• Title/Summary/Keyword: 예산평가

Search Result 667, Processing Time 0.032 seconds

A pilot study on SOC information system for SOC report card writing support (국내 SOC 리포트카드 작성 지원을 위한 SOC 정보시스템 시범 구축 연구)

  • Jang, Youn-Mi;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.142-148
    • /
    • 2017
  • Along with economic growth in the 1970s, the nation's economy, railroads, and airports have soared, but the facilities have been aging for 30 years. The aging SOC lowers the national competitiveness and threatens the safety of the people. SOC is a key asset of the national life and economic activity, and is a key factor for evaluating the national competitiveness. Therefore, it is necessary to systematically manage and operate the SOC related to people's lives. In the USA, the SOC report card is issued regularly. Those reports are used as a basis for securing budgets. In Korea, facilities management institutions are different. Therefore, there is no integrated SOC monitoring system. Hence, this study developed a 'SOC information system' that can collect reports scattered throughout the country and support report cards. The demonstration system was implemented through the web and the feasibility of implementing the evaluation support system was confirmed. The collection distributed SOC data should be supported by national policy. Although it takes a long time, it is necessary to improve national competitiveness and public safety.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

A Study on Cost-Benefit analysis for Geographic Information Systems in Local Governments (지자체 GIS사업을 위한 비용효과분석 연구)

  • Kim, Eun-Hyung;Lee, Hyun-Soon
    • Journal of Korea Spatial Information System Society
    • /
    • v.2 no.2 s.4
    • /
    • pp.59-74
    • /
    • 2000
  • Because efficiency of the 1st-phase NGIS investment(1995-2000) has not been clearly measured, the action taken in the 2nd-phase NGIS project requires NGIS budgets to be evaluated in terms of effectiveness. Especially, the effective investments in local governments are critical for the NGIS projects, because they execute the much larger amount of budgets in total than other GIS projects. As indicated, for the successful NGIS implementation, it is important to obtain continuous political and financial supports from decision makers. As a persuasion measure for the budget appropriation, CBA(Cost-Benefit Analysis) and CEA(Cost-Efficiency Analysis) can play an important role for the decision makers. The major concern of this paper is how to measure the costs and benefits of the GIS implementation by considering important characteristics of the GIS projects in local governments, and existing theories are reviewed for this concern. The GISs in local governments can have different stages in terms of its evolution and the effectiveness of the applications can be represented variously. To identify categories for measuring costs and benefits of the various GISs, case studies and success stories are reviewed from both the foreign and domestic research. The categories of costs and benefits are determined from the tangible and intangible aspects. The categories for the quantitative and qualitative measure are proposed to evaluate the GISs in local governments. After measuring costs and benefits, three key evaluation methods in cost-benefit analysis are suggested as follows: 1) the benefit: cost ratio (B/C), 2) Internal Rate of Return (IRR), and 3) the net present values (NPV) of the costs and benefits. The sensitivity and uncertainty analysis are also helpful to make a decision for the GIS budget appropriation in local governments. In conclusion, although cost-benefit analysis is not an easy undertaking, it is certain that it can play an important role in the future for the GIS funding decisions in local governments.

  • PDF

Introduction to Definition and Basic Role of Performance Measure in Asset Management for Bridge Management (자산관리기법의 교량시설물의 적용에 있어 성능평가지표의 정의 및 역할에 대한 기초연구)

  • Park, Cheol-Woo;Park, Kyung-Hoon;Hwang, Yoon-Koog;Lee, Sang-Yoon;Kong, Jung-Sik;Min, Dae-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.401-404
    • /
    • 2008
  • Bridges are exposed to very severe environment and experience, as service life increased, elevated traffic load and traffic flow, in addition to natural disasters. In comparing to other road structures, bridges may cause more significant damage, such as human-involved accidents, to the society in the event of collapse. A certain level of service shall be necessarily secured to assure the minimum safety of users. The cost for manage and preserve bridges will increase gradually and more restrictions will be loaded to efficiently distribute the limited resources, such as monetary budget and human resource etc. In order to enhance performance and serviceability of bridges with the limited resource, asset management technique has been applied into the bridge management system, which capitalizes the road infrastructures including bridges and assess them in accordance with the government finance report. In the application of asset management, there must be a tool for assess the performance of bridges and this study introduces the basic information on the definition and role of performance measures for asset management for bridges.

  • PDF

The Function of Strategic Purchasing and Its Application to the Korean National Health Insurance System (의료보장제도 운영에 있어서 전략적 구매의 개념과 한국 제도에의 적용)

  • Kim, Duck-Ho;Chung, Seol Hee
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.1
    • /
    • pp.504-516
    • /
    • 2018
  • Many countries have tried to reform financing systems toward UHC and paid attention to the function of strategic purchasing. This study was performed to examine theoretical foundations and the function of strategic purchasing. And we examined the functions of strategic purchasing in Korea based on the framework proposed by Preker(2005). For this purpose, we reviewed literature related to purchasing. we defined the strategic purchasing as strategic activities to provide health care services people need within a given budget, which is carried out by certain organizations, purchasing organizations. These activities include selecting appropriate providers, designing and operating the payment system, setting the price, and determining the target populations and their needs etc. The relationships among government, purchasers and healthcare providers can be explained by the principal-agent theory. In addition to Preker's framework, we emphasized the importance of the infrastructure such as decision making support systems, information systems, health care resource management systems, or expenditure monitoring systems. The National Health Insurance Service and the Health Insurance Review & Assessment Service play major roles in performing strategic purchasing.

Remodeling Process Model Applying Service Life and Functionality Evaluation for Military Facilities (내용연수와 기능성 평가를 활용한 군 시설물 리모델링 대상 선정 프로세스 모델)

  • Cho, Jongwoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Jaegon;Moon, Hyo-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.41-52
    • /
    • 2015
  • The number of military facilities has been rapidly increased due to growing requirement of modernization and military welfare. However, adequate maintenance has not implemented to these facilities. As a result, they are deteriorated quickly and require performance enhancement treatments. There are two ways of performance enhancement, reconstruction and remodeling. Despite the research result that remodeling within the standard remodeling range is more economical, remodeling of military facilities is not considered equivalent to reconstruction as an option of performance improvement. Therefore, derived from the relationship between performance change during life cycle of building and range of remodeling needs, this study tries to propose Remodeling Process Model(RPM) which uses a method to choose remodeling in a Specific Point of Time(SPT) when remodeling is considered more economical than reconstruction. In addition, this study suggests practical service life and functionality evaluation standard together which require to realize the RPM. This RPM make it possible to avoid the cases that facilities which do not have any problem on structural reliability but have low level of functionality miss appropriate remodeling timing and inevitably choose reconstruction as a performance improvement option. It also present the possibility of simple reconstruction / remodeling decision-making for facility managers who administrate building having various type, compilation and elapsed time. Consequently, this process model focusing on remodeling more may contribute to reduce resource waste caused by reconstruction.

Data Envelopment Analysis for Evaluating Construction R&D Efficiency (건설R&D사업의 효율성평가를 위한 DEA 연구)

  • Park, Sang-Hyuk;Han, Seung-Heon;Kim, Dae-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.255-260
    • /
    • 2007
  • The construction industry has been recognized as lagging behind other industries in the area of research and development (R&D) due primarily to the lack of R&D funds. To overcome this situation, the Korea Ministry of Construction and Transportation has a plan to expand its investments on the construction R&D up to 1.72 billion US dollars over the next 3 years. Despite this effort, it is still challenging to conduct the quantitative measurement on the efficiency of construction R&D projects, which can be utilized as the objective basis in the reasonable selection of a promising R&D team or in the consequential evaluation of a R&D performance. This study aims to conduct the efficiency analysis on the construction R&D projects to provide the basis for evaluating the performance of research and development. Toward this end, this study performs an efficiency analysis, which reflects all of the input and output data into/from the construction R&D by utilizing the Data Envelopment Analysis (DEA). The proposed methodology can be utilized to make a better decision on the priority of the R&D investments and present a sound basis to suggest the areas to be improved so as to reduce the inefficiency of R&D projects.

  • PDF

An Analysis of Factors Affecting Environmental Load in Earthwork Type of Road Project (도로건설공사 토공작업부에 대한 환경부하 영향인자 분석)

  • Park, Jin-Young;Im, Je-Gyu;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.52-60
    • /
    • 2018
  • In the construction industry, attempts to evaluate the environmental impact of products through life cycle assessment (LCA) approach has been on the rise. However, the domestic construction industry needs to make rapid decisions due to limited budget and schedule, so it is difficult to carry out a review of the environmental load on all resources. The decision-making process requires information on the major influence factors that should be focused on to reduce environmental load. And this information should be quantified so that it can be linked to environmental impact assessment. In this study, the LCA results of road construction cases were analyzed to provide such information. As a result, diesel, ready-mixed concrete, urethane-based paint, aggregate, and asphalt concrete were found to be the main factors that generated 93.17% of the environmental load in the earthwork type of road project. The total environmental cost caused by these affecting factors when constructing 1 km of earthwork type of road project is 242 million won. The analysis also shows that a 10% reduction in the amount of ready-mixed and asphalt concretes can reduce carbon emissions by 5.02% and 2.28% while reducing environmental costs by 11 million won per kilometer. In order to reduce carbon emissions of the earthwork type of road project, it is necessary to actively develop and introduce new methods and eco-friendly materials to reduce the overall use of ready-mixed concrete and asphalt concrete.

Liberating and Reviving the Concept of EA Business Architecture (EA 비즈니스 아키텍처 개념의 개방과 확대에 대한 제언)

  • Juhn, Sung Hyun
    • Journal of Information Technology and Architecture
    • /
    • v.10 no.4
    • /
    • pp.435-449
    • /
    • 2013
  • The performance of Enterprise Architecture (EA) in the Korea's public IT domain produces mixed results and responses. On the one hand, EA earns positive remarks and enthusiasm as a central government-wide IT governance framework with its significant IT budget saving records. At the same time, however, the response to EA at the department and agency level is tainted with disappointment, fatigue, and reluctance. This essay suggests that this is perhaps caused by the sterile lackluster concept of EA Business Architecture employed in the current EA practice of the enterprise. The possibility for liberating and reviving the concept of EA Business Architecture is explored. Various conceptual axes and branches of EA Business Architecture are identified based upon extensive EA field experience and observations, and discussions are made on how the concept of EA Business Architecture can be expanded and amplified on those conceptual axes and branched. The resulting EA Business Architecture conceptualization is consolidated into an illustrative typology for EA Business Architecture. In the end the theoretical and practical implications of the research are discussed along with its contribution and limitation.