A Study on the Task Variation and Social Network Analysis in the Construction Process (시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구)

  • Park, Yoona;Lee, Dongdeok;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.105-113
    • /
    • 2019
  • A construction project is a complex process consisting of interdependent tasks. If one task has variation, other tasks will be affected additionally and it is difficult to reach consensus on task variation due to the characteristics of the construction site that is going on quickly and complicatedly. Therefore, this study identified the root cause of task variation in construction process. Adjacent matrix was created with the tasks corresponding to major causes of variation, and the network analysis was performed. The results of social network analysis in the construction process can stabilize the work flow in the complex process and improve the reliability of the process plan and the project performance.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

Development of Design Process Management Model using Dependency Structure Matrix for Constructability (시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발)

  • Park, Moon-Seo;Ham, Young-Jib;Lee, Hyun-Soo;Kim, Woo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.65-74
    • /
    • 2010
  • The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

Improvement of architectural engineering design education process through an analysis of BIM courses (국내 BIM 교육과정 분석을 통한 건축공학 설계교육 프로세스 개선)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.145-153
    • /
    • 2010
  • Public institutions and owners have been introduced to Building Information Modeling (BIM) tools. BIM has become an important factor in the design process in undergrad programs. The purpose of this study is to demonstrate the improvement of the architectural engineering design process through an analysis of BIM courses. BIM education courses are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM in the introduction of an integrated design process. An architectural engineering design process needs to be based on understanding design, building structures, construction and building services. 3D Modeling helps support an understanding of building structure and eco-friendly element analysis. The new process of architectural engineering design education is proposed as a result of this research.

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

A Development of Tunnel Grouting Programme using A Research of Grouting Construction Process (터널 차수 그라우팅 시공 프로세스 연구를 통한 프로그램 개발)

  • Kim, Jin-Chun;Yoo, Byung-Sun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.1
    • /
    • pp.23-30
    • /
    • 2018
  • The purpose of this study is to provide an integrated solution which includes construction process that allows effective tunnel grouting and to develop a tunnel grouting programme by establishing an algorithm through theoretical analysis on tunnel grouting construction technique factors. In order to verify the developed tunnel grouting procedure and the effectiveness of the programme, they are applied on certain work sites. Values after the application are Lu = 0.31 and ground-water inflow = 0.191/min where as the pre-application value of ground-water inflow is 6.691/min which is approximately 35 times larger. This shows that Tunnel grouting construction effect is significant and suggests the possibility of the application of the process and the programme on future tunnel grouting construction.

The Design and Construction Management of Exposed Concrete Finish Work through the Construction Process Analysis (노출콘크리트 마감공법의 시공 프로세스 분석을 통한 설계 시공관리 방안)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.160-170
    • /
    • 2005
  • Because designers want to express various elevation, architectural concrete has recently paid attention to finish material and has increasingly used in the construction. architectural concrete needs more careful and professional supervision works such as controling quality of color, texture, construction plan, and design plan. none the less, It is not clear to define process and manage methods for the construction life-cycle, which causes the expense to increase and the quality to be poor. this study will analyze concrete finish method by dividing three parts which are common, exposed and architectural concrete finish method. definition and the limit of application in architectural concrete finish method will be present by comparing three methods. Throughout an interview with a staff in charge and a case study, this paper shows the requirement and the keynote of management which are divided by three steps; the design, construction and maintenance. finally, this research provides management methods of individual steps for effective construction.