• Title/Summary/Keyword: 억지말뚝

Search Result 61, Processing Time 0.021 seconds

An Experimental Study on the Stabilizing Effect of Piles against Sliding (사면에 설치된 억지말뚝의 활동억지효과에 대한 실험적 연구)

  • Hong Won-Pyo;Song Young-Suk
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.1
    • /
    • pp.69-80
    • /
    • 2005
  • In order to investigate the stabilizing effect of piles against sliding, a series of model tests were carried out. The model apparatus was designed to perform the model test of slope reinforced by stabilizing piles. The instrumentation system was used to measure the deflection of stabilizing piles during slope failure. The stabilizing effect of the piles in a row with some interval ratio is larger than the isolated pile without interval ratio. Because the prevention force of piles in a row increased due to the soil arching effect between piles during slope failure. Especially, the maximum value of prevention ratio was presented at 0.5 of interval ratio. If the required prevention ratio is 1.1, the interval ratio must be installed from 0.5 to 0.8. Also, the stabilizing effect of piles against sliding is excellent at the interval ratio between 0.5 and 0.8. This value can be proposed as the criterion of the interval ratio between piles against slope failure.

The Behavior of a Cut Slope Stabilized by Use of Piles (억지말뚝으로 보강된 절개사면의 거동)

  • Hong, Won-Pyo;Han, Jung-Geun;Lee, Mun-Gu
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.111-124
    • /
    • 1995
  • On development of mountaneous or hilly area, stability of cut slope should be provided to prevent undesirable landslides. When piles are used as a countermeasure to stabilize existing landslide, stabilities for both piles and slope should be simultaneously satisfied to obtain the whole stability of the slope reinforced by piles. In order to confirm the effect of stabilizing piles on slope stabilization, it is necessary to investigate the behavior of the slope, in which the piles are installed. In this paper, first, the countermeasures used commonly to control unstable slope in Korea were summerized systematically. Nezt, the behavior of piles and slope soil was investigated by instrumentation installed into a cut slope for an apartment stabilized by a row of piles. Instrumentation could present sufficient effect of piles on slope stabilization Construction works in front of the row of piles affected the displacement of piles and slope. The construction works were divided into four stages, i.e. initial cutting stage of slope, excavation stages for retaining wall and parking space, and construction of retaining wall. As the result of research, the applicability of the proposed design method could be confirmed sufficiently.

  • PDF

The Behavior of Stabilizing Piles installed in a Large-Scale Cut Slope (대규모 절개사면에 설치된 억지말뚝의 거동)

  • Song, Young-Suk;Hong, Won-Pyo
    • The Journal of Engineering Geology
    • /
    • v.19 no.2
    • /
    • pp.191-203
    • /
    • 2009
  • The effect of stabilizing piles on cut slopes is checked and the behavior of slope soil and piles are observed throughout the year by field measurements on the large-scale cut slopes. First of all, the behavior of the slope soil was measured by inclinometers during slope modification. Landslides occurred in this area due to the soil cutting for slope modification. The horizontal deformations of slope soil are gradually increased and rapidly decreased at depth of sliding surface. As the result of measuring deformation, the depth of sliding surface below the ground surface can be known. Based on the measuring the depth of the sliding surface, some earth retention system including stabilizing piles were designed and constructed in this slope. To check the stability of the reinforced slope using stabilizing piles, an instrumentation system was installed. As the result of instrumentation, the maximum deflection of piles is measured at the pile head. It is noted that the piles deform like deflection on a cantilever beam. The maximum bending stress of piles is measured at the soil layer. The pile above the soil layer is subjected to lateral earth pressure due to driving force of the slope, while pile below soil layer is subjected to subgrade reaction against pile deflection. The deflection of piles is increased during cutting slope in front of piles for the construction of soil nailing. As a result of research, the effect and applicability of stabilizing piles in large-scale cut slopes could be confirmed sufficiently.

A Study on Seismic Retrofit Design of the Stabilized Piles by 1g Shaking Table Tests and Pseudo-static Analysis (1g 진동대 실험 및 등가정적해석을 이용한 억지말뚝의 사면안정 내진보강 효과 연구)

  • Han, Jin-Tae;Cho, Jong-Suck;Yoo, Min-Taek;Lee, Seung-Hyun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.2
    • /
    • pp.93-101
    • /
    • 2011
  • Korea has about 70% of its land classified as the mountain area, which has led to cut-slope being the result of substantial road and railway construction. However, there is currently a lack of research about the seismic retrofit design of a slope, even though many earthquakes have recently occurred at home and abroad. In this study, in order to investigate the stabilizing effect of piles against sliding during an earthquake, a series of 1 g shaking table tests and pseudo-static analyses were carried out. As a result, the stabilizing effect of piles against sliding during an earthquake was verified by the 1 g shaking table tests and the most effective result from the pseudo-static analyses was that the installation of the piles on the central part of the slope, where the failure surface included piles unlike the lower part and upper part of the slope. Furthermore, when the pile was installed on the central part of the slope, the change of the safety factor depending on the distance between the center of two piles was evaluated.

Evaluation of Pile Spacing Ratio of Stabilizing Piles for Ground Destruction Reduction at the Time of Soft Ground Excavation (연약지반 굴착시 지반파괴 저감을 위한 억지말뚝의 간격비 평가)

  • Kim, Jae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.7
    • /
    • pp.47-56
    • /
    • 2016
  • In the case of excavating ground backfilled with soft ground, ground destruction occurs owing to the discharge of groundwater from excavated back ground in spite of earth retaining wall. To minimize this, indoor model test was implemented applying stabilizing pile as a solution for ground destruction. The unreinforced case was compared with the reinforced case and the comparison demonstrated that the ratio of the gap in settlement of the two cases is about three to one, which proves the reinforcement effect (Kim, 2014). This study has carried out the evaluation of appropriate pile spacing ratio, according to the confirmed effect of stabilizing pile. In the evaluation test the case with pile spacing ratio of 0.66 (5 stabilizing piles) was compared with that of 0.76 (3 stabilizing piles), and it has been shown that applying stabilizing pile has effect on ground destruction reduction, but may rather work as load when pile spacing ratio is narrower than a certain interval. So it was found that adjustment for appropriate pile spacing ratio is required at the stage of design. This study has shown that the pile spacing ratio is appropriate at around 0.7~0.8, which reduces ground destruction and does not function as the load of excavated back ground.

A Study on Applicability of Stabilizing Pile to Foundation Soil of Slope with Various Strength Parameters (사면하부지반의 강도정수에 따른 억지말뚝 적용성 연구)

  • Lee, Seung-Hyun;Jang, In-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.10
    • /
    • pp.331-337
    • /
    • 2016
  • Several foundation soil conditions below a homogeneous sand slope were assumed and slope stability analyses were conducted to determine the soil condition, in which a stabilizing pile can be used to increase the factor of safety against sliding. The assumed heights of the sand slope were 5m and 10m. For a 5m slope height, a stabilizing pile can be used in the foundation soil with a $15^{\circ}$ internal friction angle and a cohesion of 10kPa. For a 10m slope height, a stabilizing pile can be used in the foundation soil with a $20^{\circ}$ internal friction angle and a cohesion of 10kPa and a stabilizing pile can be used in the foundation soil with a $0^{\circ}$ internal friction angle and 40kPa, 45kPa and 50kPa of cohesion. According to the analysis results of stabilizing pile-reinforced foundation soil, the length of the stabilizing pile and magnitude of the maximum bending moment were strongly affected by the internal friction angle of the foundation soil. The lengths of stabilizing pile, for an internal friction angle of $0^{\circ}$ were 4.6, 8.0 times greater than those with an internal friction angle of $5^{\circ}$. The magnitude of the maximum bending moment of the stabilizing pile for an internal friction angle of $0^{\circ}$ was 24.6 times greater than that for an internal friction angle of $5^{\circ}$. Practically, a stabilizing pile cannot be used for foundation soil with an internal friction angle of $0^{\circ}$. Considering the results derived from this study, the effects of a stabilizing pile can be maximized for soft foundation soil that is embanked with a slow construction speed.

Application of Piles to Landslides Control (말뚝을 사용한 산사태 억지공법)

  • 홍원표
    • Geotechnical Engineering
    • /
    • v.7 no.4
    • /
    • pp.75-88
    • /
    • 1991
  • A lot of landslides has occurred in rainy seasons beginning at June through September in Korea, where about 70 percent of the total area is mountaneous. Piles can be used as one of the most useful methods to stabilize such landslides. When a row of piles is installed in soil undergoing lateral movement such as landslides, the soil across the open space between the piles can be retained by the arching action of the soil. For the purpose to establish a reasonable design method for stabilizing piles, a method for stability analysis of the slope containing stabilizing piles is presented, using the theoretical equation of the lateral force acting on the piles in soil undergoing lateral movement. In particular, the theoretical equation is arranged by applying the coefcients of lateral force as a simple equation. And also the differential equations proposed in the previous studies for the pile-stability analysis are modified, assumming that the piles above the sliding surface shall be subjected to the lateral reaction from soil in proportion to the pile deflection. Finally, to investigate the effect of stabilizing piles against landslides, an existing landslide slope in Korea is adopted as an example.

  • PDF

The Use of Piles to Cut Slopes Design in Cohesive Soils (억지말뚝을 이용한 점성토지반 절토사면의 설계)

  • 홍원표;한중근;송영석
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.157-170
    • /
    • 1999
  • A new design technique is presented to stabilize cut slopes in cohesive soils by use of piles. The design method can consider systematically factors such as the gradient and height of slope, the number and position of pile's rows, the interval and stiffness of piles, etc. The design method is established on the basis of the stability analysis of slope with rows of piles. The basic concept applied in the stability analysis is that the soil across the open space between piles can be retained by the arching action of the soil, when a row of piles is installed in soil undergoing lateral movement such as landslides. To obtain the whole stability of slope containing piles, two kinds of analyses for the pile-stability and the slope- stability must be performed simultaneously. An instrumentation system has been installed at a cut slope in cohesive soil, which has been designed according to the presented design process. The behavior of both the piles and the soil across the open space between piles is observed precisely. The result of instrumentation shows that the cut slope has been stabilized by the contribution of stabilizing effect of piles on the slope stability in cohesive soil.

  • PDF

The behavior of a Cut Slope Stabilized by Use of Piles during Heavy Rain (억지말뚝으로 보강된 절개사면의 강우시 거동)

  • Han, Jung-Geun;Hong, Won-Pyo;Sin, Min-Ho
    • Geotechnical Engineering
    • /
    • v.12 no.1
    • /
    • pp.35-46
    • /
    • 1996
  • An instrumentation system is designed to observe the behavior of slope soil and stabilizing piles during heavy rains. Inclinometers, standpipe piezometers and strain gages are installed into a cut slope reinforced by a row .of piles for an apartment. The horizontal deflection and bending stress developed on the piles can be measured, respectively, by the inclinometers and strain gages installed in piles, while the horizontal deformation of the slope soil can be measured by the inclinometer installed in the soil across the open space between piles. The groundwater level doss not grow so sensitively during heavy rain. The behavior of piles and slope is 서footed by the wetting front, since the driving force of slope increases with the weight of slope soil above the wetting front. The stabilizing piles and the slope soil show elastic behavior during heavy rain.

  • PDF