Vehicular Collision Risk Assessment on the Highway Bridges in South Korea (국내 고속도로 교량의 차량 충돌 위험도 평가)

  • Min, Geun-Hyung;Kim, Woo-Seok;Cho, Jun-Sang;Gil, Heung-Bae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.5
    • /
    • pp.9-17
    • /
    • 2016
  • Vehicle collision to bridges has been known as one of the causes of bridge collapse, and the emergency plans and disaster management has been recently emphasized to secure public safety. This study conducted risk assessment of vehicular collision to bridges for highway bridges in Korea. Risk assessment consists of three steps; preliminary risk analysis(PRA), simplified risk analysis(SRA) and detailed risk analysis(DRA). The PRA firstly screens out the possibility of occurrence of the event. The SRA identifies influencial factors to risk of the event and evaluates risk scores to determine risk levels and necessity of DRA that investigates the risk of the bridge in detail. This study focuses on the methodology of the risk assessment, especially the SRA, and the stratification methods which evaluate risk levels of vehicular collision. The analysis results were compared to the reported vehicular collision accidents. The proposed method can be utilized in similar disaster management area.

Preliminary Hazard Analysis for ADS-B equipped Aircraft (ADS-B장착 항공기 예비위험분석)

  • Kim, Yong-Seok;Choi, Young-Jae;Shin, Dae-Won
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.16 no.3
    • /
    • pp.58-63
    • /
    • 2008
  • ICAO has recommended ADS-B implementation that is considered as next generation surveillance system to meet the air traffic capability and aviation safety. However, safety verification for the new ADS-B technology should be carried out in advance. FAA performed a preliminary hazard analysis for ADS-B equipped aircraft through Capstone program in Alaska in order to reduce aviation accidents. The present study deals with ADS-B concept, FAA Capstone program and PHA for ADS-B equipped aircraft. We expect that this paper will be a valuable material to assess ADS-B risk when it is applied to the domestic environment.

  • PDF

Preliminary Hazard Analysis for a Hyperbaric Oxygen Chamber (고압 산소 치료기에 대한 예비위험분석)

  • Jeon, Tae-Bo
    • Journal of Industrial Technology
    • /
    • v.33 no.A
    • /
    • pp.3-8
    • /
    • 2013
  • Reduction of risk plays a pivotal role in the development of medical instruments. A hyperbaric oxygen chamber, as a medical device, is known to help medical therapy for diversity of diseases through provision of high purity oxygen. The use of hyperbaric oxygen is expected to increase in the future and study to rigorously examine reliability and safety is needed. We have performed risk assessment for a newly developed hyperbaric oxygen chamber in this study. We first briefly discussed the system structure and concept of risk assessment for the study. Based on the hazards identified, we performed preliminary hazard analysis for the chamber.

  • PDF

청년농업 예비 창업자의 창업의도에 영향을 미치는 요인에 관한 연구

  • Lee, Il-Han;Lee, Eun-Cheon
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2019.04a
    • /
    • pp.97-102
    • /
    • 2019
  • 예비 청년 창업농을 대상으로 개인적 특성을 파악하고 개인적특성, 사회적인식, 네트워크, 창농정책, 자기효능감, 주관적규범을 조사하여 창업의도에 영향을 주는 요인들을 파악하고자 하였다. 개인적 특성의 하위 변수로 성취욕구, 위험감수성, 혁신성을 설정하여 자기효능감, 주관적규범, 창업의도와의 관련성을 연구 하였다. 본 연구의 자료 수집을 위한 설문조사는 2018년 10월 2일부터 2018년 10월 27일까지 농업관련 창업교육 프로그램을 수강하였거나 농업분야에 관심이 있는 청년 농업 예비 창업자들에게 본 연구의 목적과 취지를 설명하고 연구의 동의를 얻어 설문지 300부를 배부하였다. 배부된 설문지 중 263부가 회수되었으며, 설문지 중 미응답이 한 문항이라도 있거나 불성실하게 응답한 설문지 15부를 제외한 248부를 최종분석 자료로 활용하였다. 본 연구의 결과는 다음과 같다. 청년 농업 예비창업자의 창업의도에 영향을 주는 요인으로 개인적 특성 중 위험감수성과 혁신성이 파악되었다. 또한 상관관계에서도 혁신성과 위험감수성은 상관관계가 높은 것으로 분석되었다. 그리고 환경적 요인인 사회적 인식, 네트워크와 창농정책은 모두 창업 의지에 영향을 주는 것으로 검증되었다.

  • PDF

Development of the Screening Tool for Risk of Preterm Birth in Pregnant Women (임신부의 조산위험 선별도구 개발)

  • Cho, Mi-Ock;Kim, Jeung-Im
    • Journal of Digital Convergence
    • /
    • v.18 no.6
    • /
    • pp.335-344
    • /
    • 2020
  • This study was to develop a screening tool to identify the pregnant women who are required to have a concrete checkup or education about preterm birth. The items for the screening tool were drafted from literature review and the result of interviews with women who are hospitalized after preterm delivery based on the biopsychosocial framework. The validity and reliability of the items was performed after the content validity and the pilot survey. The screening tool for the risk of preterm birth in pregnant women was consisted of two parts. One was consisted of 9-items for the biomedical risks and another one was consisted of 17-items for the psycho-physical risks. The screening tool for the risk of preterm birth in pregnant women reveals valid and reliable. It could be applied to identify the pregnant women who have some risks of preterm birth.

Preliminary Hazard Analysis for Development of ICT-Based Local Control Center (ICT기반 지역제어센터 개발을 위한 예비위험원 분석)

  • Sung, Yu-Suk;Baek, Jong-Hyen;Kim, Gonyop;Kim, Youngju
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.9
    • /
    • pp.1819-1827
    • /
    • 2015
  • ICT-based on-board oriented train control system has been proposed to improve operation efficiency in low-density railway line. It is also needed to develop a new ICT-based local control center which relates to existing centralized traffic control lines. In order to meet the qualitative target of these developing system, RAMS activities are required. In this paper, through preliminary hazard analysis, hazards and their contributing factors are addressed, then countermeasures are established to control the risk to an acceptable level.

퇴직예정경찰관의 심리적 특성이 창업의지에 미치는 영향: 경력지향성의 조절효과를 중심으로

  • Kim, Dae-Gwang;Lee, U-Jin
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2016.04a
    • /
    • pp.177-179
    • /
    • 2016
  • 본 연구의 목적은 우리나라도 초 고령화시대가 도래 하고 있다. 80세의 평균수명이 100세 까지 늘어나면서 인생을 바라보는 관점이 달라지고 있다. 평생직장이 아닌 평생 직업으로 바뀌면서 정년 후 무엇을 하며 어떻게 살아갈 것인가. 경찰관 역시 후반전 인생설계를 하지 않을 수가 없다. 그러나 실상은 격무에 시달리고 퇴직 준비를 제대로 못하며 임무가 산적된 경우가 경찰관의 다반사가 현 실태이다. 그러면 이와 관련된 창업의 전 단계를 알아보자"퇴직예정 경찰관에게 심리적 특성요소들이 창업의지에 미치는 영향"과 -경력지향성의 조절효과 중심으로, 이에 부합되도록 예비창업가의 심리적 특성요인에 변수 요소를 찾아보면 사회적지향성, 성취욕구, 위험감수성, 자기 효능감, 창의성의 5가지 독립요소로 정리하고 창업의지를 종속 변수로 하여서 이들 간에 어떠한 영향을 미치는지 여부를 확인하고 마찬가지로 예비창업자 경력과 창업의지와 관계를 알아보며 경력지향성에 포함되는 요소들 관리, 사업, 안정, 기술, 자율지향성은 퇴직경찰관의 심리적 특성요인과 창업의지에 조절변수 요소들로 상관관계들을 검토해보기 위해서 연구모형과 가설을 세워본다. 또한 이를 위하여 검증단계로 현직경찰관 154명에 대한 설문지를 발송하였으며 접수가 완료되면 검증을 실시하기 위해 통계분석 처리를 할 예정이다. 첫째. 예비창업자의 개인적 특성으로 구성하는 요소들은 사회적지향성, 성취욕구, 위험감수성, 자기 유능감 창의성은 창업의지와 (+)정의 관계로 창업의지에 영향이 미칠 것이다. 둘째. 예비창업자의 경력이 창업의지와 (+)정의 관계로 창업의지에 영향이 미칠 것이다. 셋째. 예비창업자 경력 지향성에는 관리지향성 사업지향성 자율지향성 기술지향성 안정지향성은 심리적 특성과 창업의지에 조절효과로 정(+)의 관계로 영향을 미칠 것이다.

  • PDF

Risk Analysis of Highway Investment by Private Sectors (민자유치대상고속도로 투자의 위험도분석)

  • 이용택;김상범;원제무
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.5
    • /
    • pp.33-42
    • /
    • 1999
  • 본 논문은 도로투자 사업성분석시 사업주체의 현금흐름을 결정하는 항목들을 고정값(Deterministic Value)이 아닌 확률적으로 추정함으로써, 사업의 재무적 변동으로 인한 위험도를 민간사업자의 견지에서 사업성분석과정에 내재화하는 모형을 개발하는 것이다. 즉, 확률적 비용추정기법으로 국소적으로 활용되던 위험도분석을 재무모형에 내재화함으로써 사업의 재무적 변동을 보다 포괄적으로 분석할 수 있는 틀을 제공한다. 본 연구에서는 몬테카를로 시뮬레이션기법을 이용한 위험도분석(Risk Analysis)을 적용하여 사업성 평가지표와 비용의 확률밀도함수(Probability Density Function : PDF), 누적확률분포함수(Cumulative Distribution Function : CDF)를 산출하고, 그 결과로 해당 사업의 위험도를 고려하여 사업성을 평가한다. 이 모형은 사업의 모든 변동요인을 복합적으로 추정하여 사업기간 내 사업주체의 현금흐름을 분석할 수 있다. 따라서 사업주체는 효용에 따라 합리적인 위험도 관리 목표값(Target Value)을 선정하고, 사업의 위험도를 고려하여 건설비, 예비비를 결정할 수 있다. 본 연구에서 정립된 모형을 서울외곽순환고속도로(일산-퇴계원 구간)와 대전당진고속도로를 대상으로 사례분석을 수행하였다. 그 결과, 대전당진고속도로의 경우 사업성이 없으며, 서울외곽순환고속도로의 경우, 일부 위험도 발생변수를 합리적으로 관리한다면, 사업성이 충분한 것으로 분석되었다. 본 사례분석은 사업의 위험도를 반영한 사업성분석 방법으로 우리나라 민자유치대상고속도로의 사업성분석의 하나의 지침이 될 것이다.

  • PDF

Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.