As scale of software has been expanded and complicated, it is difficult to detect hazards which induce functional failure of software. Functional failure of safety-critical system (nuclear power plant, air traffic control systems, railway operating system) could result in a disaster (personal injury, environmental pollution). Therefore, it is necessary to conduct a safety analysis for preventing functional failure and increasing safety of the software. However, there are some reasons (time and effort problem, low knowledge of various safety analysis techniques, selecting conventional technique in company, organization) which disturb selecting an apposite one. This paper presents some traditional safety analysis techniques, recently presented techniques and combined models. We expect that it helps stakeholders to choice adequate one for target system.
Proceedings of the Korean Society of Disaster Information Conference
/
2023.11a
/
pp.93-94
/
2023
해체공사는 작업의 특성상 단기간에 이루어지며, 해체공사 현장에 투입되는 근로자는 일용직 근로자가 대부분으로 안전사고의 비율이 높다. 사업장 위험성 평가에 관한 지침에는 위험성 평가시 근로자를 참여토록 하고 있으나 해체현장의 특성상 근로자가 참여한다고 하여도 위험요소를 파악할 역량이 부족할 따름이다. 또한 기존의 해체공사 안전관리 매뉴얼은 구조안전성 확보를 위한 매뉴얼로 해체 근로자의 안전을 위한 매뉴얼은 없는 실정으로, 근로자의 안전을 확보하기 위한 위험성 평가 매뉴얼이 요구되고 있다. 이에 본 연구에서는 건설공사 안전관리 종합정보망(CSI)의 해체 및 철거공사의 사고사례를 분석하였으며, 해체 및 철거 사고시 발생한 주요 위험요소를 도출하여 작업 공종별로 유해·위험요인의 파악을 손 쉽게 할 수 있도록 하였다. 또한 해체 현장 규모에 따라 대규모 현장은 빈도·강도법, 중·소규모 현장은 체크리스트법을 활용하여 위험성을 결정하고 감소대책을 수립할 수 있도록 매뉴얼을 구성하였다. 잔여 위험에 대해서는 관리카드를 만들어 해체공사 완료시까지 관리하도록 하였다.
Proceedings of the Korea Institutes of Information Security and Cryptology Conference
/
2002.11a
/
pp.405-408
/
2002
사전 대응적 안전성은 이동성 공격자에 대해 오랜 기간 안전하게 유지 및 사용되어야 할 암호학적 키들의 안전성을 증가시킨다. 최근에 Shoup은 매우 실제적인 문턱 RSA 서명방식을 제안하였는데, 그의 논문에서는 사전 대응적 안전성에 대해서 고려하지 않았다. 본 논문에서는 Shoup이 제안한 서명방식과 사전 대응적 안전성을 고려하여 이동성 공격자에 강인한 문턱 RSA 서명방식을 제안한다.
얼마 전부터 안전보건경영체제의 시행여부와 관련하여 최근 위험성 평가(Risk Assessme nt)가 각 방면에서 주목을 받고 있다. 우리나라에서는 위험성 평가가 96년부터 공정안전관리(PSM : Process Safety Management nt)가 시행되면서 특히 화학업종을 중심으로 해당 사업장에 적용되어 실시해왔으나 안전보건경영체제에서는 일반업종에도 위험성 평가를 요구하고 있다. 이러한 위험성 쳥가에 관한 국제적인 표준이 ISO 14121 등 여러 가지가 있는데 일본에서는 이미 위험성 평가에 대한 표준 모델을 발표하고 있다. 본 자료에서는 일반 기계기구업종에서의 위험성 평가에 대한 표준모델로서 영국규격 BS8800 부속서D를 일본에서 발표된 모델을 소개 하고자 한다.
Proceedings of the Korea Institutes of Information Security and Cryptology Conference
/
2001.11a
/
pp.20-25
/
2001
블록 암호 알고리즘과 블록 암호의 운영모드 및 메시지 인증 알고리즘에 대한 의사 난수성의 증명은 근래의 암호 분석에서 구조적인 안전성을 증명을 위한 기법으로 커다란 안전성의 평가 방법으로 자리 매김하고 있다. 본 논문에서는 비동기식(W-CDMA) 3세대 이동통신 3GPP에서의 MAC 알고리즘의 안전성을 의사 난수성에 기반한 concrete security 관점에서의 안전성에 대해 알아본다. 즉, 3GPP-MAC 알고리즘의 구조적인 안전성에 대한 증명을 다룬다.
Park, Jiyeon;Kwon, Ji-Hye;Kim, Taehyung;Lee, Jong-Keun
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.454-454
/
2015
본 연구에서는 댐 유역의 설계홍수량을 산정할 시 발생할 수 있는 대표 매개변수의 불확실성에 대하여 분석하였다. 설계홍수량 산정 방법으로는 국내에서 가장 일반적으로 활용되고 있는 강우-유출모형 중 Clark 단위도를 활용하여 확률강우량을 동일 빈도의 홍수량으로 변환하는 방식을 적용하였다. 대상 유역으로는 수문학적 안전성평가가 수행된 국내 댐 유역 중 비교적 실측 호우사상 자료 수가 많은 3개 유역을 선정하였다. 또한 단위도 매개변수 결정 시 자료의 부족으로 최적화 매개변수에 대한 신뢰도 문제가 발생할 수 있으므로 가용 자료수가 증가함에 따른 불확실성의 영향을 분석하기 위해 대상 유역 간의 시간응답 특성을 분석하였다. 이를 통해 상사성이 있는 것으로 판단되는 유역의 호우사상 매개변수를 통합하여 무차원화된 저류상수 $K_x$를 구하였다. 이 $K_x$값을 표준정규분포로 변환하고 Monte Carlo Simulation을 통해 난수를 발생시켜 100개의 무차원 저류상수 $K_x$를 산정하였다. 이 값을 사용하여 설계홍수량을 산정하기 위한 대표 매개변수의 불확실성 분석을 실시하였다. 그 결과 상사성이 있는 것으로 판별된 유역의 호우사상을 통합하는 경우 양질의 호우사상을 다수 확보하고 있는 유역이 추가되면 홍수량 산정결과가 개선되는 것으로 나타났다.
Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
Land and Housing Review
/
v.15
no.2
/
pp.125-137
/
2024
A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.
Journal of the Korea Institute of Building Construction
/
v.19
no.6
/
pp.549-555
/
2019
While efforts to reduce safety accidents in the construction industry have been made in a variety of ways, so far they have had minimal effectiveness. For this reason, since 2016 Design for Safety (DfS) has been implemented as an attempt to eliminate the root cause of safety accidents by introducing the consideration of safety at the design stage. The purpose of this study was to derive the adequacy and problems of Design for Safety and to contribute to reducing safety accidents by establishing this system correctly. A questionnaire survey of related engineers and analysis of the Design for Safety report showed that the awareness of Design for Safety among engineers was low, while some of the risk factors derived from the design for safety were less relevant to the design. As such, efforts should be made to reduce the risk factors in the actual design stage so that it can contribute more to the reduction of safety accidents.
Highway design criteria are considering roadway safety and smooth driving maneuver. However, a certain highway alignment within design criteria often leads drivers to undesirable situation due to the differences between the original intention of design criteria and the unintended result of drivers' cognition. The differences between them often result in traffic accidents. In order to reduce accident process, highway safety facilities are installed on those roadway sections. However, the relationship between highway environments and human factors has not been deeply studied in Korea. In this study. vertical roadway sections are constructed with 3-D graphical tools. This vertical roadway sections are simulated on a driving simulator in order to identify the differences of drivers' cognition on different roadway environments. Based upon the collected data from the driving simulator, canonical correlation analysis and canonical discriminant analysis of quantification theory II have been performed in order to figure out impacting factors on the degree of roadway safety. Also, based upon quantification theory I. the relationship between roadway safety facilities and the degree of safety has been analyzed.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2011.11a
/
pp.156-158
/
2011
2010년 1월부터 발효된 국토해양부의 해상교통안전진단 시행지침에 따라 신설되는 부두 등에 대해서는 계류안전성 평가를 수행하도록 되어있다. 계류안전성 평가 초기 환경 외력 설정 결과가, 최종적인 계류안전성 평가 결과에 어떠한 영향을 미치는지를, 각각의 환경조건을 변화시키면서 검토하였다. Pre-Tension 및 파랑주기, 조류의 방향, 조위 변화 등에 대하여 계류삭에 작용하는 장력 및 QRH(Bollard)의 작용력, Fender의 최대 반력 변화 등의 민감도 분석을 수행하여 계류안전성 최종 결과에 미치는 영향을 검토하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.