• Title/Summary/Keyword: 시공 품질 관리

Search Result 496, Processing Time 0.027 seconds

A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling (터널근접시공에 의한 말뚝의 거동을 고려한 플랫폼 기반의 예비 설계 가이드라인에 대한 연구)

  • Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.129-151
    • /
    • 2022
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of piles when the adjacent tunnelling passes underneath grouped piles with a reinforced pile cap. In the current study, the numerical analysis studied the computed results regarding the ground reinforcement condition between the tunnel and pile foundation. In addition, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the relative displacements have been thoroughly analysed, and the IoT platform based preliminary design guidelines were also presented. The pile head settlements of the nearest pile from the tunnel without the ground reinforcement increased by about 70% compared to the farthest pile from the tunnel with the maximum level of reinforcement. The quality management factor data of the piles were provided as API (Application Programming Interface) of various forms by the collection and refinement. Hence it has been shown that it would be important to provide the appropriate API by defining the each of data flow process when the data were created. The behaviour of the grouped piles with the pile cap, depending on the amount of ground reinforcement, has been extensively analysed, and the IoT platform regarding the quality management of piles has been suggested.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

Studies on the Roadside Revegetation and Landscape Reconstruction Measures (도로녹화(道路綠化) 및 도로조경기술개발(道路造景技術開発)에 관(関)한 연구(硏究))

  • Woo, Bo Myeong;Son, Doo Sik
    • Journal of Korean Society of Forest Science
    • /
    • v.48 no.1
    • /
    • pp.1-24
    • /
    • 1980
  • One of the most important basic problems for developing the new techniques in the field of road landscape planting practices in Korea, is to clarify, analyse, and evaluate the existing technical level through actual field survey on the various kinds of planting techniques. This study is, therefore, aimed at the good grasp of detail essences of the existing level of road landscape planting techniques through field investigations of the executed sites. In this study, emphasized efforts are made to the detail analysis and systematic rearrangements of such main subjects as; 1) principles and functions of the road landscape planting techniques; 2) essential elements in planning of it; 3) advanced practices in execution of planting of it; 4) and improved methods in maintenance of plants and lands as an entire system of road landscape planting techniques. The road landscape planting techniques could be explained as the planting and landscaping practices to improve the road function through introduction of plants (green-environment) on and around the roads. The importances of these techniques have been recognized by the landscape architects and road engineers, and they also emphasize not on]y the establishment of road landscape features but also conservation of human's life environment by planting of suitable trees, shrubs, and other vegetations around the roads. It is essentially required to improve the present p]anting practices for establishment of the beautiful road landscape features, specially in planning, design, execution, establishment, and maintenance of plantings of the environmental conservation belts, roadside trees, footpathes, median strips, traffic islands, interchanges, rest areas, and including the adjoining route roads.

  • PDF

Quality Grading of Concrete Soil Erosion Control Dam in the Aspect of Unconfined Concrete Strength by Surface-Wave Technique (표면파 기법에 의한 콘크리트 사방댐의 콘크리트 강도 등급 평가)

  • Lee, Chang-Woo;Joh, Sung-Ho;Park, Ki-Hyung;Kim, Min-Sik;Yoon, Ho-Joong;Raja Ahmad, Raja Hassanul
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.3
    • /
    • pp.412-425
    • /
    • 2012
  • Concrete Soil Erosion Control Dam, which blocks flow of debris flow in torrential stream, are reported to lose expected functions due to structural failure and collapses, caused by poor construction, material deterioration and external impacts. In this paper, an integrity assessment technique for debris barriers was proposed, which allows preliminary detection of problems inherent in debris barriers. The proposed integrity assessment technique is a non-destructive method based on SASW method, one of surface-wave tests. In this paper, a practical procedure and analysis guidelines in applying the SASW technique to debris barrier was proposed and its validity was verified using five decrepit debris barriers older than 20-year old. As a result, the SASW method was validated for the reliable grade evaluation method for concrete soil erosion control dam, and the resulting grades turned out to agree with the results determined by Sabang Associations.

An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - (비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 -)

  • Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.38-46
    • /
    • 2014
  • The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity.

Progress Measurement of Structural Frame Construction using Point Cloud Data (포인트 클라우드 데이터를 활용한 골조공사 진도측정 연구)

  • Kim, Ju-Yong;Kim, Sanghee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.37-46
    • /
    • 2024
  • Recently, 3D laser scanning technology, which can collect accurate and quick information on phenomena, has been attracting attention among smart construction technologies. 3D laser scanning technology can obtain information most similar to reality at construction sites. In this study, we would like to apply a new member identification method to an actual building and present the possibility of applying point cloud data, which can be collected using 3D laser scanning technology, to measuring progress at construction sites. In order to carry out the research, we collected location information for component identification from BIM, set a recognition margin for the collected location information, and proceeded to identify the components that make up the building from point cloud data. Research results We confirmed that the columns, beams, walls, and slabs that make up a building can be identified from point cloud data. The identification results can be used to confirm all the parts that have been completed in the actual building, and can be used in conjunction with the unit price of each part in the project BOQ for prefabricated calculations. In addition, the point cloud data obtained through research can be used as accurate data for quality control monitoring of construction sites and building maintenance management. The research results can contribute to improving the timeliness and accuracy of construction information used in future project applications.

Improvement of the Design and Construction Technique of Orthotropic Steel Deck Bridges : Fatigue Strength of Three Dimensional Full-scaled Model (강바닥판교의 설계 및 시공성 향상방안 : 강바닥판교 3차원 실물 모형체의 피로강도)

  • Oh, Soon Taek
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.1
    • /
    • pp.23-32
    • /
    • 2006
  • This study was conducted to improve the design and construction technique of orthotropic steel-deck bridges. After conducting an F.E.M. analysis of the various rib types of the connection details, static and fatigue tests were conducted, using a three-dimensional, full-scaled, orthotropic, steel-deck-plate model with internal diaphrams, to check the fatigue strength depending on the types of details. The model structure was made of two types of longitudinal ribs: the domestic standard and the European rabbit types. The fatigue strength of the steel-deck system was found to have improved through the installation of an internal diaphram, as no cracks were found on the bottom round part of the scallop with a diaphram. There were no differences between the domestic and the European types of details in terms of strength may be partially influenced by the shape of the scallop and by the installation of an internal diaphram, but it can be improved more significantly according to the quality of the welding that will be done.

Experimental Study on Structural Behavior of Joints for Precast Concrete Segment (프리캐스트 콘크리트 세그먼트 접합부의 구조거동에 관한 실험적 연구)

  • Lee, Young-Hak;Kim, Min-Sook;Jung, Bo-Na;Kim, Hee-Cheul;Kim, Kwan-Soo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.13 no.6
    • /
    • pp.59-65
    • /
    • 2009
  • The use of precast concrete segments facilitates quality control and reduces construction cost and period. However, as a construction method it has limited applicability, for it demonstrates structurally disadvantageous behaviors due to stress concentration and large displacement in the joint of assembled segments. This paper proposes a precast segment joint with improved structural performance, and experimentally assesses the structural performance of the proposed joint in terms of crack and failure modes, deformation, maximum load and displacement ductility. In consideration of constructability and structural performance, this paper suggests different types of joint with shear key, post tension and steel rods as variables, and performs a static loading test on them. The test results show that the performance of SGSP specimens is around 84% that of a monolithic specimen in terms of the maximum load, while their ductility behaviors are better than the monolithic specimen. This result confirms the improved structural performance and applicability of the proposed joint.

IFC-based Data Structure Design for Web Visualization (IFC 기반 웹 가시화를 위한 데이터 구조 설계)

  • Lee, Daejin;Choi, Wonik
    • Journal of KIISE
    • /
    • v.44 no.3
    • /
    • pp.332-337
    • /
    • 2017
  • When using IFC data consisting of STEP schema based on the EXPRESS language, it is not easy for collaborating project stakeholders to share BIM modeling shape information. The IFC viewer application must be installed on the desktop PC to review the BIM modeling shape information defined within the IFC, because the IFC viewer application not only parse STEP structure information model but also process the 3D feature construction for a 3D visualization. Therefore, we propose a lightweight data structure design for web visualization by parsing IFC data and constructing 3D modeling data. Our experimental results show the weight reduction of IFC data is about 40% of original file size and the web visualization is able to see the same quality with all web browsers which support WebGL on PCs and smartphones. If applied research is conducted about the web visualization based on IFC data of the last construction phase, it could be utilized in various fields ranging from the facility maintenance to indoor location-based services.

The Analysis of Skin Friction on Small-scale Prebored and Precast Piles Considering Cement Milk Influence (시멘트풀의 영향을 고려한 축소모형 매입말뚝의 거동분석)

  • Park, Jong-Jeon;Jung, Gyung-Ja;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.1
    • /
    • pp.5-15
    • /
    • 2017
  • Skin friction may be one of the most critical factors in designing the prebored and precast pile. Special attention was given to the interface behavior of cement milk-surrounding soil during the installation of prebored and precast pile. Small-scale field model pile test was conducted for the case of single pile. The size and geometry of the small-scale field model piles were designed with pile length 1.3m, boring diameter 0.067 m. Quick maintain-load test was conducted for the cases of boring diameter 150, 125, 90, 86, 74 mm and water-cement ratio 90, 70, 60%. It was shown that the bearing capacity of the pile increased as the cement-water ratio and cement milk thickness increased. Considering the scale effect between the small-scale model test and the actual construction site, it was found that cement milk thickness of 0.1~0.4D (50~200 mm) was reasonable for the stability of the structure. Also, the proper cement paste water / cement ratio was about 70% when considering the results of this study and quality control.