• Title/Summary/Keyword: 시공조건

Search Result 1,434, Processing Time 0.031 seconds

An IPA-based Evaluation of 3D Scanning Technology Application for Quality Control in Modular Construction Projects (IPA 분석을 통한 3차원 스캐닝의 모듈러 건축 프로젝트 품질관리 적용에 관한 연구)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.471-482
    • /
    • 2024
  • Modular construction, a prominent method in the evolving construction industry, necessitates robust quality control for successful implementation. This study investigates the potential of 3D scanning technology for enhancing quality control processes in modular building construction. Through an IPA analysis of major construction projects across factory production, transportation, and on-site stages, the study evaluates the current state of 3D scanning application in modular construction quality control. Results indicate a high demand for 3D scanning data across various quality control aspects. However, certain limitations in technology and practical application were identified. The findings of this research contribute to the advancement of 3D scanning technology in modular construction and inform future research on cutting-edge quality control strategies.

The Study on Improvement Methods for The Seismic Performance of Port Structures (항만 구조물의 내진성능 향상을 위한 배면 지반의 보강방안에 관한 연구)

  • Kim, Byung-Il;Hong, Kang-Han;Kim, Jin-Hae;Han, Sang-Jae
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.4
    • /
    • pp.151-165
    • /
    • 2019
  • In this study, the four types of improvement methods (increase self weight and reducing sliding force etc.) were proposed depending on install location with compaction grouting to improve seismic performance of existing port structure and optimal methods by analyzing the effects of improvement (stability, constructability and economy) by theoretical and numerical methods. From the dynamic time history analysis for artificial seismic waves, the results indicated that the horizontal displacement after improvement decreased compared to before improvement, however the displacement reduction effect among improvement methods was not significantly different. Slope stability based on the strength reduction method and the limit equilibrium analysis method, it is confirmed that the passive pile method is more safe than other methods. It is due to the shear strength at the failure surface is increased. In addition, the analysis of constructability and economy showed that the reduction of earth pressure method (type 02) and the passive pile method (type 03) are excellent. However, in the case of the passive pile method is concerned that there is a shortage of design cases and the efficiency can be reduced depend on various constraints such as ground conditions.

A Study on the Characteristics of Behavior of Block-type Reinforced Earth Retaining Wall Considering Failure Surface (파괴면을 고려한 블록식 보강토 옹벽의 거동 특성 연구)

  • Yoon, Won-Sub;Park, Jun-Kyu;Chae, Young-Su
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.3
    • /
    • pp.13-26
    • /
    • 2016
  • In this study, more economical than conventional reinforced soil retaining walls, we compared the behavior characteristic about the safety block type numerically for reinforced retaining wall. In this study, reinforced soil retaining wall, first, was integrated a wall putting shear key on the blocks. Second, construction reinforcement focused on the theoretical failure surface was satisfied with the stability of a retaining wall reinforced by a shear plane. when analyzing, element of using reinforcement was carried out a numerical analysis for the cable element and the strip element, and they were analyzed under the conditions according to the stiffener length, distance, with or without shear key. Analysis for the integration of the front wall was reinforced soil retaining walls by installing a larger displacement shear key confinement effect, if reinforced construction and reinforcement with 1 interval and 2 interval, the failure surface was bigger displacement constraints. Generating a deformation amount was smaller than the generation amount of deformation accrued during construction of AASHTO so that it was stable.

A case Study on Settlement and Bearing Capacity Improvement for Soft Clay Applying the Reinforcement Method using Stabilized Soil (고화처리공법이 적용된 연약점토지반의 침하 및 지지력 개선에 관한 사례연구)

  • Ki, Wan-Seo;Kim, Sun-Hak
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.3923-3930
    • /
    • 2014
  • In this study, the physical and dynamic characteristics of soil were analyzed by selecting 3 sections as research subjects among road and structure construction sections in the construction site of the Gwangyang ${\bigcirc}{\bigcirc}$ industry area, and conducted consolidation analysis and bearing capacity assessments through Midas-GTS according to the construction conditions of the structures and section conditions of reinforcement using stabilized soil. The effects of improving the settlement and bearing capacity according to the improved effects of the stability and sections of reinforcement using stabilized soil in applying the reinforcement method using stabilized soil were analyzed as a solution for improving the settlement and bearing capacity of soft clay for constructing roads and structures. The improvement effects of the settlement and bearing capacity were outstanding when the reinforcement method using stabilized soil to the soft clay was applied. After applying the reinforcement method using stabilized soil, the holdback effect of the consolidation settlement was excellent by decreasing the volume of the consolidation settlement from a minimum of 53% to a maximum of 82%. When the width of the reinforcement using stabilized soil was twice the width of the constructed structure, it was found that the holdback effect of the consolidation settlement ranged from 1% to 7% through the width of reinforcement using stabilized soil. In addition, when applying reinforcement more than 6m in width and 1m in depth using stabilized soil, it was found that the increase in the allowable bearing capacity was 2.3 to 3.3 times more than that before applying the reinforcement, which suggests that the increase in bearing capacity by applying the reinforcement method using stabilized soil was significant.

Improvement of Field Installation Method for Asphalt Concrete Pavement Strain Gauge (아스팔트 콘크리트 포장 변형률계 매설 방법 개선에 관한 연구)

  • Lee, Jae-Hoon;Kim, Ji-Won;Kim, Do-Hyung;Lee, Kwang-Ho
    • International Journal of Highway Engineering
    • /
    • v.5 no.3 s.17
    • /
    • pp.31-42
    • /
    • 2003
  • The KHC Test Road project was initiated on 1991 to develop Korean Pavement Design Guide. It was constructed along the Joongbu Inland Expressway line between Yeoju and Gamgok. It is two-lane wide expressway containing fifteen asphalt and twenty-five Portland cement concrete test pavement sections. Various sensors were installed in the Test Road to evaluate the behavior of test pavement sections under the influence of traffic load and environmental change. The most important issues in the sensor installation are the accurate location and long-term survivability. They are directly influenced by the sensor installation methodology. The methodology for asphalt strain gages is mainly discussed in this paper because it is the second important sensors in the KHC Test Road project. In order to find the best methodology, we evaluated existing methodology from prior experience and several conducted test installations. We have tried mound, block out, and trench cuts since 2000. Among three methods, block out was the most effective one in terms of accurate location, long-term survivability, and material homogeneity. However, this method cannot be applied to the wearing coarse so that the mound method was used as an alternative. The block out method was applied to base and intermediate layers while the mound method was used to the wearing coarse. Three hundred seventy-four asphalt strain gauges were installed on asphalt pavement sections from September 3rd to November 18th in 2002. According to the sensor measurement evaluation, 6.3% of sensor demonstrated over ranged readings for mound method installation and 2.5% did for block out method installation. We lost only two sensors during the installation. It is 99.5% survival and it is excellent survival rate according to other experience.

  • PDF

Behavior and Improvement of Construction Crack occurred on Anchorage of PSC-edge Girder Rahmen Bridge (PSC-Edge 거더 라멘교의 정착부에 발생한 시공 균열 거동과 개선)

  • Ok, Jae-Ho;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.569-576
    • /
    • 2019
  • PSC-Edge Rahmen Bridge makes low thickness and long span by introducing prestressed force to the edge girder and reducing positive moment. In the bridge, diagonal tension cracks occurred in the direction of $45^{\circ}$ to outer side of the girder after the temporary bent supported on the lower part of the upper slab and the secondary strand is tensioned on the girder. Researches on stress distribution and burst crack behavior of pre-stress anchorage has been conducted, it is difficult to analyze an obvious cause due to difference between actual shape and boundary condition. This study performed 3D frame analysis with additional boundary condition of temporary bent, the maximum compression stress occurred in the girder and there was a limit to identify the cause. It performed 3D Solid analysis with LUSAS 16.1 and the maximum principal tensile stress occurred at the boundary between the girder and the slab. As analyzing required reinforcement quantity at obtuse angle of the girder with the maximum principal tensile stress and directional cosine, reinforcement quantity was insufficient. Additional bridges have increased reinforcement quantity and extended area and crack was not occurred. It is expected that cracks on the girder during construction could be controlled by applying the proposed method to PSC-Edge Rahmen Bridge.

Evaluation of Bio-cha's ability to secure underground penetration water and its effect on water quality improvement (바이오차의 지하 침투수 확보 능력 및 수질개선 효과 평가)

  • Tae Seong Kang;Jeong Ha Lim;Dong Hyuk Kum;Min Hwan Shin;Jong Gun Kim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.468-468
    • /
    • 2023
  • 최근 급격한 기후변화에 의한 이상가뭄 발생 등을 대비하기 위한 비상용수 또는 대체 수자원으로서의 지하수 개발수요가 증가함에 따라 기저유량 확보 및 수질개선 방안을 수립하는 것은 지속가능한 수자원 이용 관리 측면에 있어서 매우 중요하다. 국내 지하수 사용에 따른 하천유량의 변동에 관한 연구는 활발히 진행되었으나, 실질적으로 적용가능한 지하수 저감 방안 및 지하 수질개선방안에 대한 연구는 미비한 실정이다. 이에 본 연구에서는 바이오차를 이용하여 시험포를 설계 및 시공하였으며, 실내 인공강우 실험을 통해 지하 침투수 확보 능력 및 수질개선 효과를 평가하였다. 대조구는 폭 1 m × 길이 1 m × 깊이 0.60 m로 시공하였으며, 바이오차 시험포는 폭 1 m × 길이 1 m, 시험포 상단과 하단 각 0.10 m씩 대조구와 동일한 흙으로 채웠으며, 그 사이 0.40 m만큼은 바이오차를 채워서 시공하였다. 시험의 정밀도를 높이기 위해 동일한 조건으로 대조구와 바이오차 시험포 각 2개씩, 총 4개의 시험포를 시공하여 실내 인공강우 실험을 진행하였으며, 시험포에서 발생한 직접유출수와 기저유출수를 이용하여 바이오차의 지하 침투량 확보 및 수질개선효과를 분석하였다. 시험포 완공 후 총 2번의 실내인공강우 실험 결과 대조구에서 발생한 직접유출량은 총 0.214 m3, 바이오차 시험포에서는 총 0.194 m3로 대조구 대비 총 직접유출량 저감효과는 9.4%로 나타났다. 기저유출의 경우 바이오차 시험포(0.036 m3)에서 대조구(0.003 m3) 대비 약13배 많은 양의 기저유출수가 발생한 것으로 나타났다. 각 시험포에서 발생한 유출수의 오염부하를 산정해 대조구 시험포 대비 바이오차 시험포에서 발생한 직접유출수의 오염부하 저감효과를 분석한 결과 BOD5 항목과 CODMn 항목, 그리고 TOC 항목의 경우 26.3%과 22.0%, 그리고 27.6%로 저감 된 것으로 나타났으나, SS 항목과 T-N 항목, 그리고 T-P 항목의 경우 저감효과가 없는 것으로 나타났다. 이와 같이 바이오차는 지하 침투수 확보 능력은 효과적인 것으로 나타났으나, 직접유출수의 수질개선 효과는 미비한 것으로 나타났다. 그러나 바이오차의 지하 침투량 및 수질개선 효과는 바이오차 생산 시 사용된 열분해 방식, 사용된 바이오차의 양 등에 따라 편차가 클것으로 판단되며, 바이오차의 생산 방법, 토양 흡착 기간, 바이오차의 양 등 다양한 조건에서의 모니터링을 통해 정량화 되어야 할 것으로 판단된다.

  • PDF

Quantitative preliminary hazard level simulation for tunnel design based on the KICT tunnel collapse hazard index (KTH-index) (터널 붕괴 위험도 지수(KTH-index)에 기반한 터널 설계안의 정량적 사전 위험도 시뮬레이션)

  • Shin, Hyu-Soung;Kwon, Young-Cheul;Kim, Dong-Gyou;Bae, Gyu-Jin;Lee, Hong-Gyu;Shin, Young-Wan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.373-385
    • /
    • 2009
  • A new indexing methodology so called KTH-index was developed to quantitatively evaluate a potential level for tunnel collapse hazard, which has been successfully applied to tunnel construction sites to date. In this study, an attempt is made to apply this methodology for validating an outcome of tunnel design by checking the variation of KTH-index along longitudinal tunnel section. In this KTH-index simulation, it is the most important to determine the input factors reasonably. The design factor and construction condition are set up based on the designed outcome. Uncertain ground conditions are arranged based on borehole test and electro-resistivity survey data. Two scenarios for ground conditions, best and worst scenarios, are set up. From this simulation, it is shown that this methodology could be successfully applied for providing quantitative validity of a tunnel design and also potential hazard factors which should be carefully monitored in construction stage. The hazard factors would affect sensitively the hazard level of the tunnel site under consideration.

A Study on Advance Rate under the Operating Conditions of EPB Shield TBM Based on TBM Operation Data (현장 굴진자료 분석에 의한 토압식 쉴드 TBM의 운전조건과 굴진속도 연구)

  • An, Man Sun;Lim, Kwang-Su;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.839-848
    • /
    • 2011
  • TBM (Tunnel Boring Machine) tunnel should be carry out with the adopted machine until the end of excavation because of impossibility of replacement or modification of machine. Observation of the face of the tunnel is difficult, especially in EPB(Earth Pressure Balance) shield TBM, predict changes in the ground condition with analyzing data, collected during the excavation, and it should be reflected in construction. Until recently, subjects of studies on TBM are mainly the determination of machine and the development of advance rate prediction model, according to the characteristics of ground which is the target of excavation. However, study focused on the estimation of ground conditions and the improvement in operational methods using excavation data of TBM equipment, the principal of the excavation, has been done not so much. This study examine the variances in advance rate depending on changes in operating conditions and evaluate the optimal operating conditions of adopt machine, using working data obtained from EPB shield TBM project. The result of this study is suggested as follows. First, cutter head RPM and total thrust force are biggest influences on advance rate, Second, it is recommended for proper advance rate that total thrust force is controlled while optimum cutter head RPM is kept, Third, according to the increasing trend of total thrust force, the changes in ground conditions can be predicted, the appropriate operating conditions can be determined.

Analysis of Advanced Rate and Downtime of a Shield TBM Encountering Mixed Ground and Fault Zone: A Case Study (단층대와 복합지반을 통과하는 쉴드TBM의 굴진율 및 다운타임 발생 특성 분석)

  • Jeong, Hoyoung;Kim, Mincheol;Lee, Minwoo;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.29 no.6
    • /
    • pp.394-406
    • /
    • 2019
  • Difficult ground conditions (e.g., fault zone and mixed grounds) are highly probable to appear in subsea and urban tunnels because of the shallow working depth and alluvial characteristics. TBM usually experienced decrease of penetration rate and increase of downtime when it meets these difficult ground conditions. The problems are usually caused by the adverse geological conditions, and it is preferable to determine the optimal operational parameters of TBM based on the previous operational data obtained while excavating a preceding tunnel. This study carried out for efficient TBM excavation in fault zone and mixed grounds. TBM excavation data from the tunnel site in Singapore and the characteristics of the TBM excavation data was analyzed. The key operational parameters (i.e., thrust, torque, and RPM), penetration rate, and downtime were highly influenced by the presence of fault zones and mixed grounds, and the features was discussed. It is expected that the results and main discussions will be useful information for future tunneling projects in similar geological conditions.