In this study, the optimization algorithm by inverse analysis that is the core of the adaptive management technique was adopted to update the soil engineering properties based on the ground response during the construction. Adaptive management technique is the framework wherein construction and design procedures are adjusted based on observations and measurements made as construction proceeds. To evaluate the performance of the adaptive management technique, the numerical simulation for the triaxial tests and the synthetic deep excavation were conducted with the Hardening Soil model. To effectively conduct the analysis, the effective parameters among the parameters employed in the model were selected based on the composite scaled sensitivity analysis. The results from the undrained triaxial tests performed with soft Chicago clays were used for the parameter calibration. The simulation for the synthetic deep excavation were conducted assuming that the soil engineering parameters obtained from the triaxial simulation represent the actual field condition. These values were used as the reference values. The observation for the synthetic deep excavation simulations was the horizontal displacement of the support wall that has the highest composite scaled sensitivity among the other possible observations. It was found that the horizontal displacement of the support wall with the various initial soil properties were converged to the reference displacement by using the adaptive management technique.
In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.
The settlement prediction during the design phase is primarily conducted using theoretical methods. However, measurement-based settlement prediction methods that predict future settlements based on measured settlement data over time are primarily used during construction due to accuracy issues. Among these methods, the hyperbolic method is commonly used. However, the existing hyperbolic method has accuracy issues and statistical limitations. Therefore, a weighted nonlinear regression hyperbolic method has been proposed. In this study, two weighting methods were applied to the weighted nonlinear regression hyperbolic method to compare and analyze the accuracy of settlement prediction. Measured settlement plate data from two sites located in Busan New Port were used. The settlement of the remaining sections was predicted by setting the regression analysis section to 30%, 50%, and 70% of the total data. Thus, regardless of the weight assignment method, the settlement prediction based on the hyperbolic method demonstrated a remarkable increase in accuracy as the regression analysis section increased. The weighted nonlinear regression hyperbolic method predicted settlement more accurately than the existing linear regression hyperbolic method. In particular, despite a smaller regression analysis section, the weighted nonlinear regression hyperbolic method showed higher settlement prediction performance than the existing linear regression hyperbolic method. Thus, it was confirmed that the weighted nonlinear regression hyperbolic method could predict settlement much faster and more accurately.
Park, Chul-Soo;Mok, Young-Jin;Choi, Chan-Yong;Lee, Tai-Hee
Journal of the Korean Geotechnical Society
/
v.25
no.9
/
pp.45-55
/
2009
The quality of railroad trackbed fills has been controlled by field measurements of density and bearing resistance of plate-load tests. The control measures are compatible with the design procedures whose design parameter is $k_{30}$ for both ordinary-speed railways and high-speed railways. However, one of fatal flaws of the design procedures is that there are no simple laboratory measurement procedures for the design parameters ($k_{30}$ or, $E_{v2}$ and $E_{v2}/E_{v1}$) in design stage. To overcome the defect, the compressional wave velocity was adopted as a control measure, in parallel with the advent of the new design procedure, and its measurement technique was proposed in the preliminary investigation. The key concept of the quality control procedure is that the target value for field compaction control is the compressional wave velocity determined at optimum moisture content using modified compaction test, and direct-arrival method is used for the field measurements during construction, which is simple and reliable enough for practice engineers to access. This direct-arrival method is well-suited for such a shallow and homogeneous fill lift in terms of applicability and cost effectiveness. The sensitivity of direct-arrival test results according to the compaction quality was demonstrated at a test site, and it was concluded that compressional wave velocity can be effectively used as quality control measure. The experimental background far the companion study (Park et al., 2009) was established through field and laboratory measurements of the compressional wave velocity.
Journal of the Korea institute for structural maintenance and inspection
/
v.14
no.4
/
pp.126-132
/
2010
Carbonation is the results of the interaction of carbon dioxide gas in the atmosphere with the alkaline hydroxides in the concrete. Reinforced steel corrosion due to concrete carbonation is one of main factors on the decrease in durability of RC structure. This study investigates the influence of carbonation on the bridges under various environment condition and quantifies the effect of carbonation various domestic field data. The failure probability of durability is evaluated on the basis of reliability concept. In addition, service life of the structures is predicted based on the intended probability of durable failure in domestic concrete specification. According to experimental results of the carbonation depth, the carbonation depth increased with structural age. It is analyzed that carbonation velocity of the structures under urban area and sea condition is 1.6-1.9 times faster than the river condition. Service life of the bridges under urban area and sea condition is decreased about 2.4-3.3 times than river condition.
Jo, Byung-Wan;Kim, Heoun;Park, Jung-Hoon;Yoon, Kwang-Won;Park, Cheol;Song, Sung-Keun
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.445-448
/
2011
최근 재료 및 시공 기술의 지속적 발전으로 인하여, 사장교, 현수교 등 장대교량의 건설이 증가하고 있다. 이러한 장대교량들은 사회적 및 경제적인 중요성이 매우 크므로 교량 완공 후 유지관리 및 구조적 건전성을 모니터링하기 위하여 교량 각 주요 구조부재에 다양한 센서를 설치함으로써 교량모니터링시스템을 구축하여 외부하중에 의한 교량구조물의 거동을 감지, 수집, 분석하여 교량의 건전성을 파악하기 위하여 장대교량의 공용성과 안전성 확보에 많은 연구가 진행 되고 있으며 현재 국내외 다수의 장대교량들에는 다양한 센서로 이루어진 구조 건전성 모니터링 시스템이 설치, 운용되고 있다. 실제로 서해대교, 광안대교, 홍콩 TsingMa Bridge, 미국 Bill Emerson Memorial Bridge와 같은 실제 교량에도 적용된 바 있다. 하지만, 이상의 구조 건전성 모니터링 시스템 기술이 널리 활용되는 데는 여러 가지 장애물이 있는데, 그 중에서 가장 큰 것이 시스템을 구축하는 데 과다한 비용이 소요된다는 점이다. 예로 홍콩의 Tsing Ma 대교의 경우 350개의 센서를 설치하는데 약 8백만불이 넘는 금액이 들었으며(Farrar 등, 2004), Celeby(2002)의 보고에 의하면 각 센서의 채널 당 케이블의 설치 비용으로 약 5000불의 비용이 소모되고 있다. 이에 본 연구에서는 이러한 불편함을 극복하기 위하여 무선 센서를 개발하고, 이를 한강 상 교량 중 올림픽대교에 적용, 사장교의 구조 건전성을 저비용 및 높은 편의성으로 모니터링 하기 위한 테스트베드를 구축하여 무선 계측 시스템의 정확성 및 적용성을 확인하였다.
The negative skin friction on piles, which are installed in currently consolidating soft deposits, creates significant problems on the stability of pile foundations. This study investigated whether or not the pile foundation designs were appropriate in soft deposits with large amount of consolidation settlement. The final settlements of the grounds along the pile depth were estimated by the soil parameters obtained from the laboratory tests and by the field-measured settlement curves, if they were available. The displacement of the piles along the pile depth was estimated by both the load transfer method and the numerical method. Both methods gave similar locations of neutral planes and magnitudes of the maximum axial forces on the piles. The movements of the ground and the piles were compared to calculate the down drag acting on piles. For the piles whose bearing capacities were less than the design loads including the down drag, slip layer coatings and/or incrementing of the pile penetration depth into the bearing stratum were proposed to improve the pile capacities.
Kim, Dae-Sang;Park, Seong-Yong;Shin, Min-Ho;Lee, Hyeon-Jung;Kim, Hyun-Ki
Journal of the Korean Society for Railway
/
v.10
no.5
/
pp.457-462
/
2007
An application of concrete track is being activity processed for the construction of Korean railroad. The concrete track has an advantage to decrease the maintenance fee, but is very difficult to control the settlement of ground and embankment consisting of substructure of concrete track below the allowable settlement level. This is the reason why the measurement and evaluation of both ground and embankment settlement before the installation of the concrete track is very important. One ground, a lower subgrade, and five surface settlements are measured to understand the settlement behavior of ground and embankment settlement. The period to measure settlements was more than 1 year after the completion of embankment. In this test site, ground settlement was over during the construction of embankment, but the embankment settlement are being continuously proceeded after the completion of embankment. The settlement velocity gradually is slowing down as time goes by. This paper also analysed the reasons of abrupt settlement increase and concluded that the rainfall was one of the important reason to increase settlement rate.
Lee, Dal Won;Kang, Yea Mook;Kim, Seong Wan;Chee, In Taeg
Korean Journal of Agricultural Science
/
v.24
no.2
/
pp.145-155
/
1997
The large scaled field test by prefabricated vertical drains was performed to evaluate the superiority of vertical discharge capacity for drain materials through compare and analyze the time-settlement behavior with drain spacing and the compression index and consolidation coefficient obtained by laboratory experiments and field monitoring system. 1. The relation of measurement settlement($S_m$) versus design settlement($S_t$) and measurement consolidation ratio($U_m$) versus design consolidation ratio($U_t$) were shown $S_m=(1.0{\sim}1.1)S_t$, $U_m=(1.13{\sim}1.17)U_t$ at 1.0m drain spacing and $S_m=(0.7{\sim}0.8)S_t$, $U_m=(0.92{\sim}0.99)U_t$ at l.5m drain spacing, respectively. 2. The relation of field compressing index($C_{cfield}$) and virgin compression index($V_{cclab.}$) was shown $C_{cfield}=(1.0{\sim}1.2)V_{cclab.}$, But it was nearly same value when considered the error with determination method of virgin compression index and prediction method of total settlement. 3. Field consolidation coefficient was larger than laboratory consolidation coefficient, and the consolidation coefficient ratio($C_h/C_v$) were $C_h=(2.4{\sim}3.0)C_v$. $C_h=(3.5{\sim}4.3)C_v$ at 1.0m and 1.5m drain spacing and increased with increasing of drain spacing. 4. The evaluation of vertical discharge capacity with drain spacing from the results of the consolidation coefficient ratio showed largely superior in case the Mebra drain and Amer drain than other drain materials at 1.0m and 1.5m drain spacing, while the values showed nearly same value in case same drain spacing.
The purpose of this paper is to develop a reliability model for slope stability of Earth-rockfill dams which accounts for all uncertainties encountered. The uncertain factors of the design variables include the cohesion, the angle of internal friction, and the porewater Pressure in each zone. More specifically, the model errors in estimating those variables are studied in depth. To reduce the uncertainties due to model errors, updated design variables are obtained using Bayesian Theory. For stability analysis, both the two-dimesional stability analysis and the three-dimensional stability analysis where the end effects and the system reliability concept are considered are used for the reliability calculations. The deterministic safety factor by the three-dimensional analysis is lager than that by the two-dimensional anlysis. However, the probability of failure by the three-dimensional analysis is about 3.5 times larger that by the two-dimensional analysis. It is because the system reliability concept is used in the three-dimensional analysis. The sensitivity analysis shows that the probability of failure is more sensitive to the uncertainty of the cohesion than that of the angle of internal friction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.