National Fire Safety Code 103 regulates that all operating sprinkler in design area must be discharged 1 bar or more pressure and release 80 lpm or more flow rate as minimum criteria. NFSC103 also provides that the number of operating sprinkler in design area is 10, 20, 30 according to the building classification and the total flow rate is 800, 1,600, 2,400 lpm depending on 80 lpm per sprinkler. If sprinkler system is designed as above provisions, the pressure and the flow rate accordingly become smaller than the minimum criteria about 50 % sprinklers. It results in serious consequence that the purpose of sprinkler system as initial fire reaction equipment is failure. In order to solve these problems, It is desirable that Performance-based fire protection design, hydraulic calculation, is carried out to all sprinkler system.
Journal of rehabilitation welfare engineering & assistive technology
/
v.9
no.3
/
pp.237-243
/
2015
As one of the most widely used assistive technology devices for the disabled in Korea, the powered wheelchair conforms to KS P ISO 7176-5 standard size which uses original version of international standard, ISO 7176-5 without technological modification. However, the international standard is not suitable for the disabled in Korea because it defines the size of wheelchair based on the body size of foreigners, which causes imbalanced posture due to limitation of movement or rotation of pelvis, pressure ulcer incidence due to excessive pressure on the thigh or popliteal space and calf, and safety of reduction due to improper posture. This study suggested the guidance of size for powered wheelchair based on human body size examined by Korean Agency for Technology and Standards, showing a great difference from the size defined in KS P ISO 7176-5 and accordingly redefinition for the size of powered wheelchair is needed.
Journal of the Korea Institute of Information and Communication Engineering
/
v.18
no.6
/
pp.1462-1468
/
2014
Xe gas is moved to target from GPM. It is used to feasible nuclear reaction from proton of 30MeV cyclotron being investigated by the Xe-124 gas target system. This system is divided into four parts. The hardware system was constructed by solidworks 3-D CAD and Helium supply is to cool the Havor foil. The Cooling water has the job of cooling down the temperature when Xe gas is being investigated in the target. Temperature and pressure gauges are attached to be checked easily. GPM has the part that prepares to transport Xe gas. There are storage vessel that stores Xe gas, the cold trap that filters humidity and impurity and lastly storage vessel that temporarily stores Xe gas. HCS using the helium is to clean and cool for each part. These parts are configured with SIEMENS PLC and PcVue monitoring program for more comfortable and easy maintenance.
Journal of the Korea Society of Computer and Information
/
v.8
no.3
/
pp.179-187
/
2003
This study investigate the reasons of organizational failure in detection and appropriate response to risk signal. The Crisis does not come true suddenly, there is some risk signals in crisis. If Organization detect the risk signals the crisis is come true opportunities, if not the crisis is come true disastrous outcome. This is use the system dynamics approach. System Dynamics assume the system as a collection of causal feedback loop, so we understand the dynamics around the problems. This investigate suggest that, the focus on growth is the a kind of promotional pressure and the pressure drive the organization to less attention the risk signal, so the risk is underestimate In proportion to real risk. Ultimate, the organization entrap the promotional climate and insensible to security. This study is a kind of hypothesis-discovering research, in the further study, the discovered hypothesis will be empirically tested.
Lee, Jang Won;Moon, Jong Sung;Kim, Jung Gyu;Sung, Ki Kwang;Kim, Hyun Min
Transactions of the KSME C: Technology and Education
/
v.5
no.2
/
pp.127-134
/
2017
The reactor internals shall be secured in safety and structural integrity under various vibrational loading conditions. Thus, U.S. NRC, Regulatory Guide 1.20 requires the evaluation for the reactor internals due to acoustic induced vibration including the response to the reactor coolant pump pressure pulsation. This paper suggests a methodology to develop an analytical model of the core support barrel accounting for the fluid around the structure and to analyze the responses to the pump pulsation loads using acoustic structure interaction analysis. The analysis results were compared with those of US Palo Verde 1 CVAP and showed a good agreement. Thus, it is expected that the suggested methodology could be an efficient way to evaluate the response of the core support barrel to the pump pulsation loads.
Kim, Min-Ho;Mun, Sang-Don;Kim, Hang-Young;Kim, Tae-Young
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.2
/
pp.605-610
/
2011
Soft ground improvement is essential to enhance strength of ground for construction in reclaimed land or shore. There are many method of soft ground improvement, and vertical drain method was widely used in many countries including korea. As vertical drain method is to plant many Prefabricated Vertical Drains in soft ground, it promotes consolidation and enhances strength. The PBD(Plastci Board Drain) that is excellent economy and workability was widely used in many countries as Prefabricated Vertical Drains. Construction quality of PBD is affected installation depth, pressure, perpendicularity. This paper describes the system developed that can automatically measure installation depth, pressure and perpendicularity for PBD. This system can reduce fraction defective of construction by auto faulty alarm and keeps the safety of operator by auto control system.
The change of material J-R (J-T) curve with crack extension and J-calculation method was investigated to give experimental and analytical method for reliable J-R (J-T) curve, which was adapted recently as a tool for instability analysis of Nuclear Pressure Vessel. Experiments were carried out by Single Specimen Unloading Compliance Method using 1/2"T, Compact-Tension Type fracture mechanic specimens which were the same size and material as domestic nuclear pressure vessel material surveillance specimens. The results revealed that crack extension up to 25~30% of initial uncracked ligament and JD (Deformation theory J) calculation method, currently being used in NUREG-0744, could give rather reliable material J-R (J-T) curve than the small crack extension and JM (Modified J) calculation method. But as JM results more or less higher J at instability, the application of JM should be considered regarding to the problem of power plant availability.lity.
Jo, Jong-Hyun;Lee, Young-Shin;Kim, Yeon-Whan;Jin, Hai Lan
Transactions of the Korean Society of Mechanical Engineers A
/
v.36
no.9
/
pp.1103-1108
/
2012
A main steam pipe system is a branch pipe that connects a boiler with a turbine. Water hammering analysis is very important for limiting the damage caused to pipe systems by operation conditions. Water hammering created by an unsteady flow in pipeline systems can cause excessive change in pressure, vibration, and noise. The main steam pipe structure should be designed to safely maintain the pressure pulsation and several vibrations under operation environments. This study evaluated the structural integrity of a main steam pipe during suspended and normal operation by using the ASME fatigue life methodology and finite element analysis. In the analysis, water hammering was used for transient analysis. The calculated alternating stress and fatigue stress were compared with the applicable limits of ASME fatigue life. All the evaluation results satisfied the requirements of the ASME fatigue life.
This study investigated the pressure difference distribution and the flow characteristics among room, ancillary room, and stair case by carrying out the numerical simulations on the air flow inside the pressurized air supply smoke control system. Numerical simulations were conducted to analyze pressure and velocity distribution of compartments by pressurized air supply for the air-leakage test facility which was built to measure the effective leakage area. In this study, the leakage of air was considered by locating the narrow slit onto fire door and window of room. Simulated results using this method precisely followed the previous experimental results for the pressure differences between the stair case and ancillary room. Predicted results showed that the local leakage of air rarely affected the overall flow pattern and pressure distribution. Although the average velocity over the door between room and ancillary room satisfied the regulation for fire safety, it was certified the unsafe outflow to ancillary room could be occurred in the local position such as the upper part of the door.
The mounted store on an aircraft shall be subjected to an ground separation test to verify that a safe separation has been made before it is actually installed to the aircraft. In this study, ground ejection test was conducted with dummy missile to verify the stability of the drop on the land. Bomb rack unit essential to testing ground ejection test, operate at high pressure and produce a significant ejection force to push the missile away from any large orifice. Bomb rack unit modified their bombe pressure and orifice diameter to photograph the drop movement of dummy missile with high-speed camera and to analyze their drop displacement and speed. It is considered useful to provide the initial data for the ejection force analysis on aircraft with actual flight and to carry out the ground separation tests of aircraft with future developments.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.