A Study on Compaction Characteristics of Surplus Soils in Mountainous Areas in Busan, GyungNam Province (부산 경남지역 산지 현장 발생토의 다짐특성 연구)

  • Jung-Uk Kang;Gi-Ju Noh;Tae-Hyung Kim;In-Gon Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.2
    • /
    • pp.63-70
    • /
    • 2023
  • Most of the industrial complexes and housing complexes in Busan and Gyeongnam were constructed by developing mountainous areas, except for some landfill areas. During the development process, the surplus soil for site development was mainly used as the embankment material. In the field, however, even if the material of the material changes during the embankment work for site development, for convenience reasons such as construction period and site conditions, the material property test and compaction test are not additionally conducted for the embankment material, and quality control is conducted. In this study, physical property tests and compaction tests were conducted on surplus soils in mountainous areas in Busan, GyungNam Province and then regression analysis was performed on the data. In addition, a comparative analysis was conducted along with existing studies in Korea. The surplus soils at the sites in Busan and Gyeongnam were mainly weathered soils of granites, and were classified into clayey sand (SC) and silty sand (SM). As a result of regression analysis of the compaction characteristics according to the content of coarse and fine soils, the correlation between them was very high. Using the relational formula as a result of this study, it will be very useful for compaction management of the surplus soils in the field.

A Study on Optimal Reinforcing Type of Precast Retaining Wall Reinforced by Micropiles (마이크로파일로 보강된 프리캐스트 콘크리트 옹벽의 최적보강형태에 관한 연구)

  • Kim, Hong-Taek;Park, Jun-Yong;Yoo, Chan-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.89-99
    • /
    • 2006
  • The PCRW (Precast Concrete Retaining Wall) has many advantages compared with cast in place concrete retaining wall : shorter construction period, excellency of quality and minimum interference with the adjacent structure and traffics. However, shallow foundation type of PCRW, which has comparatively better ground condition, has some disadvantages such as difficulty in transportation and higher cost due to the size of PCRW being expanded by resisting only with self-weight if there is no other supplementary reinforcement. The presented study, in order to complement such disadvantages of PCRW, have applied the micropile method. The micropile method has advantages like low-cost and high-efficiency and does not require huge space, because it can be executed with small size equipment. However, the mechanical behavior characteristics of the PCRW reinforced by micropile, which is installed to improve the reinforcement effect, is not yet clearly identified and there is no suggested standard as to the length, diameter, install angle and install position of micropiles. Hence, this method is yet being designed depend on engineer's experience. In this study, various laboratory model tests as to sliding and overturning were performed in order to identify and present the optimum type of reinforcement and reinforcement effect of the PCRW reinforced by micropiles. In addition, it also executed numerical analysis for the purpose of verifying the optimum type of reinforcement for micropiles based on the results of laboratory model tests. The optimum reinforcement type of micropiles was estimated by model test and numerical analysis. The length of micropiles is 0.4 times wall height and the diameter is 0.04 times wall length.

A study on hydraulic behaviour and leakage control of segment linings using the numerical method (수치해석을 이용한 세그먼트라이닝의 수리거동과 누수제어 연구)

  • Shin, Jong-Ho;Shin, Yong-Suk;Pam, Dong-In;Chae, Sung-Elm;Choi, Kyu-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.131-140
    • /
    • 2009
  • It has been repeatedly reported that a drainage system of a drained tunnel is deteriorated. And consequently the water pressure on the lining increases with time. However, little research on the watertight tunnel was found in the literatures. According to field measurements, leakage of the undrained tunnel has increased with time, which is completely opposite to the behavior of the drained tunnel. It is evident that the hydraulic deterioration of the tunnel lining changes the water pressure on the lining and the amount of leakage, thus the design coneept in terms of groundwater is not maintained tightly throughout the life time of the tunnel. The Segment lining is generally constructed as watertight. However, it is frequently reported that the leakage in the segment tunnel increases with time. It is also reported that the leakage is generally concentrated at the joints of the segments. In this study structural and hydraulic interaetion of the segment lining due to the hydraulic deterioration of the segments and the joints is investigated using the numerical modeling method. An electric utility tunnel below groundwater table is considered for the analyses. The effects of hydraulic deterioration of the segment lining are identified in terms of ground loading, water pressure and lining behavior. A remedial grouting measure for leakage is also numerically simulated, and its appropriateness is evaluated.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

Evaluation of bonding state of shotcrete lining using nondestructive testing methods - experimental analysis (비파괴 시험 기법을 이용한 숏크리트 배면 접착상태 평가에 관한 실험적 연구)

  • Song, Ki-Il;Cho, Gye-Chun;Chang, Seok-Bue;Hong, Eun-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.71-83
    • /
    • 2009
  • Shotcrete is an important primary support for tunnelling in rock. The quality control of shotcrete is a core issue in the safe construction and maintenance of tunnels. Although shotcrete may be applied well initially onto excavated rock surfaces, it is affected by blasting, rock deformation and shrinkage and can debond from the excavated surface, causing problems such as corrosion, buckling, fracturing and the creation of internal voids. This study suggests an effective non-destructive evaluation method of the tunnel shotcrete bonding state applied onto hard rocks using the impact-echo (IE) method and ground penetration radar (GPR). To verify previous numerical simulation results, experimental study carried out. Generally, the bonding state of shotcrete can be classified into void, debonded, and fully bonded. In the laboratory, three different bonding conditions were modeled. The signals obtained from the experimental IE tests were analyzed at the time domain, frequency domain, and time-frequency domain (i.e., the Short- Time Fourier transform). For all cases in the analyses, the experimental test results were in good agreement with the previous numerical simulation results, verifying this approach. Both the numerical and experimental results suggest that the bonding state of shotcrete can be evaluated through changes in the resonance frequency and geometric damping ratio in a frequency domain analysis, and through changes in the contour shape and correlation coefficient in a time-frequency analysis: as the bonding state worsens in hard rock condition, the autospectral density increases, the geometric damping ratio decreases, and the contour shape in the time-frequency domain has a long tail parallel to the time axis. The correlation coefficient can be effectively applied for a quantitative evaluation of bonding state of tunnel shotcrete. Finally, the bonding state of shotcrete can be successfully evaluated based on the process suggested in this study.

Assessment of structural fire resistance of a fire-proofed immersed tunnel under tunnel fire scenarios (화재시나리오별 침매터널 구조물의 화재저항성 평가)

  • Choi, Soon-Wook;Chang, Soo-Ho;Kim, Heung-Yon;Jo, Bong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.429-441
    • /
    • 2010
  • In this study, fire resistance of a fireproof material sprayed upon an immersed tunnel was experimentally evaluated under $HC_{inc}$ and IS0834(duration of 4 hours) fire scenarios. Under $HC_{inc}$ fire scenario, the maximum inner temperatures of a concrete specimen at the depth of 0, 25 and 50 mm from the interface between the structure and the fire-proofing layer were $311^{\circ}C$, $194^{\circ}C$ and $142^{\circ}C$ respectively. Similarly, the corresponding maximum temperatures under IS0834 fire scenario were $332^{\circ}C$, $222^{\circ}C$ and $179^{\circ}C$ respectively. From the results, it was revealed that the two different fire scenarios assumed in this study have almost the same fire capacity as each other in the maximum temperature concept. In addition, a structural analysis of the immersed tunnel under $HC_{inc}$ fire scenario was carried out to verify the effects of the fireproof material on its structural stability. Material loss and deterioration of a concrete specimen without any fire-proofing measure was also experimentally evaluated to obtain input parameters for the structural analysis under such a severe fire scenario. From the results, it was confirmed that the application of fireproof measures to the immersed tunnel is essential for its structural stability even under a severe fire scenario.

Progress Measurement of Structural Frame Construction using Point Cloud Data (포인트 클라우드 데이터를 활용한 골조공사 진도측정 연구)

  • Kim, Ju-Yong;Kim, Sanghee;Kim, Gwang-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.37-46
    • /
    • 2024
  • Recently, 3D laser scanning technology, which can collect accurate and quick information on phenomena, has been attracting attention among smart construction technologies. 3D laser scanning technology can obtain information most similar to reality at construction sites. In this study, we would like to apply a new member identification method to an actual building and present the possibility of applying point cloud data, which can be collected using 3D laser scanning technology, to measuring progress at construction sites. In order to carry out the research, we collected location information for component identification from BIM, set a recognition margin for the collected location information, and proceeded to identify the components that make up the building from point cloud data. Research results We confirmed that the columns, beams, walls, and slabs that make up a building can be identified from point cloud data. The identification results can be used to confirm all the parts that have been completed in the actual building, and can be used in conjunction with the unit price of each part in the project BOQ for prefabricated calculations. In addition, the point cloud data obtained through research can be used as accurate data for quality control monitoring of construction sites and building maintenance management. The research results can contribute to improving the timeliness and accuracy of construction information used in future project applications.

Studies on the Durability of Mortars (모르타르의 내구성에 관한 연구)

  • 고재군
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.11 no.4
    • /
    • pp.1798-1802
    • /
    • 1969
  • The experiment was carried out as one of the basic studies to improve the alkali-resistance of cement mortars and it was conducted to investigate some propetties of mortars relating to weight losses when exposed to 0.1 N salution of sodium hydroxide. The experiment and the results obtained are summarized as follow; 1. The specimens used in this experiment were made of 5 centi-meter cubes of mortar having such various ratios of mix by weight as 1 : 1, 1 : 3, 1 : 5, 1 : 7 and 1 : 10. 2. Physical tests included compressive strengths at 7 days, 28 days, 3 months, and 6 month, and 5 hour boiling absorption test. 3. In alkali test, every specimen was immersed into 0.1 N solutions of sodium hydroxide. The specimens exposed to the alkali solution were weighed to determine the weight losses of the alkail-corroded at one week interval for 7 week's exposure and the old alkali solutions were also changed to fresh solutions when weighed the weight losses by alkali attack at one week interval. 4. According to the alkail test after 7 week's exposure, no weight losses were observed on ratios of mix 1:1 and 1:3 and slight weight losses occurred on ratios of mix 1:5 and 1:7, but relatively large amount of weight losses were showed by 36.6 per-cent on ratios of mix 1:10. It was also found that the weight losses of the alkali-corroded were extremely lower than those of the acid-corroded at the some concentrations as 0.1 N of solutions. 5. In order to make better quality of alkali-resistant mortar it might recomend that a 1:7 mix or richemixes, use of small amount of mixing water for watertight, 20 per cent or less absorption by 5 hour boiling 1,600 kirogram per cubic meters or denser densities by absolute dry base are available for physical properties of mortar. It could conclude acid-resistant mortars were so high alkali-resistant, that it is expected to make and improve the acid-resistant mortars for getting rid of damages by alkali attack.

  • PDF

A Study on the Improvement of Laws Related to the Safety Management of Children's Play Facilities (어린이놀이시설 안전관리법규의 개선방향)

  • Lee, Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.2
    • /
    • pp.47-61
    • /
    • 2009
  • The purpose of this study was to understand the laws related to the safety management of children's play facilities(LRSMCPF) including the "Safety Supervision Law of Children's Play Facilities(SSLCPF)" and the "Quality Management and Industrial Products Safety Management Law(QMIPSAL)", in order to analyze the problems by 4 phases-development of products, landscape design, landscape construction and maintenance considering landscape project procedure-and to propose a revision of the laws. The results are as follows: 1. The various LRSMCPF, SSLCPF and QMIPSAL, as basic laws for the safety management of children's play facilities, were insufficient regarding the features of children's play facilities and play spaces, which are both comparatively varied and complex. 2. In development of products, the one-year duration of safety certification based on QMIPSAL was too short and the procedure for safety certification were redundant in both products and plants inspection, and export and import product inspection. 3. The field inspection of construction sites based on SSLCPF was repeated with quality control and a consultation of rules based on "Construction Technology Management Law". 4. There are not enough safety inspection organizations regarding children's play facilities to meet the demand of safety certification, safety inspection, and safety education in the near future. 5. For children's play safety, the establishment of a general safety management system for children's play connected with the phases is needed to ensure safe play equipment, to construct safe playgrounds, and to manage play facilities. The criteria, regulations, and procedure regarding safety certification and safety inspection of play facilities must be revised efficiently and standardized to a global level as well. To improve the system and contents of safety certification and inspection, authorization of safety inspection organizations based on landscape architecture is needed. Further study will be required to concretely analyze in detail the laws, enforcement decrees and rules, and ordinances that consider the practical experience of professional landscape architects, inspectors, and lawyers.

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works (문화재수리공사의 감리업무량 조사를 통한 감리대가 기준 마련 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.32-42
    • /
    • 2013
  • The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.