Risk Management for Environment Protection in Job Site Utilizing BIM Method (BIM을 활용한 현장시공의 친환경 위험관리에 관한 연구)

  • Li, Teng;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.111-114
    • /
    • 2010
  • With the rise of green technology, the environmental question causes people’s attention more and more, based on objective of the sustainable development, the green risk has already begun to appear. In the paper the definition of the green risk of construction project is given, it analyzes and identifies the green risk of construction project from three aspects, based on BIM, the relation with green risk was found. Though the relation, the management of green risk was analyzed and we may take some measures to reduce the unnecessary risk and waste.

  • PDF

도로안정성을 고려한 친환경적 터널 갱문 설계 및 시공사례

  • Wi, Yong-Gon;Kim, Do-Hyeong;Kim, Yeong-Geun;Kim, Il-Hwan;Gwon, Jae-Seok;Lee, Won-U
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2004.04a
    • /
    • pp.199-217
    • /
    • 2004
  • 터널 설계에 있어 갱구부의 위치 및 갱문형식의 선정은 터널 및 갱구사면의 안정성뿐만 아니라, 주위환경과의 조화 및 자연환경 훼손 최소화 등과 같은 환경적인 측면에서도 매우 중요한 부분이다. 현행 국내의 경우 경제성과 시공성 위주의 갱구부 위치 선정으로 과다 절취구간이 발생되어 환경훼손, 민원문제 발생, 과다한 용지 매입비용 등의 여러 가지 부작용이 발생되고 있다. 또한, 갱문 형식의 선정에 있어서 갱구부의 지형여건 및 제반 환경적 영향을 고려하지 않고 원통절개형과 면벽식 갱문의 획일적인 적용으로 주변지형과의 부조화를 이루는 사례가 다수 발생하고 있으며, 갱구부 상단의 유실된 토석이 완충공간의 부족으로 도로 노면상에 낙하되는 사고가 발생하고 있어 그에 대한 대책이 필요한 실정이다. 이와 같은 문제점을 보완하기 위해 갱구부 절취구간 최소화를 위한 구체적인 최소토피고 기준을 마련하였으며, 갱구상단 지형경사의 완급, 갱문주위의 배수기능, 낙석${\cdot}$산사태 등의 발생가능성 등을 고려한 새로운 갱문형식을 제안하고 체계적인 검토를 수행하였다. 이를 통해 점차 강화되는 환경보호정책 방향에 부응하고 자연환경 훼손을 최소화하며, 특히 해빙기와 집중호우시 낙석${\cdot}$눈사태로부터 도로의 안전을 확보할 수 있는 터널 갱문부 설계기준을 제시하였다. 또한, 실제 고속도로 터널의 설계 적용사례를 통하여 본 설계기준의 적용성을 분석하였으며, 실제 갱문 시공사례를 소개하여 향후 설계 및 시공에 도움이 되고자 하였다.

  • PDF

해저지반 굴삭용 워터젯 장비의 시공성능 추정에 관한 기초적 연구

  • Na, Gyeong-Won;Jo, Hyo-Je;Baek, Dong-Il;Hwang, Jae-Hyeok;Han, Seong-Hun;Jang, Min-Seok;Kim, Jae-Hui
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.15-16
    • /
    • 2015
  • 해저파이프라인 및 해저케이블 설치해역이 대수심으로 이동함에 따라 육지와는 다른 열악한 시공 환경에 놓이게 된다. 이때 파이프라인 및 케이블이 매설되는 해저지반 상태와 작업이 이루어지는 해역의 해상조건 등은 작업효율에 영향을 미치기 때문에 효율적인 시공이 필요하다. 본 논문은 구조물 매설에 앞서 해저지반 굴삭 작업을 수행하기 위해 ROV 트렌쳐의 하단에 장착되는 워터젯 굴삭기의 작업효율 및 시공성능 추정에 관한 연구이다. 먼저 전산유체해석을 통해 워터젯 굴삭기의 굴삭효율을 극대화할 수 있는 노즐 수량을 정하였고, 모형실험을 수행하여 굴삭기의 시공성능을 예측할 수 있는 최대 굴삭심도 및 최대 굴삭속도를 파악하였다. 이를 바탕으로 실제 운용중인 워터젯 굴삭장비들과 시공성능을 비교 분석하였다.

  • PDF

극한지 배관 설계 및 시공 기술 현황

  • Kim, U-Sik
    • Journal of the KSME
    • /
    • v.54 no.1
    • /
    • pp.53-57
    • /
    • 2014
  • 극한지 자원을 이송하기 위한 가장 안전하고 효율적인 방안은 배관이다. 국내 배관과 다른 환경인 극한지에서 자원이송배관을 설계, 시공에 필요한 기술의 현황을 소개하고자 한다.

  • PDF

Prediction of the Suitable Area on Erosion Control Dam by Sediment Discharge in Small Forest Catchments (산림소유역 토사유출량에 의한 사방댐 시공적지 예측기법 개발)

  • Lee, Sung-Jae;Kim, Seon-Jeong;Lee, Eun-Jai;Ma, Ho-Seop
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.4
    • /
    • pp.438-445
    • /
    • 2020
  • The characteristics of forest environmental factors were analyzed using the quantification theory (I) for prediction of the suitable area of erosion control dams. The results indicated that sediment discharge in small forest catchments was significantly correlated with dredging passage (0.7495) and age class (0.6000). In contrast, area (0.3416), slope gradient (0.3207), rainfall (0.3160), altitude (0.2990) and soil type (0.2192) were poorly correlated. Following quantification theory (I), we developed a selection decision table for erosion control dams based on sediment discharge rate as class I (highly suitable site, greater than 2.2496), class II (suitable site, 1.1248~2.2495), and class III (poorly suited site, lower than 1.1247).

A Study on the Determination of Construction Method of Screw Concrete Piles for Noise & Vibration-Free (무소음・무진동을 위한 스크류콘크리트말뚝의 시공법설정에 관한 연구)

  • Choi, Yongkyu;Kim, Dongchul;Kim, Sungsu;Nam, Moonseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.7
    • /
    • pp.15-24
    • /
    • 2010
  • Noise and vibration due to pile driving cause residents nearby construction sites to file civil complaints and to the extent of bringing construction to a halt. To deal with this issue, construction engineers have worked strenuously to develop several types of low noise & low vibration pile methods. In this study, a new noise and vibration-free precast screw pile method proposed as a low noise & low vibration pile. It penetrates into the ground by rotating and pressing to avert noise and vibration while maximizing bearing capacity. A prototype of noise and vibration-free precast screw pile method was manufactured, which is not seen anywhere in Korea and elsewhere, and have undergone pilot tests twice to determine construction method. Based on this study, features of the noise & vibration-free screw pile method, production of screw concrete pile prototype, two pilot tests and subsequent construction method were determined.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.