• Title/Summary/Keyword: 압출노즈

Search Result 3, Processing Time 0.018 seconds

Techniques of Optimizing the Launching Nose under Conditions of Minimizing the Launching Bending Moment (압출가설시 발생하는 휨모멘트의 최소화 조건을 통한 압출노즈의 최적설계)

  • Choi, Hang Yong;Suh, Suk Koo;Oh, Myung Seok;Oh, Sae Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.487-495
    • /
    • 2008
  • The behavior of nose-deck system during launch was examined by three dimensionless launching parameters, such as the relative flexural stiffness, the relative nose weight, and the relative nose length. The techniques of optimizing the launching nose were illustrated and equations of relationship between relative nose weight and relative nose length were derived under minimum conditions of the launching negative and positive moment. Equations of maximum positive and negative moment were suggested under the conditions. The optimum design method of the launching nose was proposed in launched continuous girder bridges. It was found that the ideal launching nose was to design that with the relative nose weight of 0.167 and the relative nose length of 0.836 to minimize absolute values of the positive and negative moment during launch.

Temporary Stresses by Applying Construction Methods for Continuous Steel-Concrete Double Composite Box Girder Bridges (이중합성 연속 박스거더교에 대한 가설공법별 발생 단면력 검토)

  • Choi, Hang Yong;Suh, Suk Koo;Oh, Myung Seok;Oh, Sae Hwan;Kim, Hee Sung
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.6
    • /
    • pp.681-693
    • /
    • 2007
  • Construction techniques for continuous steel bridges were applied to steel-concrete double composite box girder bridges. Concrete depth and length at the bottom of the steel box in the negative moment region were determined by plastic moment region and negative moment region of the double composite section, respectively. Construction methods, such as crane lifting method, free cantilever method, and incremental launching method were used for the analysis of the construction stage. Two cases of the construction phase were considered and analyzed for the stress resultant of double composite girders. The behavior of the nose-deck elastic system was examined by three-dimensionless parameters, such as the nose length, the unit weight of the launching nose, and the flexural stiffness of the nose. The adoption of the launching nose has become an effective solution in the incremental launching of steel-concrete double composite box girder bridges.

A Study on Application of GPS for Deflection Management of Curved PCT Girder Bridge under Construction (시공 중 곡선형 PCT 거더교의 처짐 관리를 위한 GPS 적용 연구)

  • Kyu Dal, Lee;Jin Duk, Lee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.33 no.5
    • /
    • pp.453-461
    • /
    • 2015
  • In order to manage the deflection of a curved PCT girder bridge during construction, a GPS receiver was installed at the spot predicted to be the weak point during the incremental launching so as to measure the deflection at each construction stage. The deflections obtained in the experiment were compared with those derived from the monitoring of stress, temperature and inclination. The comparative analysis of the GPS measurement and analytical values obtained from finite element modeling with respect to the launching distance showed that the measured values differ by 0.6 to 1.6 times to the analytical results. This difference could be significantly reduced by thermal calibration. From the analysis of the behavioral pattern of the bridge, deflection occurred during construction in the concrete tip due to the deflection at the head of the nose at the 95m and 75m-spots, and compression and tension developed respectively at the compression weak zone and tension weak zone. The application of GPS appeared to enable more efficient management of the deflection during the erection of the curved PCT girder bridge and is expected to be helpful for the prediction and management of the behavior in future ILM construction sites.