• Title/Summary/Keyword: 시설공사

Search Result 1,074, Processing Time 0.028 seconds

A Study on the Adjustment of Tariff Rates and Construction Fee in Korean District Heating Industry (지역난방사업의 공사비부담금과 열요금 연계조정방안에 관한 연구)

  • Kim, Hyunsook
    • Environmental and Resource Economics Review
    • /
    • v.17 no.3
    • /
    • pp.91-134
    • /
    • 2008
  • Korean district heating companies levy comprehensive construction fee on consumers in the beginning of construction period and the consumers' burden is much higher than those in any other network industries in Korea. It has also many problems such as inappropriate fee calculation method, cross subsidization, property right dispute, etc.. I show that the cut of construction fee by 30% and at the same time, the upward adjustment of tariff rates by 4~6% for 20 years on average will maintain current profitability based on the standard model simulation, I also suggest that fixed charge part of double tariff should be increased to 25% of total tariff and the cut of construction fee should be levied on fixed charge, directly to improve efficiency.

  • PDF

Cost Estimating for Public Facilities at Early Stage Using Functional Area Cost - Focusing on Army Barracks - (공공건축물 계획단계에서의 용도별 공사비 예측에 관한 연구 - 육군 병영생활관을 대상으로 -)

  • Lee, Hyun-Soo;Jung, Myung-Jun;Park, Moon-Seo;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.3-13
    • /
    • 2010
  • The purpose of this research is to develop a conceptual model that establishes a new approach for functional area cost estimating in the schematic design phase. A cost estimating model should consider not only the estimate accuracy, but also the flexibility to the design alternatives and user-oriented serviceability. Therefore, this research uses the method that classifies various facilities of a building according to its functions by analyzing historical data. After setting the functional area as cost parameter, a formula which can estimate functional area cost is derived from statistical analysis. Finally, to validate the proposed conceptual model, it is applied to historical data of a military barrack project. It enables customized space planning reflecting client's needs and compares the cost of various design alternatives as well as improves estimate accuracy.

The Improvement of Delivery System for International Sports Complex Facility (국제종합경기 시설공사 발주방법의 개선 방안)

  • Choi Yong-Ho;Lee Soo-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.107-112
    • /
    • 2005
  • Renovation of existing sports facilities or construction of temporary ones for international complex games requires a wide variety of hundreds of sub construction projects to be awarded at the same time but there are few precedents required regarding the study of tendering process required in such cases. As award of construction contracts to build sports facilities for various international complex games is a critical determinant of fate of international complex games in the initial phase, it is very critical that adequate construction tendering process bedetermined. This research is aimed to study tendering cases for renovation or construction of critical international sports facilities to enhance efficiency of facility construction and define most reasonable tendering approach to satisfy schedule constraints often associated with international complex games and contribute to improvement of international competitiveness of their host cities and propose a direction for further development. This study also provides inputs to subsequent sports events of comparable scale to minimize trial and error.

  • PDF

A Study on Contracting-Out of Busan Port Pier Management Corporation (부산항부두관리공사의 민간화 방안에 관한 연구)

  • Kim, Sang-Goo;Gang, Yun-Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.15 no.3
    • /
    • pp.229-236
    • /
    • 2009
  • This paper intended to find rational alternatives for contracting-out of duties of the Busan port Pier Management Corporation, which is facing the merger and abolition, and of which main functions include the management of port facilities such as International Passenger Terminal, Cruise Terminal and Coast Passenger Terminal. This paper searched appropriate term, needs (merits), proper scope and cost of the contracting-out of that port facilities. The result of the analysis indicated that the best policy is to privatize the Busan port Pier Management Corporation itself to make it an private incorporated company.

  • PDF

Evaluation of Agricultural Water Impacts due to Climate Change of Precipitation (강수의 기후변화로 인한 농업용수 영향 평가)

  • Shin, Hyung Jin;Kim, Hae Do;Lee, Jae Nam;Kang, Seok Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.227-227
    • /
    • 2017
  • "농업 농촌 및 식품산업기본법" 제47조의 2 신설로 기후변화가 농업 농촌에 미치는 영향, 취약성을 5년마다 조사 평가 공표하고 실태조사를 실시하기 위한 법적 근거가 2014년 5월 마련되었다. 지구 온난화 등 기후변화가 농업 농촌에 미치는 영향을 심층적으로 조사 및 분석하여 기후변화에 선제적으로 대응해야 한다. 국가 수자원 총 이용량의 48%가 농업용수로 이용되고 있다. 논면적(964천ha) 수리안전답은 575천ha에 불과하고, 19.4%(187천ha)는 별도 용수공급시설이 없어 자연강우에 의존하고 있으며, 용수공급시설을 갖춘 관개전은 140천ha로 전국 밭면적의 18.5% 수준('15.7월 행정조사)에 그쳐 논에 비해 열악한 수준이다. 기후변화에 대응하여 농업용수의 안정적 공급을 위해 기후변화에 따른 농업용수의 영향분석 및 취약성 평가를 위한 지표 개발이 시급한 실정이다. IPCC에 따르면 기후변화의 영향과 심각성은 수자원, 생태계, 산림, 보건, 농업 및 사회기반시설 등 다양한 분야에서 관측 혹은 전망되고 있는데 특히 가장 취약한 부분은 강수패턴의 변화로 인한 영향이다. 강수패턴의 변화 의미는 강수 공간, 기간 및 강도의 변화를 의미하는 것으로 강수에 민감한 농업분야가 기후에 가장 먼저 영향을 받는다. 본 연구에서는 기후변화 관점에서 강수의 패턴 변화(공간, 강도, 기간)를 분석하여 농업용수에 미치는 영향을 평가하고자 한다.

  • PDF

Development of Multifunctional Storage Tank for Field Agricultural Water (밭지대 용수확보를 위한 다기능 저류조 개발 방안)

  • Shin, Hyung Jin;Park, Chan Gi;Kim, Hae Do;Lee, Jae Nam;Kang, Seok Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.226-226
    • /
    • 2018
  • 고품질 농산물의 수요가 증가함에 농업인의 물관리에 대한 관심 또한 높아져 밭 관개용수에 대한 요구가 늘어나고 있는 실정이다. 밭관개용수 확보는 경제적인 작물로 작목 변환이 가능하고 1모작에서 3모작까지 가능하여 높은 생산성을 확보할 수 있다. 따라서 안정적인 용수 공급을 위해 밭 관개시설의 용수공급을 위한 적정용수 확보 방안 연구가 필요하다. 밭농업의 경우는 과거부터 대부분 지하수를 이용하는 구조로 지금까지 이어져 오고 있다. 밭관개용수 확보 방안을 제시하기 위해 지하수와 지표수의 현황 조사 결과 최근 지하수는 전국적으로 수위가 낮아지고 있으며, 특히 가뭄시 지하수위 저하에 따른 용수공급이 어려울 것으로 예상된다. 지표수는 저수지나 하천에서 취수하여 콘크리트 또는 토공수로를 통해 공급되는 특성상 부유물 유입이 많고 오염원에 쉽게 노출되어 있다. 따라서 양액관개, 점적관개 등 시설농업에 많이 사용되는 첨단농업기술을 접목한 용수장치에 적용하기에는 부적합하므로 이에 따른 대처가 필요하다. 수질오염이 심각한 지역은 간이 정수장 설치?운영을 필요하며 기존의 정수처리방법은 비용이 상당히 많이 소요되기 때문에 경쟁력이 떨어지므로 저비용의 시설용수공급시스템 개발이 요구된다. 본 연구에서는 밭지대 용수확보를 위한 방안으로 지표수를 이용한 저류조 공급을 제안하고 아울러 수질문제를 해결하기 위한 저류조에 여과장치를 통한 수질 개선 및 수온 유지를 통한 열선처리를 적용한 다기능 저류조를 개발을 연구하고자 한다.

  • PDF

'기반시설부담금에 관한 법률'의 시행 방안을 마련하기 위한 공청회

  • Lee, Eun-Suk
    • 주택과사람들
    • /
    • s.192
    • /
    • pp.78-79
    • /
    • 2006
  • 기반시설부담금에 관한 법률의 시행방안 마련을 위한 공청회가 개최됐다. 대한국토도시계획학회와 한국토지공사가 공동 주최한 이번 공청회는 기반시설부담금 산정의 주요 내용인 용지환산계수, 건축물별 기반시설 유발계수 등 연구 결과를 발표하는 시간으로 진행됐다.

  • PDF

최초의 민자발전소 건설공사

  • Hwang, Jeong-Du
    • 열병합발전
    • /
    • s.22
    • /
    • pp.24-28
    • /
    • 2001
  • 국내 최초의 LG민자발전소에 대해 건설공사 이전인 사업추진 초창기부터 종합 준공시까지 직간접으로 6년여 동안 참여했다. 그동안 민자발전이 종합 준공되기까지의 추진경위 및 진행 현황과 발전소 주요시설에 대해 개략적인 사항을 소개하고자 하며, 후속기 건설공사 추진도 멀지않은 장래에 성공적으로 추진될 것으로 보인다.

  • PDF