• Title/Summary/Keyword: 심사배점방식

Search Result 5, Processing Time 0.026 seconds

A Model for Deciding Evaluation Weights in Design-Build Delivery Method (일괄입찰방식의 적격심사분이별 배점 결정모델 개발)

  • Kim Man-Chul;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.91-100
    • /
    • 2005
  • Design-build that a single entity performs whole construction process under singular responsibility is one of the project delivery system comes to take expectation effects of time savings, cost saving, and quality assurance. On the other hand, a current domestic method for selecting a design-build contractor is difficult to reflect the purpose of owner and the project characteristics when owner selects the design-build contractor. The purpose of this research is to suggest a model for deciding evaluation weights in design-build which can reflect the purpose of owner and the project characteristics. This research can help owner to select the best suitable design-build contractor for the project.

An Importance Analysis on the Problem of Design Competition of Landscape Architecture (조경설계공모의 문제점 및 요소별 중요도 분석)

  • Lee, Joo-Hee;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.6
    • /
    • pp.62-71
    • /
    • 2013
  • This study is conducted for the purpose of analyzing and contemplating the problems with the competition in current landscape design, with the goal of improving the landscape design competition system by using the AHP technique. The result of this study, first describe the Landscape design competition system that formed the problems and show the most important problem followed by other problems shown in order of importance, which are 'design changes after winning', 'Guidelines for design competition' and 'Landscape design competition manner'. Secondly, in the low rank article make up the level one -From a total 12 elements from the low rank article corresponding in 'process of winner selection' the 'Unprofessional landscape participate the screening' collected comments for the biggest problem, 'lack of expertise in judgement', 'problems with the examination scoring system' and other articles, the corresponding in 'process of winner selection' appears at the highest ranks. It also happens that after making the choice in the landscape design competition, the importance of 'client's design change symptoms' appears high. As a result the overlooked details of the landscape design competition's problems were analyzed. This study has prioritized the problems by problems which landscape design competition institutions most frequently have. Based on this ranking, there is significance purpose to create proactive system improvements in the future. By analyzing these problems, we will be better able to develop improvements to the future system.

Study on the Measure to Encourage ESCO Business for Companies with Core Technology (원천기술 보유업체의 ESCO 사업 참여 유도방안)

  • Lim, Ki Choo
    • Journal of Energy Engineering
    • /
    • v.23 no.1
    • /
    • pp.67-74
    • /
    • 2014
  • The measure to encourage participation of ESCO business for companies with core technology may vary on the conditions of preference policy considerations. Accordingly, the three measures are can be suggested, evaluation points for incentives, loan allocated to a separate, and participation with consortium. This study recommends that the evaluation points for incentives is preferred in the ways. If the assumption that the allocation of large amounts of money, the amount of the loan allocated to a separate may be considered as suboptimal.

An Analysis on the Problems of Design Competition Process of Landscape Architecture by the Delphi Analysis Method (델파이 분석을 통한 조경설계공모 과정의 문제점 분석)

  • Lee, Joo-Hee;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.3
    • /
    • pp.83-93
    • /
    • 2013
  • This study has been performed to analyze and consider the problems after 30 years in terms of landscape design competition process in Korea, so that it can provide the basic data, which can improve the future landscape design competition. We have used Delphi Investigation to carry out a survey that targets professionals and identifies problems. The results are summarized as follows. Firstly, the results of the analysis of Landscape Design Competition for institution theory and case studies showed that there is an issue from four perspectives which are 'method of design competition', 'guidelines for design competition', 'winner selection process', and 'design changes after winning' Secondly, the process by professional Delphi performed expert analysis, and agree with expert opinion. As a result, we derived the problems of a landscape design competition system with the 12 items. Third, in the 'design competition style', two items, the 'design competition style' and 'problem of design public offering period' had become a problem. Fourth, the 'Guidelines for design competition', 'non-hierarchical excess of the amount of instructions', 'directive determined the guidelines', and the 'provision of confusion' three items had also become a problem. Fifth, 'sex expert committee review selection process winning work', 'Problems of participation', 'examination scoring system experts lack', and 'non-landscaping' had become a problem. Sixth, 'The design of the original order' as much as possible 'design changes after the winning work' Four 'order to Comments to reduce the creativity of the design of the climate', 'original extension', 'contractor feedback of excess without the promise of frequent personnel changes', design period of the person in charge is reflected in excess item has become a problem. I considered that a continuous research on the improvement of the problems of the landscape design competition system based on the results must be performed.

A Study on the Improvement of Green Building Certification System and Items in Korea and China - Focused on the Public Facilities - (한·중 녹색건축인증 체계 및 항목 비교를 통한 개선방향 연구 - 공공시설을 중심으로 -)

  • Kim, Jae-Young;Lee, Jong-Kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.17 no.3
    • /
    • pp.9-16
    • /
    • 2018
  • This research is intended to propose future research directions by identifying differences between Korea and China's public facilities at the time of introduction and presenting improvement measures by comparing the criteria for green building certification. The study focuses on the comparison of Korea's G-SEED 2016 and China's ESGB 2014. For data related to green building certification in Korea, refer to the Construction Technology Research Institute Green Building Certification Criteria 2016 v1.2 Guide for New Housing. A study on the Green Building Certification System in China referred to the Green Building Assessment Standards. Comparisons were made between G-SEED 2016 general building certification review criteria and ESGB 2014 public facility certification criteria, and certification methods, essential items and specialties for each area.