• Title/Summary/Keyword: 시설계약

Search Result 122, Processing Time 0.025 seconds

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

Influencing Factors Analysis for the Number of Participants in Public Contracts Using Big Data (빅데이터를 활용한 공공계약의 입찰참가자수 영향요인 분석)

  • Choi, Tae-Hong;Lee, Kyung-Hee;Cho, Wan-Sup
    • The Journal of Bigdata
    • /
    • v.3 no.2
    • /
    • pp.87-99
    • /
    • 2018
  • This study analyze the factors affecting the number of bidders in public contracts by collecting contract data such as purchase of goods, service and facility construction through KONEPS among various forms of public contracts. The reason why the number of bidders is important in public contracts is that it can be a minimum criterion for judging whether to enter into a rational contract through fair competition and is closely related to the budget reduction of the ordering organization or the profitability of the bidders. The purpose of this study is to analyze the factors that determine the participation of bidders in public contracts and to present the problems and policy implications of bidders' participation in public contracts. This research distinguishes the existing sampling based research by analyzing and analyzing many contracts such as purchasing, service and facility construction of 4.35 million items in which 50,000 public institutions have been placed as national markets and 300,000 individual companies and corporations participated. As a research model, the number of announcement days, budget amount, contract method and winning bid is used as independent variables and the number of bidders is used as a dependent variable. Big data and multidimensional analysis techniques are used for survey analysis. The conclusions are as follows: First, the larger the budget amount of public works projects, the smaller the number of participants. Second, in the contract method, restricted competition has more participants than general competition. Third, the duration of bidding notice did not significantly affect the number of bidders. Fourth, in the winning bid method, the qualification examination bidding system has more bidders than the lowest bidding system.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

건설정책(3) - 아파트도 에너지 다이어트 시대 개막

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.244
    • /
    • pp.30-35
    • /
    • 2010
  • 노후 아파트에 대한 ESCO(에너지절약 전문기업) 사업이 본격화된다. 또한 아파트 ESCO 사업을 발주할 때 정부의 정책자금이 지원되는 사업에 대해서는 국가계약법을 적용한다. 정부는 노후 아파트를 대상으로 고효율 난방시설과 LED를 설치하고 대기전력 차단장치를 보급하는 내용의 '아파트 ESCO 시범사업'을 내년부터 본격 추진한다고 밝혔다.

  • PDF

월간닭고기

  • 한국계육협회
    • Monthly Korean Chicken
    • /
    • v.3 no.1 s.19
    • /
    • pp.2-8
    • /
    • 1997
  • 도계장 소송용기 세척, 소독시설 지원사업 추진 - 닭고기 외식브랜드 해외진출 활발 - 닭고기 가격조사 발표 - 인도, 닭고기소비 급신장 최근 3년 $35{\%}$늘어 - 식품위해요소 중점관리제 도입 - 연말 닭고기 랜더링처리 - 배합료 영세율 법인은 제외 - 자외선 이용 종란 살모넬라 제거 - 지난해 1인당 육류소비량 29Kg 국내산육류 유해성 잔류물질 검사 - 계열주체, 96년에 $68{\%}$ 계약생산 - 육류중 유해성 잔류물질 공동조사

  • PDF

건설소식

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.5 s.190
    • /
    • pp.86-91
    • /
    • 2006
  • 현장 환경관리조직 설치 의무화/전문건설업계 유동성 개선/건설현장에 부실벌점 주의보/하도급 위반 중복처벌 못한다/공사 견적능력을 높여라/해외플랜트 수주 1분기 63억달러/초중고 74교 14건으로 번들링/조달청,공사계약팀 시설총괄팀으로 개명

  • PDF

안전성 확보 살균 계란 홍콩 수출 교두보 마련...

  • Gi, Yeong-Hun
    • KOREAN POULTRY JOURNAL
    • /
    • v.38 no.4 s.438
    • /
    • pp.104-106
    • /
    • 2006
  • 국제 양계시장은 동남아뿐만 아니라 유럽 국가 등 전 세계적으로 조류인플루엔자가 확산되면서 각국에서 양계산물이 수입을 중단하는 등 시장교류 절차가 강화되고 있으며 감역국의 소비시장 또한 위축되고 있다. 그러나 이런 위기 상황 속에서도 한국의 한 중소기업이 저온살균계란이라는 첨단 기술을 개발하여 안전한 살균 계란을 생산하게 되었으며 이 기술과 생산 시설을 홍콩에 수출을 계약하면서 업계에 비상한 관심을 모으고 있다.

  • PDF

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

독일 해군의 차세대 212급 잠수함

  • Lee, Gi-Seon
    • Defense and Technology
    • /
    • no.7 s.233
    • /
    • pp.60-69
    • /
    • 1998
  • 독일 HDW조선소의 Bonn 지사장으로 근무중인 Udo Ude씨는 209급 잠수함 해외수출 성공사례를 다음과 같이 분석하였다. -1970년 독일해군용 206급 계약시 잠수함을 해군에 인도하기 전까지의 모든 과정을 조선소가 직접 책임지고 수행토록 하는 General Contractor Principle(총괄계약자 원칙)에 의해 확보된 기술인력, 자재/장비 공급원 발굴, 축적된 장비간 연동과 체계통합 기술 및 경험 –대부분의 탑재 장비를 국내 방산업체로부터 조달할 수 있는 탄탄한 국내 기술력 –매 신규사업마다 성능향상을 위한 과제선정 및 계속적인 연구 –정부 소유 시험시설 및 장비 활용과 제반 기술관리에 있어서 민.관.군의 적극적이고 긴밀한 지원체제 구축 이러한 성공사례 분석에 독일 현지에서 느낀 필자의 경험소감을 추가하면 다음과 같다. –규정을 잘 지킬 뿐만 아니라 타인의 잘못을 즉시 일깨워 주는 준법정신 및 고발정신 -2-3년 후의 휴가계획까지 수립하여 준비할 정도의 처절한 사전계획 및 준비정신 –불결한 것과 게으름을 참지 못하는 청결성 및 근면성 –누구든지 원하면 경제적인 부담없이 평생동안 공부할 수 있는 교육제도 –게르만족이 우월하다는 내면적 자부심 –작은 일이라도 모여서 토의하고 결론을 도출하기 좋아하는 공동체 의식 –약속을 철저히 지키는 정직성 –과거의 사실이나 유물을 철저히 보존하는 역사의식 –모든 분야에서 철저하게 운용되는 Meister(장인)제도 등

  • PDF

A Study on integration methodology for linking between the Owners' system and KONEPS in Public Construction Project (공공건설사업에서 발주청 내부시스템과 국가종합전자조달시스템간의 연계 방안 연구)

  • Kim, Seong-Jin;Kim, Nam-Gon
    • Annual Conference of KIPS
    • /
    • 2012.04a
    • /
    • pp.1352-1353
    • /
    • 2012
  • 본 연구는 지방국토관리청의 시설공사의 계약 체결과 기성 준공금 지급 업무를 대상으로 발주청 내부시스템과 국가종합전자조달시스템간의 연계를 위한 업무절차 개선방안을 마련하고 관련 기능을 개발함으로서 건설사의 계약 및 기성 업무처리의 효율성을 제고하고자 한다.