• Title/Summary/Keyword: 시스템 비용

Search Result 7,617, Processing Time 0.039 seconds

Design and implementation of Voice Transmission System using Open Source Hardware and Event based Non-Blocking I/O Algorithm (오픈소스 하드웨어와 이벤트 기반 논 블로킹 I/O 알고리즘을 활용한 음성송출 시스템 설계 및 구현)

  • Kim, HyungWoo;Lee, Hyun Dong
    • Smart Media Journal
    • /
    • v.9 no.3
    • /
    • pp.116-121
    • /
    • 2020
  • Digital Information Display and KIOSK have a problem that initial introduction cost and maintenance cost due to the development cost of dedicated contents and installation cost are high due to the characteristics of the product. In order to solve these problems, We designed and implemented of voice transmission system using Open Source Hardware and Event based Non-Blocking I/O Algorithm.

Performance Improvement Justification of a Concentrating Photovoltaic(CPV) System over a non-concentrating PV system (비집광형 PV시스템 대비 집광형 PV시스템의 성능 개선 효과 분석)

  • Naveed, Ahmed T;Kang, Eun-Chul;Lee, Eui-Joon
    • Journal of the Korean Solar Energy Society
    • /
    • v.25 no.4
    • /
    • pp.141-153
    • /
    • 2005
  • PV 태양광 발전은 PV 재료가 고가이므로 일반 전력비용에 비해 상대적으로 비용이 높아진다. 저가형 광학 집광기술과 PV를 통합하게 되면, 비용뿐만 아니라 설치면적 등에서 유리하게 되나, 집광기의 단점이 함께 추가되게 된다. 집광기는 작은 수광각과 송신광선을 갖고 있어 PV 모듈에 필요한 태양광, 광학손실의 손실정도를 최소화하기 위한 신중한 시스템 디자인과 2축형 트레킹 장치가 필요하다. 고정식 비집광 시스템보다 더 많은 에너지를 얻기 위해서는 광학시스템의 손실율을 줄이고, 고효율의 PV 모듈을 이용한 PV셀의 상호연결이 필요하다. 본 논문에서는 우선, 비이미지 프레넬 렌즈 집광기를 사용한 PV 시스템에 대하여 간단하게 설명한 후, 출력전력값을 이론적으로 예측하고 PV 효율과 시스템 성능을 제시하였다. 프레넬 렌즈 선형 집광기 통합 PV 시스템과 비집광 PV 모듈의 출력전력값과 시스템 비용을 비교하면, PV 전력비용을 줄일 수 있는 집광기의 이용이 유용한 것을 알 수 있다. 따라서, 집광형 PV 시스템은 미래의 에너지 이용에 매우 유리한 시스템이라 할 수 있다.

Train Operations Scheduling System for Train Time-Table (열차 발착시간에 대한 열차 운용 스케줄링 시스템)

  • 유영훈;황종규;조근식
    • Journal of Intelligence and Information Systems
    • /
    • v.5 no.1
    • /
    • pp.81-93
    • /
    • 1999
  • 열차운용이라 함은 열차의 출발과 도착 시간을 나타내는 열차번호들에 여러 객차들로 구성된 하나의 열차를 일컫는 열차 다이아(train DIAgram)들을 여러 제약조건을 고려하여 배정함으로서 열차 번호가 열차 다이아에 의해 운행될 수 있도록 열차운용 다이아를 작성하는 작업이다. 이러한 작업을 다수의 스케줄링 전문가들이 스케줄링 할 경우 많은 시간과 노력을 감수해야만 하며, 전문가의 실수로 인해 오류가 발생할 가능성이 있다. 뿐만 아니라, 복잡한 스케줄의 특성상 운용 비용이 적게 드는 스케줄 결과를 이끌어 내기가 어렵다. 본 연구에서는 열차운용 시스템을 구성하기 위해서 현재 철도청에서 사용하는 시스템을 분석하여, 열차운용 스케줄링 시스템을 모델링 하였고, 이에 모델링한 시스템을 바탕으로 CSP(Constraint Satisfaction Problems: 제약조건 만족 문제) 해결 기법을 적용하여 계산시간 및 계산 복잡성 면에서 효율적인 스케줄링을 행함과 동시에 비용 최적 함수를 적용함으로서 열차 운용 비용이 최소가 되는 열차운용 스케줄링 시스템을 구현하였다. 더불어, 시스템모델 검증과정의 하나로 과거 운용되었던 새마을호 열차시간표와 열차 데이터를 사용하여 열차 운용 및 운용 비용의 최적화를 실험하였다.

  • PDF

A Study on the Domain Knowledge Development for Software Development Cost Estimation Software Development Cost Estimation in the Defense Information Systems (국방정보시스템 S/W 개발비용 산정 지원용 전문가시스템의 도메인 지식 개발 연구)

  • 김화수;김진환
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2000.10b
    • /
    • pp.39-41
    • /
    • 2000
  • S/W 산업 시대의 국방정보시스템은 대규모화되고 높은 실시간성과 정확성의 요구로 S/W의 복잡성이 증가하고 있으며, 요구되는 기능과 성능이 매우 다양해지고, 사용자의 요구사항도 매우 가변적인 방향으로 발전하고 있다. 본 논문에서는 국방정보시스템의 특성을 명확히 파악하고, 특성에 따라 국방정보시스템 S/W 개발비용 산정에 영향을 미치는 영향요소를 식별한 후, 기존의 '한소협' 모델을 바탕으로 S/W 개발비용 보정계수로 적용할 영향요소와 기능점수를 산정하기 위한 기술적 복잡도 요소로 재분류하였으며, 기존의 '한소협' 모델의 절차와 각종 보정계수의 적용방법을 국방정보시스템에 적합하도록 수정 보완하는 방식으로 국방정보시스템의 S/W 개발비용 산정 지원용 전문가시스템의 도메인 지식을 개발하였으며, 이러한 도메인 지식 개발은 궁극적으로 완벽한 전문가시스템 개발에 밑거름이 될 것이다.

  • PDF

An Analysis of the Operational Cost in the Whole-tree and Cut-to-Length Logging Operation System (전목 및 단목 집재작업시스템에서 작업비용 분석)

  • Kim, Min-Kyu;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.2
    • /
    • pp.229-238
    • /
    • 2013
  • This study was conducted to analyze on the operational cost of logging operations in the whole-tree logging operation system by tower-yarder and swing-yarder, and in the cut-to-length logging operation system by excavator with grapple in order to spread efficient logging operation technique and to establish the logging operation system. In the results of the analysis of operation cost, in case of the whole-tree logging operation system, the operation cost was 2,099 won/$m^3$ in felling by chain saw, 28,286 won/$m^3$ in yarding by tower-yarder, 18,265 won/$m^3$ in yarding by swing-yarder, 18,939 won/$m^3$ in bucking by excavator with grapple and chain saw, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle. In case of the cut-to-length logging operation system, the operation cost was 10,160 won/$m^3$ in felling and bucking by chain saw, 7,567 won/$m^3$ in cut-to-length extraction by excavator with grapple, 6,982 won/$m^3$ in branches and leaves extraction by excavator with grapple, 3,040 won/$m^3$ in the operation road construction by excavator with grapple, 20,484 won/$m^3$ in forwarding and accumulation by wheel type mini-forwarder, 12,701 won/$m^3$ in forwarding and accumulation by excavator with grapple and small forwarding vehicle.

Case Study of a Cost Estimation for the Signal Processor through System Partitioning and Synthesis (시스템 분할과 합성을 이용한 신호처리기의 비용예측에 관한 사례연구)

  • Kim, Jong-Tae
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.2 no.2
    • /
    • pp.109-114
    • /
    • 1999
  • 본 논문에서는 응용 주문형 집적회로 (ASICs)로 구현되는 신호처리기의 비용 예측 방법을 소개한다. 비용 예측은 디자인의 초기 단계에서 다양한 설계 사양들을 비교하여 성능과 비용 면에서 최적의 설계를 찾는데 도움을 준다. 본 비용 예측 방법은 Computer-Aided Design 도구들을 이용하여 시스템 동작 표현으로부터 시작하여 시스템 분할과 상위 수준 합성을 거쳐 레지스터 전송 수춘 단계에서 비용 예측을 실행한다. 사례 연구로 SWIR focal plane으로부터 생성되는 신호를 처리하는 신호처리기의 비용 예측을 실험한다. IBM 1.0 마이크론 기술의 CMOS 표준 셀을 적용하여 실험을 한 결과 각 채널로부터 전달되는 데이터를 실행하기 위해서는 3개의 칩이 필요했다.

  • PDF

A Study on Modeling of Life Cycle Cost for Magnetic Levitation Train (자기부상열차시스템의 수명주기비용 모델링에 관한 연구)

  • Lee, Yun-Seong;Byeon, Yoong-Tae;Kwon, Ki-Ryang;Kim, Jin-O;Kim, Hyung-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.430_431
    • /
    • 2009
  • 철도시스템은 급전, 기계, 전기신호 등의 분야가 결합된 시스템으로 대규모자본을 효율적으로 이용해야만 하는 문제를 안고 있다. 특히, 자기부상열차 시스템은 고도의 기술력이 필요로 하고, 현재 국내에서 개발 단계에 있는 시스템으로 비용 관련 연구가 더욱 필요한 실정이다. 따라서 국외의 철도시스템 및 자기부상열차 시스템에 대한 수명주기비용(Life Cycle Cost, LCC) 연구 동향을 바탕으로 하여 국내의 자기 부상열차 시스템에 적용할 수 있는 수명주기비용에 관한 모델을 제안하고자 한다.

  • PDF

The Maintenance Cost Estimation Model for Information System Maintenance Based on the Operation, Management and Service Metrics (운영·관리 및 서비스 지표에 기반한 정보시스템 유지보수 비용 추정 모델)

  • Lee, Byoung-Chol;Rhew, SungYul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.5
    • /
    • pp.77-85
    • /
    • 2013
  • In this paper, we present the cost measurement metrics for the operation management and service improvement besides the general maintenance. The cost measurement metrics of the operation management and service improvement are based on the metrics that are classified and summarized precedent studies and complemented by empirical measuring indicators, and we propose the maintenance cost estimation model based on this metrics. The maintenance costs can be calculated detailedly, because the proposed metrics can be used selectively, depending on the scope of the information system maintenance. The effectiveness of the proposed maintenance cost measurement metrics and cost estimation model is verified by comparison between existing studies and our research.

그린ICT 융합 S/W 사례: 에너지통합최적 운영시스템 개발

  • Yu, Seong-Min
    • Information and Communications Magazine
    • /
    • v.31 no.7
    • /
    • pp.8-14
    • /
    • 2014
  • 에너지에 대한 수요가 급증하게 되면서 에너지부족문제에 대한 크게 대두되기 시작하였다. 특히 에너지 사용급증은 에너지 부족문제 초래뿐만 아니라 화석사용연료 사용 급증으로 인한 이산화탄소 배출증가 및 에너지 비용증가가 국가적 이슈로 자리잡기 시작하였다. 따라서 이러한 문제를 해결하고자 여러 기관들에서는 에너지관리시스템 개발에 착수하기 시작하였다. 그러나 이러한 시스템은 별도의 관리자 및 운영비용이 들기 때문에 에너지 절감이득에 비하여 비용에 대한 혜택이 없는 중소형 건물 적용에 어려움이 있었다. 따라서 이러한 한계점을 극복하고자 KT 융합기술원에서는 에너지통합운영시스템이 개발하였으며, 중소형 건물에도 적용이 가능하다는 장점이 있다. 본 고에서는 다수의 건물 관리가 가능한 건물통합에너지관리 최적운영시스템 개발에 관하여 다루어 보고자 한다.

분산형 공급체인에서 정보시스템 개선이 주는 영향

  • 김철수;최근영
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2001.12a
    • /
    • pp.37-47
    • /
    • 2001
  • 분산형 공급체인(Supply Chain) 시스템에서 각 기업체의 주문처리 과정에서의 지연은 시스템에게 많은 비용을 발생시키게 된다. 이러한 물질과 정보의 흐름을 효과적으로 관리하는 것이 바로 공급체인관리(SCM: Supply Chain Management)의 기본적인 목적이다. 또한, 항시 존재하는 정보의 지연이 공급체인 내의 여러 기업에 주는 영향이나 SCM에 미치는 효과는 매우 크다. 소매업, 도매업, 물류센터, 제조공장 등으로 이어지는 공급체인에서 정보시스템의 개선 등으로 주문처리 과정이 단축되면 분산형 시스템에서 각 디비젼의 재고량과 비용 면에서 얼마만큼의 변화가 있는지는 연구해 볼 필요가 있다. 이 논문에서는 공급체인 전체를 하나의 통합된 개체로 보고 이를 최적화하고자 하는 경영 방식인 SCM(Supply Chain Management)에서 기업들의 재고변화와 비용 면에서 주문처리 지체가 얼마만큼의 영향이 있는지 알아보며, 두 가지의 정보지연 개선 방안을 가지고 시나리오를 설정하여 30주의 고객 수요를 가지고 실험분석을 한다. 그것을 통해서 SCM(Supply Chain Management)의 비용최소화 전략 수립에 밑바탕이 되는 대안들을 연구결과로 제안한다.

  • PDF