Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.