• Title/Summary/Keyword: 안전관리시설물

Search Result 552, Processing Time 0.03 seconds

A Study on Updated Object Detection and Extraction of Underground Information (지하정보 변화객체 탐지 및 추출 연구)

  • Kim, Kwangsoo;Lee, Heyung-Sub;Kim, Juwan
    • Journal of Software Assessment and Valuation
    • /
    • v.16 no.2
    • /
    • pp.99-107
    • /
    • 2020
  • An underground integrated map is being built for underground safety management and is being updated periodically. The map update proceeds with the procedure of deleting all previously stored objects and saving newly entered objects. However, even unchanged objects are repeatedly stored, deleted, and stored. That causes the delay of the update time. In this study, in order to shorten the update time of the integrated map, an updated object and an unupdated object are separated, and only updated objects are reflected in the underground integrated map, and a system implementing this technology is described. For the updated object, an object comparison method using the center point of the object is used, and a quad tree is used to improve the search speed. The types of updated objects are classified into addition and deletion using the shape of the object, and change using its attributes. The proposed system consists of update object detection, extraction, conversion, storage, and history management modules. This system has the advantage of being able to update the integrated map about four times faster than the existing method based on the data used in the experiment, and has the advantage that it can be applied to both ground and underground facilities.

Verification of Ground Subsidence Risk Map Based on Underground Cavity Data Using DNN Technique (DNN 기법을 활용한 지하공동 데이터기반의 지반침하 위험 지도 작성)

  • Han Eung Kim;Chang Hun Kim;Tae Geon Kim;Jeong Jun Park
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.2
    • /
    • pp.334-343
    • /
    • 2023
  • Purpose: In this study, the cavity data found through ground cavity exploration was combined with underground facilities to derive a correlation, and the ground subsidence prediction map was verified based on the AI algorithm. Method: The study was conducted in three stages. The stage of data investigation and big data collection related to risk assessment. Data pre-processing steps for AI analysis. And it is the step of verifying the ground subsidence risk prediction map using the AI algorithm. Result: By analyzing the ground subsidence risk prediction map prepared, it was possible to confirm the distribution of risk grades in three stages of emergency, priority, and general for Busanjin-gu and Saha-gu. In addition, by arranging the predicted ground subsidence risk ratings for each section of the road route, it was confirmed that 3 out of 61 sections in Busanjin-gu and 7 out of 68 sections in Sahagu included roads with emergency ratings. Conclusion: Based on the verified ground subsidence risk prediction map, it is possible to provide citizens with a safe road environment by setting the exploration section according to the risk level and conducting investigation.

Application Method of Remote Site Monitoring in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6550-6557
    • /
    • 2013
  • The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.

A Methodology for the Establishment of CityGML Based 3D Drainage Facility Information Model for Runoff Analysis (강우우수 유출해석을 위한 CityGML 기반 3차원 도시 배수시설 정보모델 구축 방안)

  • Lee, Sang-Ho;Jang, Young-Hoon;Kim, Jong Myung
    • Journal of Korean Society of Disaster and Security
    • /
    • v.9 no.2
    • /
    • pp.77-86
    • /
    • 2016
  • In this study, we have created CityGML based 3D information model for drainage facility, manhole and terrain. It conducted analysis of the rainfall-runoff leak through the information model for obtaining interoperability for information integration between city models. The models have advantages to manage the infrastructure information in point of semantic meaning and geometric information by converting the original 2D GIS construction information into the 3D information model. The input values can be automatically generated through the 3D information model of this study, while the values should be entered manually in the conventional method. Also, it can be useful to check the flooding level and related locations by connecting the result of rainfall interpretation and information model.

Developing an Estimation Model for Safety Rating of Road Bridges Using Rule-based Classification Method (규칙 기반 분류 기법을 활용한 도로교량 안전등급 추정 모델 개발)

  • Chung, Sehwan;Lim, Soram;Chi, Seokho
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.29-38
    • /
    • 2016
  • Road bridges are deteriorating gradually, and it is forecasted that the number of road bridges aging over 30 years will increase by more than 3 times of the current number. To maintain road bridges in a safe condition, current safety conditions of the bridges must be estimated for repair or reinforcement. However, budget and professional manpower required to perform in-depth inspections of road bridges are limited. This study proposes an estimation model for safety rating of road bridges by analyzing the data from Facility Management System (FMS) and Yearbook of Road Bridges and Tunnel. These data include basic specifications, year of completion, traffic, safety rating, and others. The distribution of safety rating was imbalanced, indicating 91% of road bridges have safety ratings of A or B. To improve classification performance, five safety ratings were integrated into two classes of G (good, A and B) and P (poor ratings under C). This rearrangement was set because facilities with ratings under C are required to be repaired or reinforced to recover their original functionality. 70% of the original data were used as training data, while the other 30% were used for validation. Data of class P in the training data were oversampled by 3 times, and Repeated Incremental Pruning to Produce Error Reduction (RIPPER) algorithm was used to develop the estimation model. The results of estimation model showed overall accuracy of 84.8%, true positive rate of 67.3%, and 29 classification rule. Year of completion was identified as the most critical factor on affecting lower safety ratings of bridges.

The Effects of HVAC Management on Condensation Cause and Prevention in Indoor Swimming Pools (실내수영장 공조관리 요인이 시설물 결로원인과 예방에 미치는 영향)

  • Sung, Ha-Dong
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.2
    • /
    • pp.9-20
    • /
    • 2018
  • This study is empirically intended to look into the effects of HVAC management on condensation cause and prevention in indoor swimming pools. The findings are summarized as follows. First, the experience of condensation in indoor swimming pools showed that 132 out of 142 people in total experienced the condensation in indoor swimming pools, which they had a high experience rate of 92.3%. For the location of condensation, the wall joints were 46.8% and the windows were 34.5%, which a total of 72.3% occurred in the wall joints and windows. Second, the effect of construction design, HVAC management and building construction on the cause of condensation in indoor swimming pools showed that building construction had an effect on the cause and location of condensation depending on the seasonal time, partially adopting hypothesis 1. Third, the effect of condensation-causing factors on condensation-preventing factors in indoor swimming pools showed that condensation had a close relationship with air and temperature conditions depending on the time and location of condensation, adopting hypothesis 2. As for the above-stated findings, the HVAC management in indoor swimming pools is an important concern factor that continues to cause condensation despite the development of advanced construction materials. Especially, building construction is a main factor that has a direct effect on condensation in the HVAC management of facilities. This implies that the window management is important in maintaining the wall joints - which can suppress the selective use and defect occurrence of construction materials - or confined spaces for a long time.

A Study on the Nature-friendly Management Regarding the User Pattern of Yangjae Stream (양재천의 이용특성을 고려한 환경친화적 관리방안에 관한 연구)

  • Kim Sun-Hee;Hong Suk-Hwan;Bae Jung-Nam
    • Korean Journal of Environment and Ecology
    • /
    • v.18 no.3
    • /
    • pp.306-315
    • /
    • 2004
  • Yangjae stream, stretching through Seocho-gu and Gangnam-gu, is a representative city stream with its environmentally friendly stream makeover project model, launched in 1995. The district of Gangnam-gu, the subject of this study, is under high pressure from the residents for its use as a huge residential areas close to the stream. The study has two main purposes. The first is to identify the condition and characteristic of utilization of Yangjae stream which is currently being increased in use by the stream restoration. Secondly, the study aims to suggest the environment-friendly management to accomplish arrangement of the naturally friendly stream based on the identification survey, The result from the user survey with 303 valid answer sheets show that the people from neighboring residential areas use this stream a lot doing exercising(51.8%) and taking a walk(24.4%) in their free time. Also regular use rate is high, and people are likely to use it alone(30.4%) or as a family(28.4%). With regard to the need of facility increase, even though the respondents required resting places in the shade(80.8%) most, overall, additional introduction of facilities was analyzed as unnecessary(78.8%). safety issue(22.0%) and a lack of convenience facilities(17.6%) and resting places in the shade(16.6%) are pointed as main problems while the users are generally satisfied(59.5%) with the stream. Improving walk-way and planting trees for shade on the slope were designed as a solution for these problems. For securing safety through improvement of walk-way, the scattering of pressure of current walk with building new walk using berms was presented. In order to increase safety on the walk-way(see above figure), the study proposes to build a new walk-way with berms to disperse excessive pressure. It also suggests the tree planting to provide shade in the stream and to make a provision for the planting of forest trees in the current law.

Test-bed Development for Long-term Monitoring of Small Bridge Asset Management (소규모 교량 자산관리를 위한 계측 테스트베드 구축)

  • Park, Jae-Woo;Chae, Myung-Jin;Lee, Giu;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.13-23
    • /
    • 2012
  • While Category 1 and Category 2 bridges are intensively inspected and carefully managed, many small bridges that are not in the Category 1 and 2 are often forgotten until they decay in serious condition. Since many of these small bridges located in the populated city, failure of them would cause huge negative impact on the community. This paper focuses on the small size concrete bridges for timely repair and rehabilitation work for the effective operation and management. Test bed is developed to define the key parameters to forecast the long term performance of the bridges, mostly concrete box bridges. Key parameters suggested in this paper are cumulative fatigue due to repetitive heavy traffic loads and the acid attacks for concrete material deterioration. The cumulative fatigue is measured by the use of the mileage concept. For the long term data collection and inspection, stable and easy to use data collection system is installed as a test bed. The contribution of this research work is on the development of the test bed to define the key parameters of bridge deterioration.

A Study of Long-term Repair Plan for Maintenance of Apartment Housing (공동주택의 유지관리를 위한 장기수선계획에 관한 연구)

  • Han Bum-Jin;Kim Tae-Hui;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.355-358
    • /
    • 2002
  • Since the 1960s, though there were brisk supply in apartment housing, there were no preparation in standard for to extend the life(durability) of apartment housing by maintaining the $social{\cdot}physical$ aspect of apartment housing, and in standard maintenance system. So problem such as facilities safety and residence environment has occurred. Like the condition written above, efficient usage of housing resource by the maintenance of apartment housings in a state of great urgency. In service aspect of apartment housing, establishment of accurate long term repair plan and estimate of repair appropriation fund can prevent housing's fast-deterioration. But to the performers of the maintenance, like house managers and the tenants at the subject building has little awareness of necessity in establishment of accurate long term repair plan and accumulation of repair appropriation fund. Unestablishment of long term repair plan arises problem such as approval of repair appropriation fund's unreasonable accumulation. Hence, for the utmost performance of apartment housing and to extend the economic life of a building, the method of establishment of long term repair plan and estimate of repair appropriation fund on reliable basis is to be proposed.

  • PDF

GIS based Effective Methodology for GAS Accident Management (GIS를 이용한 효율적인 가스사고관리 방법에 관한 연구)

  • 김태일;김계현;전방진;곽태식
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.399-406
    • /
    • 2004
  • 최근 급속한 도시의 팽창과 산업의 발전으로 인하여 가스시설은 급속히 확대되고 있는 실정이다. 이러한 가스시설물의 중요성을 인식하고 많은 도시가스업체에서는 가스관망 시설정보를 전산화하여 항상 최신의 현황을 유지할 수 있는 가스시설물관리시스템을 개발하여 사용하고 있다. 그러나 이러한 시스템은 가스시설물의 현황파악 및 유지관리를 위한 기본적인 기능만을 제공하는 관계로, 가스 누출사고 발생시 정확한 사태의 파악과 함께 신속한 대책 마련을 위한 의사결정 지원이 어려운 실정이다. 따라서 체계적인 가스사고관리를 수행할 수 있는 응용시스템의 필요성이 증대되고 있다. 이러한 시점에서 본 연구에서는 가스사고분석을 신속하고 체계적으로 수행할 수 있는 가스사고관리 적용알고리즘 분석 및 최적의 알고리즘을 정립하여 가스사고관리시스템을 구현하였다. 본 연구를 통한 결과는 1ㆍ2차 차단밸브의 산정이 가능해짐으로써 빈번한 가스 누출사고 발생시 실시간으로 적정대처방안의 제시가 가능하게 되었다. 또한, 누출 최대가스량을 제시함으로써 누출에 대한 피해예상 분석을 위한 정보 제공 및 가스의 신속한 재공급을 위해 필요한 의사결정 지원 정보의 제공이 가능하게 되었다. 아울러, 가스누출사고에 의한 가스공급중단 관로 및 수용가에 대한 속성현황의 파악은 물론 시각적인 도식을 통한 전체적 현황파악이 가능하였다. 이러한 가스사고관리시스템의 개발을 통하여 사고 발생시 신속한 사고방안 제시 및 사고피해의 최소화를 위해 필요한 의사결정 지원 정보의 제공이 가능하게 됨으로써 국민의 안전 및 복지와 도시가스업체의 업무 효율화로 인한 예산절감 효과를 기대할 수 있다. 가시권 분석기능을 이용하여 실제 지형공간상에서 전파경로 손실치를 도시화함으로써 전파관리자가 무선서비스지역 설계, 전파음영지역 판단, 최적 중계기와 기지국 위치 선정에 기여할 것으로 판단된다.하지 않은 지역과 서로 다른 분광특성을 나타내므로 별도의 Segment를 형성하게 된다. 따라서 임상도의 경계선으로부터 획득된 Super-Object의 분광반사 값과 그 안에서 형성된 Sub-Object의 분광반사값의 차이를 이용하여 임상도의 갱신을 위한 변화지역을 탐지하였다.라서 획득한 시추코아에 대해서도 각 연구기관이 전 구간에 대해 동일하게 25%의 소유권을 가지고 있다. ?스굴 시추사업은 2008년까지 수행될 계획이며, 시추작업은 2005년까지 완료될 계획이다. 연구 진행과 관련하여, 공동연구의 명분을 높이고 분석의 효율성을 높이기 위해서 시료채취 및 기초자료 획득은 4개국의 연구원이 모여 공동으로 수행한 후의 결과물을 서로 공유하고, 자세한 전문분야 연구는 각 국의 대표기관이 독립적으로 수행하는 방식을 택하였다 ?스굴에 대한 제1차 시추작업은 2004년 3월 말에 실시하였다. 시추작업 결과, 약 80m의 시추 코아가 성공적으로 회수되어 현재 러시아 이르쿠츠크 지구화학연구소에 보관중이다. 이 시추코아는 2004년 8월 중순경에 4개국 연구팀원들에 의해 공동으로 기재된 후에 분할될 계획이다. 분할된 시료는 국내로 운반되어 다양한 전문분야별 연구에 이용될 것이다. 한편, 제2차 시추작업은 2004년 12월에서 2005년 2월 사이에 실시될 계획이다. 수백만년에 이르는 장기간에 걸쳐 지구환경변화 기록이 보존되어 있는 ?스굴호에 대한

  • PDF