation project appraisal should be precise in order to increase the social welfare and efficiency, and it has been evaluated by only a single criterion analysis such as benefit/cost analysis. However, this method cannot assess some qualitative items, and cannot get a proper solution for the clash of interests among various groups. Therefore, the multi-criteria analysis, which can control these problems, is needed, and then Saaty has developed one of these methods, AHP(Analytic Hierarchy Process) method. In AHP, the project is evaluated through weighted score of the criteria and the alternatives, which is surveyed by a questionnaire of specialists. It is based on some strict suppositions such as reciprocal comparison, homogeneity, expectation, independence relationship between multi-criteria, but supposing that each criterion has independence relation with others is too difficult in two reasons. First, in real situation, there cannot be perfect independence relationship between standards. Second, individuals, even though they are specialists of that area, do not feel the degree of independence relation as same as others. This paper develops a modified AHP method for solving this dependence relationship between multi-criteria. First of all. in this method, the degree of dependence relationship between multi-criteria that the specialist feels is surveyed and included to the weighted score of multi-criteria This study supposes three methods to implement this idea. The first model products the degree of dependence relationship in the first step for calculating the weighted score, and the others adjust the result of weighted score from the basic AHP method to the dependence relationship. One of the second methods distributes the cross weighted score to each standard by constant ratio, and the other splits them using Fuzzy measure such as Bel and Pl. Finally, in order to validate these methods, this paper applies them to evaluate the alternatives which can control public resentments against Korean rail path in a city area.