• Title/Summary/Keyword: 시공조건

Search Result 1,432, Processing Time 0.029 seconds

Applications of Practical Analysis Scheme for Evaluating Effects of Over-Loads during Construction on Deflections of Flat Plate System (플랫 플레이트 시스템의 처짐에 대한 시공 중 과하중의 영향 평가를 위한 실용해석 기법의 적용)

  • Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.22 no.1
    • /
    • pp.25-34
    • /
    • 2009
  • RC flat plate, which has no large flexural stiffness by boundary beams, may be governed by serviceability as well as strength condition. A construction sequence and its impact on distributions of construction loads among slabs tied by shores are decisive factors on immediate and long term performances of flat plate. The over-loading and tensile cracking in early-aged slabs significantly increase the deflection of flat plate system. In this study, for slab deflections, the practical analysis scheme using a linear analysis program is formulated with considering construction sequence and concrete cracking effects. The concept of the effective moment of inertia in calculating deflections of one-way bending member, that is presented in structural design codes, is extended to the finite element analysis of the two-way slab system of flat plates. Effects of over-loads during construction on deflections of flat plate system are analyzed by applying the proposed practical analysis scheme into the critical construction load conditions calculated from the simplified method.

A Study on the Failure Mechanisms of the Mixed-face Tunnels in Decomposed Granite (화강토지반내 복합막장터널의 파괴메카니즘 연구)

  • 신종호;이인근
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.4
    • /
    • pp.317-329
    • /
    • 2001
  • 서울지하철 터널의 상당 구간이 막장면이 풍화토에서 풍화암까지 변화하는 복합화강토지반에 건설되어 왔다. 화강암풍화지반은 심도에 따라 강도의 변화가 크며, 수위가 높고 투수성 지반인 특징을 갖는다. 터널은 주로 비원형 배수터널로 설계되고 NATM 공법으로 시공되었다. 이와 같은 여건의 터널현장에서 발생하였던 붕괴사례를 조사한 결과, 대부분의 붕괴가 터널 어깨 부근으로부터 시작되었고, 구조적으로 완전하지 않은 라이닝, 그리고 지하수와의 연관성 등의 공통적 특징이 확인되었다. 이러한 터널문제는 지반조건, 시공조건, 터널형상 등 경계조건이 복잡하여 한계평형 해석과 같은 종래의 해석적 방법으로 터널안정을 검토하기가 용이하지 않다. 그 가장 큰 이유중의 하나는 터널의 파괴메카니즘에 대한 분명한 정보를 알 수 없는데 있다. 파괴메카니즘의 조사에는 전통적으로 원심모형시험법이 많이 사용되어 왔다. 그러나 화강토지반내의 터널처럼 복잡한 경계조건을 갖는 터널문제에는 적용하기 어렵다. 따라서 이에 대한 하나의 대안으로서 본 논문에서는 지반거동의 비선형성을 고려하는 Coupled 수치해석법을 이용하여 파괴메카니즘을 조사하였다. 수치해석결과의 증분변위벡터, 누적소성편차변형률 그리고 속도특성치(velocity characteristics)의 분석을 통해 실제 붕괴사례와 잘 일치하는 명확한 파괴메카니즘을 파악할 수 있었다. 이로부터 복잡한 경계조건을 갖는 터널 문제의 안정해석을 위한 파괴메카니즘을 조사하는 수치해석적 접근방법을 제시하였다.

  • PDF

Suggestion on Reasonable Boundary Conditions for Modeling a Tunnel Shield by Displacement Control Method (변위 제어를 통한 터널 쉴드 모델링의 적정 경계조건 제안)

  • Kim, Jeong-Soo;Kim, Moon-Kym
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.512-515
    • /
    • 2011
  • 터널 해석은 주로 지표침하와 터널 라이닝 내 단면력 산정에 초점이 맞춰지며 이는 시공단계를 고려한 3차원 수치해석 모델을 이용해 결정할 수 있다. 수치해석 시 shield는 응력 제어, shell element로 모델링하는 방법 등으로 모사될 수 있다. 한편 변위 제어를 통한 쉴드 모사는 shield를 적절한 경계조건으로 처리함으로서, 다른 shield 모사 방법에 비해 모델링 작업을 간소화하고 해석의 효율성을 높일 수 있다. 본 연구에서는 변위 제어에 의한 shield 모사를 위한 적정 경계조건을 제안한다. 이를 위해 시공단계가 고려된 유한요소해석을 사용하여, 쉴드 및 굴착면에서의 경계조건 변화와 이에 따른 지표침하 관측 수행하였다. 제안된 shield 변위 제어로부터 얻어진 해석결과를 이론적인 해와 비교함으로서, 제시된 shield 모델링 방법의 적정성과 지반 거동 변화를 평가하고자 한다. 해석 결과는 지반 모델의 지표침하를 기준으로 관찰되었으며, 변위제어에 의한 결과와 요소에 의한 모델링 결과가 유사하게 얻어짐을 보여준다. 또한 변위제어의 쉴드 모사에서 회전 구속보다 변위 구속 조건에 지배적으로 영향을 받음을 확인하였다.

  • PDF

The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

TBM segment lining section design of hypothetical subsea tunnels (가상 해저터널 TBM공법 적용 시 세그먼트 단면설계)

  • Choi, Jung-Hyuk;Yoo, Chung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.49-63
    • /
    • 2015
  • In this paper, the results of evaluation on the member forces in the virtual subsea tunnel lining segments and optimal thickness of the segment with changes in depth were presented. To evaluate member forces on the hypothetical subsea tunnelling cases were developed and the segmental lining member forces were calculated by performing structural analysis using the 2-Ring Beam model. Through a preliminary reinforcement design review of the cross-section using calculated member force, optimal reinforcement design was selected. Based on the results, the variations of member forces with construction conditions such as the cover depth and the hydraulic pressure are presented. In addition, optimum segment lining designs were developed for various tunnelling conditions.

Consideration of Geosynthetics Chemical Resistance Test for Long-Term Performance Evaluation (장기성능 평가를 위한 토목섬유 화학저항성 시험 고찰)

  • Jeon, Han-Yong;Jang, Yeon-Soo
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.7
    • /
    • pp.55-64
    • /
    • 2009
  • In this study, improved test methods, which consider the real site test conditions, were suggested to measure for geosynthetics chemical resistance. For this purpose index and performance tests were done to specify and regulate the test method most approaching to the installation condition and accelerated model by Arrhenius equation was applied to interpretate the experimental data. Through the analysis and comparison of the overall experimental results, we could suggest the possibility and setup of the advanced chemical resistance test method for geosynthetics fitting to the field installation conditions.

Analysis and Design of Soft Ground Tunnels Subject to Steady-State Groundwater Flow (정상류 조건하의 토사터널의 해석 및 설계)

  • Lee, In-Mo;Nam, Seok-Woo;Lee, Myung-Jae
    • Geotechnical Engineering
    • /
    • v.10 no.2
    • /
    • pp.41-56
    • /
    • 1994
  • Under the groundwater level, the tunnel face is affected by the seepage force and the groundwater flow may cause a trouble to the tunnel support systems. The appropriate methods of analysis and design in the tunnel face and the lining, considering groundwater flow according to tunnel drainage condition are presented in this thesis. First, the effect of seepage on the stability of tunnel face was studied. Seepage force was estimated by the 3-D finite element analysis and the stability of tunnel face was checked by analytical method. Furthermore, using the finite difference method the stress and displacement on the face were computed for either case, where the seepage force is or is not considered, and the effect of seepage on the tunnel face stability was evaluated. Second, the effect of seepage force on the tunnel lining when construction is finished and steady state seepage flow occurs was studied and a design methodology considering seepage effect was made. Consequently, in case where the groundwater level remains almost unchanged and the steady state groundwater flow occurs, the proper countermeasures for face staility are required according to the condition of groundwater flow. Moreover, the tunnel lining should be designed and constructed considering the seepage force occuring by the groundwater flow toward the tunnel linings.

  • PDF

Closing Analysis of Symmetric Steel Cable-stayed Bridges and Estimation of Construction Error (대칭형 강 사장교의 폐합해석과 시공오차의 예측)

  • Lee, Min Kwon;Lee, Hae Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.55-65
    • /
    • 2006
  • This paper presents the closing analysis of a symmetric steel cable-stayed bridge erected by a free cantilever method. Two independent structural systems are formed before the closing procedure of a bridge is performed, and thus the compatibility conditions for vertical displacement and rotational angle are not satisfied at the closing section without the application of proper sectional forces. Since, however, it is usually impossible to apply sectional forces at the closing section, the compatibility conditions should be satisfied by proper external forces that can be actually applicable to a bridge. Unstrained lengths of selected cables and the pull-up force of a derrick crane are adjusted to satisfy nonlinear compatibility conditions, which are solved iteratively by the Newton-Raphson method. Cable members are modeled by the elastic catenary cable elements, and towers and main girders are discretized by linear 3-D frame elements. The sensitivities of displacement with respect to the unstrained lengths of selected cables and the pull-up force of the derrick crane are evaluated by the direct differentiation of the equilibrium equation. A Monte-Carlo simulation approach is proposed to estimate expected construction errors for a given confidence level. The proposed method is applied to the second Jindo Grand Bridge to demonstrate its validity and effectiveness.

Evaluation of rock load based on stress transfer effect due to tunnel excavation (굴착으로 인한 응력전이효과를 고려한 터널의 지반이완하중 평가)

  • Lee, Jae-Kook;Kim, Jung-Joo;Rehman, Hafeezur;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.999-1012
    • /
    • 2017
  • Theoretical, empirical and numerical methods are used to evaluate the rock load due to tunnelling. Theoretical and empirical methods do not consider ground conditions, tunnel shape, and construction conditions. However, through numerical analysis, it is possible to analyze the displacement and stresses around tunnel due to its excavation, and evaluate the rock load considering ground and construction conditions. The stress transfer ratio(e) which is defined as a ratio of the difference between the major and minor principal stresses to major principal stress is used in order to understand the stress transfer effect around the tunnel excavation using numerical analysis results. The loosend area around tunnel periphery was found based on this approach. The difference of rock load from stress transfer effect was found according to the ground grade. From comparison, rock load obtained from stress transfer effect (e = 10%) were somewhat larger than the results obtained from the critical strain method, but smaller than those obtained from theoretical and empirical methods. The stress transfer effect approach considers the ground condition, tunnel shape; therefore, it can be applied to evaluate the rock load in concrete lining design.