• Title/Summary/Keyword: 실시도면

Search Result 179, Processing Time 0.021 seconds

Checklists for Construction Drawings of Office Buildings based on Working Drawing Analysis (공사용도면 현황분석에 기반한 일반업무시설 실시설계도면 체크리스트 개선방안)

  • Lee, Beom-Koo;Jung, Tae-Hwan;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.3-11
    • /
    • 2010
  • Currently the quality of construction drawings is deteriorated due to restrictions on time costs allowed to the design phase. Moreover shop drawings are arbitrarily produced without the standard criteria, and cleared off after the completion of construction. As a result, the information of produced shop drawings is not feedback to the design phase, and the quality of the construction drawings become worse. This study proposes checklists that include information requested at construction sites and the shop drawings as well as the existing checklists for the construction drawings. The checklists integrate designer's check-items according to breakdown of drawings and contractor's check-items base don construction process. Index matrices of the integrated checklists is developed for practical application of the checklists, and validated through intensive interview with design and construction practitioners.

Analysis the Design Attribution to Assess the Design Quality Based on Detailed Design (실시설계도면 기반 설계속성 도출 및 설계품질평가)

  • Yang, Ji Su;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.3-12
    • /
    • 2016
  • Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.

A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase (실시설계단계 BIM과 도면의 정합성 검토를 위한 체크리스트 개발)

  • Kim, Byeong-Ju;Kim, Yi-Je;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.

Validity Evaluation of Real Time Mobile GIS combined with PDA in University Building Facility Management (대학시설물 관리W떠 PDA기반의 실시간 Mobile GIS 도입 타당성 평가)

  • 정지훈;엄정섭
    • Spatial Information Research
    • /
    • v.11 no.1
    • /
    • pp.41-60
    • /
    • 2003
  • It is noted that the paper mapping system for University Building Facility has many limitations in terms of data maintenance, real-time GIS data acquisition, and economic efficiency. The aim of this research was to evaluate an operational potential of an on site real-time mobile GIS technique to resolve the problem faced in the university. The idea is based upon the recent trends in the field of 'Telecommunication and Information Technology' that uses a PDA (personal Digital Assistants), wireless network computing, mobile computing, etc. A real time mobile GIS approach has been adopted, in which a PDA is linked to a wireless internet and field workers record data on the computer at the site and analyse data on site. While there should be a considerable number and variety of factors associated with real-time mobile GIS quality, this research focuses on three criteria that are identified as fundamental to customer requirements; (1) data quarry (2) spatial analysis (3) real-time GIS database building. 'Art--empirical study for a case study facility has been conducted to confirm the validity for the system. The system has been checked experimentally, enabled the field users to quarry the data required simply and execute spatial analysis (buffer, overlay etc.,) accommodating versatile alternatives on the site. Detailed visual maps can be generated over large areas quickly and easily. The PDA interface, in particular, were ideally suited for field users to interactively displaying positional information with attribute data. This system has shown to be quite convenient to maintaining a highly reliable database since it could playa crucial role in documenting at real-time basis temporal and spatial changes occurred in the facilities. It is anticipated that this research output will greatly serve to introduce the reliable and cost-effective facility mapping system in the university by overcoming serious constraints suffered from the past non-real time mobile GIS approach.

  • PDF

Building of Efficient Route Alignment Information using GSIS -Focused on plan and vertical alignment- (GSIS를 이용한 효율적 도로선형 정보의 구축 - 평면 및 종단선형을 중심으로 -)

  • 강상구;정영동
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.325-333
    • /
    • 2000
  • This paper deals with real time building of route and vertical alignment information system for the efficient and scientific management using GSIS. First, we redesigned route and vertical alignment for obtained basic data using road projector(road design main software). Using by these acquired result, we made a database on road plan and vertical alignment drawing as a basic information being used to construction of road complex information system. The main objectives in this study are the rational maintenance road planing for drawings, its database and the systematization of route information management through the fast updating, mending, supplement. Result of this study enables us to manage route information.

  • PDF

Study on AR/VR Model Generation Techniques Using Piping Isometric Drawing Files (배관 ISO도면 파일 기반 AR/VR모델 생성 기법 연구)

  • Lee, Jung-Min;Lee, Kyung-Ho;Kim, Yang-Ouk;Han, Young-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.19-24
    • /
    • 2021
  • This paper presents a method to generate three-dimensional AR/VR models using the information in Isogen data files (IDFs). An IDF is an output file produced by ISOGEN that contains piping isometric drawings. A piping isometric drawing is used for pipeline installation in the shipyard; therefore, the drawing describes assembly information with symbolic features, not with detailed geometric features. An IDF specifies relationships between piping routes and components with three-dimensional points and tag information as well as the bill of the materials of a pipeline. The key idea of this paper is that AR/VR models can be generated with the piping route points data and piping components tag information in real time, without any conversion of standard data exchange file formats, such as STP, IGES, and SAT. This paper describes IDF data structure and suggests the geometry generation process with IDF data and parametric functions.

Development of Rubber Sheeting System Considering the Change of Base Map (기초도면 변경에 따른 시설물 위치 자동보정 시스템 개발)

  • Lee, Bong-Jae;Geum, Bok-Hui;Jo, Seon-Gu
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.5 no.2
    • /
    • pp.273-282
    • /
    • 1999
  • 범국가적으로 지리정보시스템(GIS : Geographic Information System) 구축작업이 활성화되고 있는가운데 정부에서는 국가정보화 기반조성 차원에서 전국에 걸친 국가기본도 수치지도화 사업을 추진하고 있다. 국가기본도는 설비관리용 GIS를 구축하려는 국내 각 수요기관에서 활용되어져 GIS DB구축작업이 용이해질 것으로 예상되지만, 국가기본도에서는 각 기관에서 관리하고자 하는 모든 설비정보가 포함되어 있는 것은 아니므로 세부적인 관리대상설비의 추가 입력작업이 필요하다. 설비정보 입력은 대체적으로 각 기관에서 자체 보유하고 있는 설비도면을 기준으로 수행되지만 국가기본도와 설비도 간에는 기초 도면에 다름에 따른 설비위치 상대오차가 발생된다. 국가기본도 사용을 전제할 때 이러한 문제점은 피할수 없는 현상이며, 상대위치를 보정시키면서 관리대상 설비를 입력하려면 많은 예산과 인력이 소요될것으로 예상된다. 배전설비관리 GIS를 구축하고자 하는 한전에서는 이를 효과적으로 해결하고자 기초도면 변경에 따른 설비위치 자동보정기법을 연구하여 이를 기반으로한 시스템 개발을 완료하였다. 개발된 시스템의 정확도 및 실용화 가능성을 확인하기 위해 설비위치의 기준이 되는 전력주를 대상으로 샘플지역을 선정하여 자동보정을 실시하였으며, 현장실사를 통한 검증을 실시한 결과 약 94.6%에 달하는 보정 결과 만족도를 얻을 수 있었다.

A Methodology for Digital Cadastre on Large National Estate - Focusing on Cadastral Map Revision - (대규모 국·공유지의 디지털 지적정리 방안 - 지적도면 정비를 중심으로 -)

  • Lee, Won-Hui;Kang, Sang-Gu;Jung, Wan-Suk
    • Journal of Cadastre & Land InformatiX
    • /
    • v.45 no.1
    • /
    • pp.137-150
    • /
    • 2015
  • The methodology on digital cadastre(World Geodetic System Conversion) needs to be specified because the primary target site is discussed for large national estate such as road, river etc. on nationwide. Comprehensively reviews on similar cases and literature reviews to make a methodology for digital cadastre on large national estate, cadastral map revision is required before converting to World Geodetic System. The revisions are on subdivision survey or the other surveys to the necessary area through inspection of geometry and attributes. And the researcher pointed out the need of registration conversion and union of parcel to remove small parcel or to remove the inconsistency of land use type. Basically a systematic maintenance of cadastral map is necessary because the World Geodetic System Conversion unresolved the poor cadastral map quality to digital cadastre on large national estate.

The Development of PDA_based Mapping System Using Totalstation (토털스테이션을 이용한 PDA기반의 매핑시스템 개발)

  • Bae, Sang-Ho;Lee, Young-Geol
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.4 s.34
    • /
    • pp.11-17
    • /
    • 2005
  • This study is to improve the modification of survey data and efficiency of update using digital map based on PDA_based surveying mapping system. This object is achieved by developing wireless communication module of PDA which is adaptable to Totalstation, and contents for its usage. It is achieved by drawing up transformation module of dxf file to editing the text file and the drawing. And it is achieved by drawing up modification module to layer control. This system will be efficiently used to surveying parts of spatial location information for real time mapping ind point positioning in field work.

  • PDF