• Title/Summary/Keyword: 역계산법

Search Result 268, Processing Time 0.032 seconds

Wintertime Extreme Storm Waves in the East Sea: Estimation of Extreme Storm Waves and Wave-Structure Interaction Study in the Fushiki Port, Toyama Bay (동해의 동계 극한 폭풍파랑: 토야마만 후시키항의 극한 폭풍파랑 추산 및 파랑 · 구조물 상호작용 연구)

  • Lee, Han Soo;Komaguchi, Tomoaki;Yamamoto, Atsushi;Hara, Masanori
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.25 no.5
    • /
    • pp.335-347
    • /
    • 2013
  • In February 2008, high storm waves due to a developed atmospheric low pressure system propagating from the west off Hokkaido, Japan, to the south and southwest throughout the East Sea (ES) caused extensive damages along the central coast of Japan and along the east coast of Korea. This study consists of two parts. In the first part, we estimate extreme storm wave characteristics in the Toyama Bay where heavy coastal damages occurred, using a non-hydrostatic meteorological model and a spectral wave model by considering the extreme conditions for two factors for wind wave growth, such as wind intensity and duration. The estimated extreme significant wave height and corresponding wave period were 6.78 m and 18.28 sec, respectively, at the Fushiki Toyama. In the second part, we perform numerical experiments on wave-structure interaction in the Fushiki Port, Toyama Bay, where the long North-Breakwater was heavily damaged by the storm waves in February 2008. The experiments are conducted using a non-linear shallow-water equation model with adaptive mesh refinement (AMR) and wet-dry scheme. The estimated extreme storm waves of 6.78 m and 18.28 sec are used for incident wave profile. The results show that the Fushiki Port would be overtopped and flooded by extreme storm waves if the North-Breakwater does not function properly after being damaged. Also the storm waves would overtop seawalls and sidewalls of the Manyou Pier behind the North-Breakwater. The results also depict that refined meshes by AMR method with wet-dry scheme applied capture the coastline and coastal structure well while keeping the computational load efficiently.

Stability Analysis of Open Pit Slopes in the Pasir Coal Field, Indonesia (인도네시아 Pasir 탄전에서의 노천채탄장 사면의 안전성해석)

  • 정소걸;선우춘;한공창;신희순;박연준
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2000.09a
    • /
    • pp.183-193
    • /
    • 2000
  • A series of studies such as geological logging data analysis, detailed geological survey, rock mass evaluation, in-situ and laboratory tests, rock strength and mechanical properties of the rock were concerned. The stability of the slope were carried out inorder to design the pit slope and individual benches using the stereographic projection analysis and numerical methods in Roto Pit of Pasir coal fetid. The bedding plane was one of the major discontinuities in the Roto Pit and the dip of which is about $60^{\circ}$in the northern part and $83^{\circ}$in the southern part. The dip of bedding becomes steeper from north to south. The plane and toppling failures are presented in many slopes. In laboratory test the average uniaxial compressive strength of mudstone was 9 MPa and that of weak sandstone was 10 MPa. In-situ test showed that the rocks of Roto north mining area are mostly weak enough to be classified in grade from R2(weak) to R3(medium strong weak) and the coal is classified in grades from R1(Very weak) to R2(Weak). The detailed stability analysis were carried out on 4 areas of Roto north(east, west, south and north), and 2 areas of Roto south(east and west). In this paper, the minimum factor of safety was set to 1.2 which is a general criterion for open pit mines. Using the stereographic projection analysis and the limit equilibrium method, slope angles were calculated as 30~$36^{\circ}$for a factor of safety greater than 1.2. Then these results were re-evaluated by numerical analysis using FLAC. The final slope angles were determined by rational described abode. A final slope of 34 degrees can guarantee the stability for the eastern part of the Roto north area, 33 degrees for the western part, 35 degrees for the northern part and 35 degrees for the southern part. For the Roto south area, 36 degrees was suggested for both sides of the pit. Once the pit slope is designed based on the stability analysis and the safety measures. the stability of 니ope should be checked periodically during the mining operations. Because the slope face will be exposed long time to the rain fall, a study such aspreventive measures against weathering and erosion is highly recommended to be implemented.

  • PDF

Stability Analysis of Open Pit Slopes in the Pasir Coal Field, Indonesia (인도네시아 Pasir 탄전에서의 노천채탄장 사면의 안정성 해석)

  • 정소걸;선우춘;한공창;신희순;박연준
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.430-440
    • /
    • 2000
  • A series of studies such as geological logging data analysis, detailed geological survey, rock mass evaluation, in-situ and laboratory tests, rock strength and mechanical properties of the rock were concerned. The stability of the slope were carried out inorder to design the pit slope and individual benches using the stereographic projection analysis and numerical methods in Roto Pit of Pasir coal field. The bedding plane was one of the major discontinuities in the Roto Pit and the dip of which is about 60$^{\circ}$ in the northern part and 83$^{\circ}$ in the southern part. The dip of bedding becomes steeper from north to south. The plane and toppling failures are presented in many slopes. In laboratory test the average uniaxial compressive strength of mudstone was 9MPa and that of weak sandstone was 10MPa. In-situ test showed that the rocks of Roto north mining area are mostly weak enough to be classified in grade from R2(weak) to R3(medium strong weak) and the coal is classified in grades from R1(Very weak) to R2(Weak). The detailed stability analysis were carried out on 4 areas of Roto north (east, west, south and north), and 2 areas of Roto south(east and west). In this paper, the minimum factor of safety was set to 1.2 which is a general criterion for open pit mines. Using the stereographic projection analysis and the limit equilibrium method, slope angles were calculated as 30∼36$^{\circ}$ for a factor of safety greater than 1.2. Then these results were re-evaluated by numerical analysis using FLAC. The final slope angles were determined by rational described above. A final slope of 34 degrees can guarantee the stability for the eastern part of the Roto north area, 33 degrees for the western part, 35 degrees for the northern part and 35 degrees for the southern part. For the Roto south area, 36 degrees was suggested for both sides of the pit. Once the pit slope is designed based on the stability analysis and the safety measures, the stability of slope should be checked periodically during the mining operations. Because the slope face will be exposed long time to the rain fall, a study such aspreventive measures against weathering and erosion is highly recommended to be implemented.

  • PDF

Least-Square Fitting of Intrinsic and Scattering Q Parameters (최소자승법(最小自乘法)에 의(衣)한 고유(固有) Q와 산란(散亂) Q의 측정(測定))

  • Kang, Ik Bum;McMechan, George A.;Min, Kyung Duck
    • Economic and Environmental Geology
    • /
    • v.27 no.6
    • /
    • pp.557-561
    • /
    • 1994
  • Q estimates are made by direct measurements of energy loss per cycle from primary P and S waves, as a function of frequency. Assuming that intrinsic Q is frequency independent and scattering Q is frequency dependent over the frequencies of interest, the relative contributions of each, to a total observed Q, may be estimated. Test examples are produced by computing viscoelastic synthetic seismograms using a pseudo spectral solution with inclusion of relaxation mechanisms (for intrinsic Q) and a fractal distribution of scatterers (for scattering Q). The composite theory implies that when the total Q for S-waves is smaller than that for P-waves (the usual situation), intrinsic Q is dominating; when it is larger, scattering Q is dominating. In the inverse problem, performed by a global least squares search, intrinsic $Q_p$ and $Q_s$ estimates are reliable and unique when their absolute values are sufficiently low that their effects are measurable in the data. Large $Q_p$ and $Q_s$ have no measurable effect and hence are not resolvable. Standard deviation of velocity $({\sigma})$ and scatterer size (A) are less unique as they exhibit a tradeoff as predicted by Blair's equation. For the P-waves, intrinsic and scattering contributions are of approximately the same importance, for S-waves, the intrinsic contributions dominate.

  • PDF

Lung Uptake of $^{99m}Tc-sestamibi$ during Routine Gated Exercise SPECT Imaging : Comparison with Left Ventricular Ejection Fraction and Severity of Perfusion Defect (일상적인 운동 부하 게이트 심근 관류 SPECT에서 $^{99m}Tc-sestamibi$ 폐섭취 : 좌심실 구혈률과 관류 결손 정도와의 비교)

  • Jeong, Shin-Young;Lee, Jae-Tae;Bae, Jin-Ho;Ahn, Byeong-Cheol;Lee, Kyu-Bo
    • The Korean Journal of Nuclear Medicine
    • /
    • v.37 no.2
    • /
    • pp.83-93
    • /
    • 2003
  • Background: Lung-to-heart uptake ratio (LHR) in $^{201}Tl-chloride$ myocardial perfusion scan is believed to be a reliable marker for left ventricular (LV) dysfunction, but the clinical value of LHR is controversial for $^{99m}Tc-MIBI$ imaging. Furthermore, most of results suggesting lung uptake of $^{99m}Tc-MIBI$ as a potential marker for LV dysfunction used immediate post-stress images, instead of routine images acquired 1 hour after tracer injection. The goal of our study was to investigate whether LHR evaluated with routine gated $^{99m}Tc-MIBI$ imaging can reflect the degree of perfusion defect or left ventricular performance. Subjects and Methods: 241 patients underwent exercise $^{99m}Tc-MIBI$ myocardial SPECT were classified into normal myocardial perfusion (NP, n=135) and abnormal myocardial perfusion (AP, n=106) group according to the presence of perfusion defect. LHR was calculated from anterior projection image taken at 1-hour after injection. Two legions of interest (ROIs) were placed on left lung above LV and on myocardium showing the highest radioactivity. Subjects were classified by left ventricular ejection fraction (LVEF), as Gr-I: >50%, Gr-II: 36-50%, Gr-III: <36% and by summed stress score (SSS), as Gr-A: <4, Gr-B: 4-8, Gr-C: 9-13, Gr-D: >13, LHR was compared among these groups. Results: In NP group(n=135), LHR, were higher in men than women ($men:\;0.311{\pm}0.03,\;women:\;0.296{\pm}0.03,\;p<0.05$). Significant difference, in LHR were found between NP and AP groups both for men and women ($men:\;0.311{\pm}0.03\;vs\;.\;0.331{\pm}0.06,\;women:\;0.296{\pm}0.03\;vs.\;0.321{\pm}0.07.\;p<0.05$). There were weak negative correlation between LHR and LVEF (r=-0.342, p<0.05) and weak positive correlation between LHR and SSS (r=0.478, p<0.05) in men, but not in women (LVEF: r=-0.279, p=0.100, SSS: r=0.276, p=0.103). Increased LHR was defined when for more than mean + 2SD value ($men{\geq}0.38,\;women{\geq}0.37$) of the LHR of the subject with normal perfusion. Increased LHR were observed more frequently in subjects with lower LVEF (Gr-I: 11.1%, Gr-II: 27.0%, Gr-III: 35.4%, p<0.05) and higher SSS(Gr-A: 14.0%, Gr-B: 5.7%, Gr-C: 18.2%, Gr-D: 40.7%, p<0.05). Conclusions: LHRs obtained from routine $^{99m}Tc-MIBI$ gated SPECT images were weakly correlated with LVEF and perfusion defect. Although significant overlaps were observed between normal and abnormal perfusion group, LHRs could be used as an indirect marker of severe perfusion defect or reduced left ventricular function.

A Study on the Stock Assessment and Management Implications of the Korean Aucha perch (Coreoperca herzi) in Freshwater: (1) Estimation of Population Ecological Characteristics of Coreoperca herzi in the Mid-Upper System of the Seomjin River (담수산 어류 꺽지 (Coreoperca herzi)의 자원 평가 및 관리 방안 연구: 섬진강 중.상류 수계에서 꺽지의 개체군 생태학적 특성치 추정 (1))

  • Jang, Sung-Hyun;Ryu, Hui-Seong;Lee, Jung-Ho
    • Korean Journal of Ecology and Environment
    • /
    • v.43 no.1
    • /
    • pp.82-90
    • /
    • 2010
  • The ecological characteristics of the Korean Aucha perch, Coreoperca herzi, were determined in order to estimate stock of the mid-upper system of the Seomjin River. The age was determined by counting the otolith annuli. The oldest fish observed in this study was 5 years old. Relationships between body length (BL) and body weight (BW) were $BW=0.0195BL^{3.08}$ ($R^2=0.966$) (p<0.01). Relationships between the otolith radius (R) and body length (BL) were BL=3.882R+1.66 ($R^2=0.944$). The von Bertalanffy growth parameters estimated from a non-linear regression method were $L_{\infty}=19.68\;cm$, $W_{\infty}=188.64\;g$, $K=0.17\;year^{-1}$ and $t_0=-1.46$ year. Therefore, growth in length of the fish was expressed by the von Bertalanffy's growth equation as $L_t=19.68$ ($1-e^{-0.17(t+1.46)}$) ($R^2=0.997$). The annual survival rate (S) was estimated to be $0.666\;year^{-1}$. The instantaneous coefficient of natural mortality (M) of estimated from the Zhang and Megrey method was $0.346\;year^{-1}$, and instantaneous coefficient of fishing mortality (F) was calculated $0.061\;year^{-1}$. From the estimates of survival rate (S), the instantaneous coefficient of total mortality(Z) was estimated to be $0.407\;year^{-1}$.

The Role of Protein Kinase C in Acute Lung Injury Induced by Endotoxin (내독소에 의한 급성폐손상에서 Protein Kinase C의 역할)

  • Kim, Yong-Hoon;Moon, Seung-Hyug;Kee, Sin-Young;Ju, Jae-Hak;Park, Tae-Eung;Im, Keon-Il;Cheong, Seung-Whan;Kim, Hyeon-Tae;Park, Choon-Sik;Jin, Byung-Won
    • Tuberculosis and Respiratory Diseases
    • /
    • v.44 no.2
    • /
    • pp.349-359
    • /
    • 1997
  • Background : The signal pathways and their precise roles for acute respiratory distress syndrome caused by endotoxin (ETX) has not been established. Since there has been several in vitro experiments suggesting that activation of protein kinase C (PKC) pathway may be responsible for endotoxin-induced inflammatory reaction, we performed in vivo experiments in the rats with the hypothesis that PKC-inhibition can effectively prevent endotoxin-induced acute lung injury. Methods : We studied the role of PKC in ETX-induced ALI using PKC inhibitor (staurosporine, STP) in the rat Specific pathogen free male Sprague-Dawley weighted from 165 to 270g were used for the study. Animals were divided into the normal control (NC)-, vehicle control (VC)-, ETX-, PMA (phorbolmyristateacetate)-, STP+PMA-, and STP+ETX-group. PMA (50mg/kg) or ETX (7mg/kg) was instilled through polyethylen catheter after aseptic tracheostomy with and without STP (0.2mg/kg)-pretreatment STP was injected via tail vein 30min before intratracheal injection (IT) of PMA or ETX. Bronchoalveolar lavage (BAL) was done 3-or 6-hrs after IT of PMA or ETX respectively, to measure protein concentration, total and differential cell counts. Results : The results were as follows. The protein concentrations in BALF in the PMA- and ETX-group were very higher than that of VC-group (p<0.001). When animals were pretreated with STP, the %reduction of the protein concentration in BALF was $64.8{\pm}8.5$ and $30.4{\pm}2.5%$ in the STP+PMA- and STP+ETX-group, respectively (p = 0.028). There was no difference in the total cell counts between the PMA-and VC-group (p = 0.26). However the ETX-group showed markedly increased total cell counts as compared to the VC- (p = 0.003) and PMA-group (p = 0.0027), respectively. The total cell counts in BALF were not changed after pretreatment with STP compared to the PMA- (p = 0.22) and ETX-group (p = 0.46). The percentage of PMN, but not alveolar macrophage, was significantly elevated in the PMA-, and ETX-group. Especially in the ETX-group, the percentage of PMN was 17 times higher than that of PMA (p < 0.001). The differential cell counts was not different between the PMA and STP+PMA On the contrary the STP+ETX-group showed decreased percentage of PMN (p = 0.016). There was no significant relationship between the protein concentration and the total or differential cell counts in each group. Conclusion : Pretreatment with PKC-inhibitor (staurosporine) partially but significantly inhibited ETX-induced ALI.

  • PDF

A Study on Forest Insurance (산림보험(山林保險)에 관한 연구(硏究))

  • Park, Tai Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.15 no.1
    • /
    • pp.1-38
    • /
    • 1972
  • 1. Objective of the Study The objective of the study was to make fundamental suggestions for drawing a forest insurance system applicable in Korea by investigating forest insurance systems undertaken in foreign countries, analyzing the forest hazards occurred in entire forests of Korea in the past, and hearing the opinions of people engaged in forestry. 2. Methods of the Study First, reference studies on insurance at large as well as on forest insurance were intensively made to draw the characteristics of forest insurance practiced in main forestry countries, Second, the investigations of forest hazards in Korea for the past ten years were made with the help of the Office of Forestry. Third, the questionnaires concerning forest insurance were prepared and delivered at random to 533 personnel who are working at different administrative offices of forestry, forest stations, forest cooperatives, colleges and universities, research institutes, and fire insurance companies. Fourth, fifty three representative forest owners in the area of three forest types (coniferous, hardwood, and mixed forest), a representative region in Kyonggi Province out of fourteen collective forest development programs in Korea, were directly interviewed with the writer. 3. Results of the Study The rate of response to the questionnaire was 74.40% as shown in the table 3, and the results of the questionaire were as follows: (% in the parenthes shows the rates of response; shortages in amount to 100% were due to the facts of excluding the rates of response of minor respondents). 1) Necessity of forest insurance The respondents expressed their opinions that forest insurance must be undertaken to assure forest financing (5.65%); for receiving the reimbursement of replanting costs in case of damages done (35.87%); and to protect silvicultural investments (46.74%). 2) Law of forest insurance Few respondents showed their views in favor of applying the general insurance regulations to forest insurance practice (9.35%), but the majority of respondents were in favor of passing a special forest insurance law in the light of forest characteristics (88.26%). 3) Sorts of institutes to undertake forest insurance A few respondents believed that insurance companies at large could take care of forest insurance (17.42%); forest owner's mutual associations would manage the forest insurance more effectively (23.53%); but the more than half of the respondents were in favor of establishing public or national forest insurance institutes (56.18%). 4) Kinds of risks to be undertaken in forest insurance It would be desirable that the risks to be undertaken in forest insurance be limited: To forest fire hazards only (23.38%); to forest fire hazards plus damages made by weather (14.32%); to forest fire hazards, weather damages, and insect damages (60.68%). 5) Objectives to be insured It was responded that the objectives to be included in forest insurance should be limited: (1) To artificial coniferous forest only (13.47%); (2) to both coniferous and broad-leaved artificial forests (23.74%); (3) but the more than half of the respondents showed their desire that all the forests regardless of species and the methods of establishment should be insured (61.64%). 6) Range of risks in age of trees to be included in forest insurance The opinions of the respondents showed that it might be enough to insure the trees less than ten years of age (15.23%); but it would be more desirous of taking up forest trees under twenty years of age (32.95%); nevertheless, a large number of respondents were in favor of underwriting all the forest trees less than fourty years of age (46.37%). 7) Term of a forest insurance contract Quite a few respondents favored a contract made on one year basis (31.74%), but the more than half of the respondents favored the contract made on five year bases (58.68%). 8) Limitation in a forest insurance contract The respondents indicated that it would be desirable in a forest insurance contract to exclude forests less than five hectars (20.78%), but more than half of the respondents expressed their opinions that forests above a minimum volume or number of trees per unit area should be included in a forest insurance contract regardless of the area of forest lands (63.77%). 9) Methods of contract Some responded that it would be good to let the forest owners choose their forests in making a forest insurance contract (32.13%); others inclined to think that it would be desirable to include all the forests that owners hold whenerver they decide to make a forest insurance contract (33.48%); the rest responded in favor of forcing the owners to buy insurance policy if they own the forests that were established with subsidy or own highly vauable growing stock (31.92%) 10) Rate of premium The responses were divided into three categories: (1) The rate of primium is to be decided according to the regional degree of risks(27.72%); (2) to be decided by taking consideration both regional degree of risks and insurable values(31.59%); (3) and to be decided according to the rate of risks for the entire country and the insurable values (39.55%). 11) Payment of Premium Although a few respondents wished to make a payment of premium at once for a short term forest insurance contract, and an annual payment for a long term contract (13.80%); the majority of the respondents wished to pay the premium annually regardless of the term of contract, by employing a high rate of premium on a short term contract, but a low rate on a long term contract (83.71%). 12) Institutes in charge of forest insurance business A few respondents showed their desire that forest insurance be taken care of at the government forest administrative offices (18.75%); others at insurance companies (35.76%); but the rest, the largest number of the respondents, favored forest associations in the county. They also wanted to pay a certain rate of premium to the forest associations that issue the insurance (44.22%). 13) Limitation on indemnity for damages done In limitation on indemnity for damages done, the respondents showed a quite different views. Some desired compesation to cover replanting costs when young stands suffered damages and to be paid at the rate of eighty percent to the losses received when matured timber stands suffered damages(29.70%); others desired to receive compensation of the actual total loss valued at present market prices (31.07%); but the rest responded in favor of compensation at the present value figured out by applying a certain rate of prolongation factors to the establishment costs(36.99%). 14) Raising of funds for forest insurance A few respondents hoped to raise the fund for forest insurance by setting aside certain amount of money from the indemnity paid (15.65%); others wished to raise the fund by levying new forest land taxes(33.79%); but the rest expressed their hope to raise the fund by reserving certain amount of money from the surplus money that was saved due to the non-risks (44.81%). 15) Causes of fires The main causes of forest fires 6gured out by the respondents experience turned out to be (1) an accidental fire, (2) cigarettes, (3) shifting cultivation. The reponses were coincided with the forest fire analysis made by the Office of Forestry. 16) Fire prevention The respondents suggested that the most important and practical three kinds of forest fire prevention measures would be (1) providing a fire-break, (2) keeping passers-by out during the drought seasons, (3) enlightenment through mass communication systems. 4. Suggestions The writer wishes to present some suggestions that seemed helpful in drawing up a forest insurance system by reviewing the findings in the questionaire analysis and the results of investigations on forest insurance undertaken in foreign countries. 1) A forest insurance system designed to compensate the loss figured out on the basis of replanting cost when young forest stands suffered damages, and to strengthen credit rating by relieving of risks of damages, must be put in practice as soon as possible with the enactment of a specifically drawn forest insurance law. And the committee of forest insurance should be organized to make a full study of forest insurance system. 2) Two kinds of forest insurance organizations furnishing forest insurance, publicly-owned insurance organizations and privately-owned, are desirable in order to handle forest risks properly. The privately-owned forest insurance organizations should take up forest fire insurance only, and the publicly-owned ought to write insurance for forest fires and insect damages. 3) The privately-owned organizations furnishing forest insurance are desired to take up all the forest stands older than twenty years; whereas, the publicly-owned should sell forest insurance on artificially planted stands younger than twenty years with emphasis on compensating replanting costs of forest stands when they suffer damages. 4) Small forest stands, less than one hectare holding volume or stocked at smaller than standard per unit area are not to be included in a forest insurance writing, and the minimum term of insuring should not be longer than one year in the privately-owned forest insurance organizations although insuring period could be extended more than one year; whereas, consecutive five year term of insurance periods should be set as a mimimum period of insuring forest in the publicly-owned forest insurance organizations. 5) The forest owners should be free in selecting their forests in insuring; whereas, forest owners of the stands that were established with subsidy should be required to insure their forests at publicly-owned forest insurance organizations. 6) Annual insurance premiums for both publicly-owned and privately-owned forest insurance organizations ought to be figured out in proportion to the amount of insurance in accordance with the degree of risks which are grouped into three categories on the basis of the rate of risks throughout the country. 7) Annual premium should be paid at the beginning of forest insurance contract, but reduction must be made if the insuring periods extend longer than a minimum period of forest insurance set by the law. 8) The compensation for damages, the reimbursement, should be figured out on the basis of the ratio between the amount of insurance and insurable value. In the publicly-owned forest insurance system, the standard amount of insurance should be set on the basis of establishment costs in order to prevent over-compensation. 9) Forest insurance business is to be taken care of at the window of insurance com pnies when forest owners buy the privately-owned forest insurance, but the business of writing the publicly-owned forest insurance should be done through the forest cooperatives and certain portions of the premium be reimbursed to the forest cooperatives. 10) Forest insurance funds ought to be reserved by levying a property tax on forest lands. 11) In order to prevent forest damages, the forest owners should be required to report forest hazards immediately to the forest insurance organizations and the latter should bear the responsibility of taking preventive measures.

  • PDF