• Title/Summary/Keyword: 연구개발 비용

Search Result 4,617, Processing Time 0.035 seconds

An Analyzing the Cost-Saving Effect of R&D Investment: Focusing on the ICT Industry (연구개발투자에 따른 비용저감 효과 분석: ICT산업을 중심으로)

  • Pak, Cheolmin;Han, Jeongmin;Ku, Bonchul
    • Journal of Technology Innovation
    • /
    • v.24 no.3
    • /
    • pp.81-105
    • /
    • 2016
  • The purpose of this study is to estimate the cost-saving effect of R&D investment in the ICT industry. As is well known, the R&D investment induces both the product innovation and the process innovation, in turn leads the effect of creating profit and cutting cost. However, it appears that studies concerned with the cost-saving effect of R&D investment have been unproductive, while most existing studies concentrate on the topic involved with the creating profit of R&D investment. Therefore, we extend the effect of R&D investment to a framework of the cost-saving focusing on the ICT industry. To empirically analyze the effect, we built a simultaneous three-equation model comprising a translog cost function and two cost share equations, and employed the SUR analysis. As a result, we found out that the cost-saving effect on the total cost is statistically significant. In addition, we examined relationships between the R&D investment and each cost of production elements. The results show that on the one hand, the R&D investment and the intermediate good cost have the substitution relationship. On the other hand, the complementary relationship is observed between the R&D investment and each labor or capital cost.

거래비용 개념을 사용한 다부처연구개발사업의 추진체계 효율성 평가방법 연구

  • Bang, Soohyun;Jin, Young-Hyun;Park, Chang-dae;Kim, Hyeonoh
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.11a
    • /
    • pp.209-228
    • /
    • 2017
  • 사회의 글로벌화와 다원화로 인한 행정수요가 다양화 되고 정책문제가 복잡해지면서 이를 해결하기 위한 부처 간의 협력이 강조되고 있다. 이에 따라 다부처연구개발사업(이하 다부처사업)의 수요가 확대되고 있는 상황에서, 실무적 측면의 다부처사업 추진체계 설계 및 평가를 위한 가이드라인이 필요하다. 이를 위해, 본 연구에서는 연구개발사업의 목적 및 내용에 따른 추진체계 평가방법을 개발하는 것을 목적으로 하였다. 본 연구에서는 추진체계의 효율성 평가를 위해 거래비용 개념을 도입한 평가방법론을 제안하였다. 추진체계를 도입함으로써 절감할 수 있는 거래비용과 발생하는 조직비용의 값을 비교하여 추진체계의 효율성을 분석할 수 있는 평가방법을 설계하였고, Williamson과 Coase의 이론을 도입하여 각 비용을 측정할 수 있는 대리지표를 도출하고 설문을 설계하였다. 전문가를 대상으로 델파이 조사를 진행하여 도출된 대리지표의 기획 평가 관점에 따른 가중치를 설정하였다. 제안한 평가방법의 적용 가능성을 검증하고 보완사항을 도출하고자 현재 추진되고 있는 4개의 다부처사업에 대한 사례연구를 수행하였다. 본 연구는 다부처사업의 추진체계의 효율성을 사전적 및 사후적으로 평가할 수 있는 방법을 제시하였다는 점에서 의의가 있다.

  • PDF

The Cost Optimization Solution for Developing the Image Infra-Red (IIR) Missile Seeker Operated Under Various Environments (정밀 유도무기용 적외선 영상탐색기의 운용환경에 따른 성능대비 개발비용 최적화 연구)

  • Kim, Ho-Yong;Kang, Seok-Joong;Jhee, Ho-Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.4
    • /
    • pp.365-373
    • /
    • 2019
  • An Image Infra-Red(IIR) seeker is widely used for precision guided munitions to provide intelligent and precise target detection in terms of high kill probability. However, there have been issues in determining the performance versus cost trade-offs due to high cost of seeker comparing to other units of the munitions. In this paper, performance/cost evaluations have been carried out to find the most cost-effective solution for developing the IIR seekers. The relationships between the critical parameters and cost are investigated to determine the optimal point which represents the low cost with high performance. It is expected that the presented approach will be able to be used for guidelines to select the appropriate IIR seeker for the given operating conditions and can be useful to estimate the cost effectiveness of the precision guided munitions at early design stage.

Case studies in software development projects apply EVM(Earned Value Management) (소프트웨어개발 프로젝트에서의 획득가치관리(EVM: Earned Value Management) 적용 사례 연구)

  • Jun, Sung-Chul;Kim, Ja-Hee
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.260-265
    • /
    • 2008
  • 소프트웨어 개발 프로젝트 초기단계에 수립한 일정 및 비용 등의 계획은 수행 중 발생하는 많은 불확실성을 반영하고 있지 않기 때문에 진행되고 있는 프로젝트는 초기에 계획한 일정과 비용에 많은 차이를 보이는 경우가 발생한다. 이에 따라 본 연구에서는 진행 중인 소프트웨어 개발 프로젝트의 상황을 분석하고 예측할 수 있는 방법으로 일정과 비용을 통합 관리할 수 있는 획득가치관리(EVM: Earned Value Management)를 활용하는 방안을 제시하였다. 획득가치관리(EVM)을 적용하기 위해 일정과 비용의 통합관리하기 위해 예상되는 투입 인력과 비용 등을 감안하여 작업분할 구조(WBS)와 연계하여 계획을 수립하고 측정하는 방법을 구축 중인 프로젝트의 사례를 통하여 적용 방안을 제시하였다. 사례 분석한 각각의 프로젝트 진행 단계에 따라 예측한 값이 실제 계획 대비 일정과 비용에 대한 예측 오차 변화 추이를 분석하였으며, 향후 진행되는 프로젝트의 일정 및 비용 등의 계획을 체계적으로 수립하고, 진행되는 프로젝트의 일정 및 비용 등에 대해 분석하고 예측하는데 활용할 수 있도록 연구하였다.

  • PDF

A method of SW development cost estimation for SBA's cost-effectiveness analysis (SBA 효과도 분석을 위한 소프트웨어 개발 비용 산정기법 연구)

  • Choi, Dal-Nim;Kim, Hyung-Jong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.337-339
    • /
    • 2011
  • M&S 기반의 가상환경 설계운영은 자원절약 및 위험성 감소 등 다양한 측면에서 효율성을 지니고 있다. 국방은 현실세계에서 실시하기 어려운 군사작전 시뮬레이션 운영을 위해 국방 M&S 개념을 도입하고, 이를 기반으로 무기체계의 소요도출부터 전력화 단계까지 프로세스 전반에 걸쳐 가상 환경에서의 설계 운영 및 검증을 수행하는 SBA 를 도입하였다. 그러나 모델링 및 시뮬레이션 과정에서 발생되는 고비용, 위험성 등의 문제점은 SBA 도입 효율성에 대한 논란의 요인이 된다. 따라서 SBA 도입 효과를 입증할 수 있는 지표 제시가 요구되며, 이 연구에서는 입증 지표로서 비용, 시간, 품질 및 위험도의 4 가지 요소를 분석한다. 또한 소프트웨어 개발비용 산정의 어려움 및 SBA의 고비용 가능성을 이유로 SBA 에 대한 개발비용 산정의 필요성을 제기한다. SBA 개발비용 산정을 위해 기존에 제시된 소프트웨어 개발비용 산정 모델 적용을 제안하고, COCOMO 모델, Putnam 모델, FP모델, 전문가의 감정 및 델파이 기법 등 소프트웨어 개발비용 산정모델을 기반으로 SBA 개발비용 산정에 적합한 모델을 분석한다.

A Study On Developing Weapon System CERs With Considering Various Data Characteristics (다양한 데이터 특성을 고려한 무기체계 비용추정관계식 개발 연구)

  • Jung, Won-Il;Kim, Dong-Kyu;Kang, Sung-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.3
    • /
    • pp.43-56
    • /
    • 2010
  • Recently, the acquisition environment of the Korean defense weapon system is emphasizing more the importance of cost analysis in terms of efficient execution for defense acquisition budget. While cost analysis, however, is emphasized in law and process, its infrastructures are still insufficient We have been using computerized cost models to obtain an estimate at early phase of project. But those models have been developed by foreign companies, and so they have many limitations when using in Korean defense environment. For this reason, it began to sympathize that we need the development of the Korean version cost estimation model suitable for our defense industry environment, and now many studies are proceeding. In this study, we suggest Cost Estimating Relationships(CERs) developing methodologies which is key logics of Korean version cost estimation model. Especially, we proposed a new CER's development process depending upon data characteristics such as, multicolinearity, outlier, small samples and heteroscedasticity. Also, we presented a case study for artillery weapon system using these methods we developed. We find that these CERs could be verified through theoretical methods.

A Study on the Measures for Applying Standard Development Cost for the Revision of Development Charge System (개발부담금 개편을 위한 표준개발비용 적용방안 연구)

  • Lee, Sam-Su;Jeong, Da-Woon;Song, Young-Il
    • Land and Housing Review
    • /
    • v.4 no.1
    • /
    • pp.99-105
    • /
    • 2013
  • Development Charge System was introduced in 1989 to recapture development gains, however, it has been revised more than 20 times since then. The reason for such frequent revisions was that estimating development cost was too composite and indefinite. Therefore it is required that estimating method of development cost should be simplified in order to minimize conflicts among diverse parties. To support the recent revision of 'Restitution and Development Gains Act', this study verified several alternatives of applying standardized costs per area under specific size of development and suggested policy implications. For analysis data, 9,362 Development Charge and cost data of si gun gu for recent 3 years were used. The results showed that dividing Seoul Metropolitan Area (SMA) and non-SMA made a significant difference and definite divisions among regional groups. The result of this study could minimize social conflicts as well as contribute in realizing the public concept of land policy by revising Development Charge System.

Regulations and Costing Model for Mobile Interconnection in Europe (유럽의 이동망 상호접속 규제 및 비용산정모형 검토)

  • 조은진
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.05a
    • /
    • pp.624-628
    • /
    • 2003
  • EC(European Commission)는 유럽의 이동전화시장에서 전반적으로 경쟁이 이루어지고 있지만 호착신시장과 같은 상호접속시장에서는 경쟁이 불충분하다고 판단하고 있다. 이로 인하여 착신접속료를 설정하는데 있어서 경쟁인센티브가 결여된다는 입장이다. 따라서 EC는 이동망 비용규제 방안을 모색하고 비용산정에 관한 지침을 마련하기 위하여 활발히 연구진행중이며 이의 일환으로 EE(Europe Economics)에게 Bottom-up 방식의 이동망 LRIC 모형 개발을 위탁하였다. 본 연구에서는 유럽 각국의 상호접속시장 비용규제 현황을 파악하고 EE에서 개발한 LRIC 비용산정모형을 살펴보고 모형 개발과정에서 발생하는 쟁점이 되는 사항들을 파악하여 국내 이동망 LRIC 비용모형개발에 대한 시사점을 살펴보고자 한다.

  • PDF

An Opportunity Cost Based Headway Algorithm in Bus Operation (기회손실비용을 고려한 버스 운행시격과 링크 통행시간 예측 알고리즘)

  • 이영호;조현성;김영진;안계형;배상훈
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.3
    • /
    • pp.43-54
    • /
    • 2000
  • 이 연구는 버스정보 시스템 설계에 필요한 운행시격 결정과 통행시간 예측을 위한 알고리즘 개발을 다룬다. 운행시격 결정 문제는 버스와 같은 대중교통 수단을 운영하는데 중요한 요소 중에 하나이다. 기존 연구는 버스 운행비용과 승객비용의 합을 최소로 하는 운행시 격을 찾는데 초점을 두고 이다. 이때 승객비용이란 승객 대기비용과 승객 교통비용의 합으로 이루어진다. 그런데 우리나라와 같이 버스회사 수입이 전액 운행수입에만 의존하는 경우엔 이러한 접근 방식이 타당하지 않다. 기존의 방식과 다르게 승객비용으로 승객 이탈비용을 사용하여 버스의 최적 운행시 격을 구하는 것이 이 연구의 목적이다. 먼저 정류장이 하나인 경우에 대해 해석적 방법으로 풀고, 정류장이 여러 개인 경우에 대해서는 시뮬레이션 기법을 적용한다. 또한 이 연구는 신뢰성이 높고 정확한 통행시간 예측정보를 산출하기 위해 2 단계 예측 기법과 전문가시스템을 이용하는 자료융합 알고리즘을 개발한다. 정확한 정보를 제공하려면 교통정보 수집원을 통해 얻는 자료가 정확해야 하고, 또한 교통상황 변화에 따라 실시간으로 통행시간을 예측하는 것이 필요하다. 이 연구는 AVL(Automatic Vehicle Location)시스템을 이용한 버스정보시스템에서 실시간 데이터와 과거 데이터를 융합하여 통행시간을 예측하는 알고리즘을 개발한다. AVL 데이터를 수집하는 과정에서는 경제성을 고려하여 데이터를 수집한다. 그리고, 버스의 운행관리와 정확한 도착예정시간을 예측하기 위해 AVL시스템을 통해 얻은 데이터의 패턴을 분석하고 유고상황을 감지한다.

  • PDF

심층탐구 / 데이터베이스 개발 비용산정에 관한 연구

  • Ham, Jeong-Hun
    • Digital Contents
    • /
    • no.9 s.100
    • /
    • pp.30-34
    • /
    • 2001
  • 데이터베이스에 대한 논의 중 비용 산정에 대한 연구는 그리 큰 성과를 얻지 못했다. 그동안 논의는 많이 되었으나 실질적으로 데이터베이스 비용산정에 대해 집중적으로 연구한 것은 미비하다고 할 수 있다. 본고는 그러한 데이터베이스 비용산정에 대한 방향 설정과 이후 연구 과제에 대해 기술하고 있어서 향후 데이터베이스 비용산정에 기초 자료로 제공되기를 기대한다.

  • PDF