• Title/Summary/Keyword: 시공조건

Search Result 1,432, Processing Time 0.023 seconds

Comparison of Ground Movements in A Single Ground Layer and Multiple Ground Layers due to Nearby Tunnel Excavation (터널굴착으로 발생한 주변 단일지층 및 복합지층 지반에서의 지반변위에 대한 거동비교)

  • Son, Moorak;Yun, Jongcheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3C
    • /
    • pp.167-174
    • /
    • 2010
  • In this study, numerical analysis has been performed to compare the ground movements in a single ground layer and multiple ground layers due to nearby tunnel excavation. The numerical analysis has been conducted in the different ground layer conditions considering different construction conditions (volume loss at excavation face), and the results of the maximum surface settlement and horizontal displacement have been compared considering the ground layer and construction conditions. In addition, the maximum surface settlement from the numerical analysis has been compared with the maximum settlement at tunnel crown considering the ground layer and construction conditions, and the maximum surface settlement has been also compared with the maximum horizontal displacement with the ground layer conditions. Besides, the volume loss($V_L$) at tunnel excavation face has been compared with the total surface settlement volume($V_s$) with the variation of ground layer condition. The results from the numerical analysis have been compared with field measurements and by this comparison it is believed that the numerical results in this study can be utilized practically in analyzing the nearby ground behavior in different ground layer and construction conditions due to tunnel excavation.

Ice Plant (아이스 플랜트)

  • 김경환
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.4
    • /
    • pp.56-58
    • /
    • 2002
  • $\ulcorner$콘크리트표준시방서$\lrcorner$ 에서는 "서중 콘크리트로서 시공해야 할 시기를 일률적으로 정하기는 곤란하나, 하루평균 기온이 $25^{\circ}C$ 또는 최고온도가 3$0^{\circ}C$를 초과하는 시기에 시공할 경우에는 일반적으로 서중 콘크리트로서 시공할 수 있도록 준비해 두어야 한다."고 규정하고 있고, $\ulcorner$ACI 305R$\lrcorner$ 에서는 "서중(hot weather)은 수분 손실률과 시멘트 수화율의 가속에 의하여 굳지 않은 콘크리트(fresh concrete)와 굳은 콘크리트(hardened concrete)의 품질을 저하시키는 다음 조건들이 공존하는 상태이다."고 규정하고 있으며 그 조건들은 a. 높은 대기 온도 b. 높은 콘크리트 온도 c. 낮은 상대습도 d. 바람의 세기(풍속) 이다.(중략)

Effects of Tunnel Construction on an Existing Tunnel Lining (터널 근접시공이 기존터널 라이닝에 미치는 영향에 관한 연구)

  • Yoo, Chung-Sik;Song, Ah-Ran
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.307-324
    • /
    • 2006
  • Effects of new tunnel construction on an existing tunnel are investigated in this paper. A parametric study was conducted on a number of conditions in terms of relative location of the new tunnel to the existing tunnel using 2D and 3D finite element models. The results indicated that the new tunnel construction imposes most severe effect on the existing tunnel's lining when located below the existing tunnel's springline for cases in which the new tunnel is constructed parallel to the existing tunnel. It is also revealed that the effect to the new tunnel construction is larger when the new tunnel is constructed under the existing tunnel than above for cases in which the new tunnel is crossed with the existing tunnel. Practical implications of the finding are discussed.

Case Study on Application of DMU to Civil Infra Structures to Improve Constructibility (토목구조물분야에서 DMU 적용을 통한 시공성개선 사례 연구)

  • Park, Kyoung-Lae;Lee, Kwang-Myong;Lee, Yoon-Bum;Lee, Chung-Hee;Lee, Tae-Young
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.320-323
    • /
    • 2011
  • 본 논문에서는 BIM의 기술 중 하나인 DMU(Digital Mock-Up)을 실제 프로젝트에 적용하여 업무 효율에 기여한 결과를 소개한다. 삼성물산 건설부문의 경우 DMU는 건설 프로젝트의 입찰단계 및 시공계획 단계에서 적용되어 많은 성과를 거두었다. 입찰단계의 경우 대상 프로젝트의 교량, 터널 등의 구조물을 실제와 같은 지형조건 및 설계 조건으로 모델링하여 프로젝트의 개요 파악, 정보의 공유, 선정된 공법의 효과 분석 등에 적용하였으며 시공단계에서는 주로 복잡한 구조물의 철근 간섭 검토 및 효율적인 배근 방법 분석을 위한 도구로 사용되었다. 적용결과 공기단축, 원가절감, 시공성 향상에 기여하였으며, DMU는 향후 프로젝트 관리도구로 통합되어 구조물공사의 원가절감 및 생산성 향상에 기여할 것으로 예상된다.

  • PDF

A Evaluation of Standard Support Pattern for Two-Arch Road Tunnel (2-Arch 도로터널에 적용된 표준지보패턴의 적정성 검토)

  • Chun, Byungsik;Choi, Kwangbo;Kim, Hyeyang;Yoo, Junhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.7
    • /
    • pp.25-35
    • /
    • 2008
  • In domestic cases, the standard support pattern of 2-lanes road tunnels is presented because construction experience and high degree various data was abundant. But, it is not desirable to apply standard for 2-Arch tunnels that the precedent and measuring data is insufficient existing support pattern blasting plan and interpretation of separate way concerning specific terrain and rock quality. In this study, behavior according to load distribution ratio and Unsymmetrical Pressure about standard support pattern which is applied in design and construction of 2-arch tunnels was analysed and the examination of blasting vibration has influence on the center wall is conducted as a consequence reasonableness of support whether or not with presumed support pressure and ground reaction curve method. In result appropriateness of standard support pattern, support quantity is proper but considers specific terrain and rock quality condition when design and construction of further step 2-arch tunnel standard support pattern must be decided by considering terrains, soil properties and construction condition of the objective tunnel.

  • PDF

New guideline for geomechanical design/construction of conventional NATM tunnels (NATM 터널 설계/시공을 위한 새로운 가이드라인 고찰)

  • Kim, Chang-Yong;Hong, Sung-Wan;Kim, Kwang-Yeom;Baek, Seung-Han;Bae, Gyu-Jin;Schubert, Wulf
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.73-88
    • /
    • 2005
  • Three approaches presently used for the design of underground structures in rock mass are quantitative rock mass classification system, classification systems based on the behavior of the rock mass during excavation and general qualitative procedures for the design process. In this study their characteristics and shortcomings are discussed, and Austrian guideline for tunnel design/construction, that was proposed to solve the problems with these methods, are introduced and compared. For technically sound and economic tunnel construction, a flexible design and construction procedure is needed to cope with uncertain ground and boundary condition, and also actual ground condition should be predicted through feedback of geotechnical information obtained during construction.

  • PDF

고층주거건물의 계획에 미치는 표준요구조건의 영향

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.8 s.68
    • /
    • pp.71-74
    • /
    • 1974
  • 1971년 10월 국제건축연구회의(CIB)의 제41 연구조정단(Steering Group on Tall Buildings)에 의하여 ‘고층건물’에 대한 제1차 심포지움이 개최된 바 있으며, 이 심포지움에서는 고층 주거건물, 호텔 및 사무실건물의 설계, 시공, 앞으로의 방향 및 이에 관련된 정보의 교환에 대하여 논의되었다. 아래의 내용은 상기 심포지움 중에서 고층건물에 대한 층수의 선택, 방화 및 위생조건에 대한 발표논문의 소개로서 이에 따른 설계요구조건을 제시하고 있다. 고층건물에 대한 제2차 심포지움은 1973년 가을에 개최될 예정으로서, 그 주제는 ‘고층건물의 설계, 시공 및 사용에 대한 경제적 및 사회적인 종합평가’ 이다.

  • PDF

A Structural Behaviour Analysis System for Simulating the Construction Steps of Prestressed Concrete Bridges (시공단계를 고려할 수 있는 프리스트레스트 콘크리트 교량 전용 거동해석 시스템)

  • 안경한;김대영;이환우;김덕경;김우종;김철영
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1991.10a
    • /
    • pp.96-101
    • /
    • 1991
  • 프리스트레스트 콘크리트 교량은 콘크리트와 PS 강재의 역학적 장점들을 십분 활용하여 경제적인 단면 구성이 가능한 반면, 서로 다른 두 재료의 복합적인 특성들 즉, 콘크리트의 크리이프 (creep), 건조수축 (shrinkage)과 PS 강재의 이완 (relaxation) 등과 같이 시간에 따라 변화하는 인자들로 인하여 복잡한 구조적 거동을 보여 해석상 어려움이 따른다. 이와같은 복합거동은 시공순서와 시공방법에 의해 시공중의 구조계와 지지조건 등이 변화하는 경우에는 더욱 복잡한 양상을 띄게 된다. 뿐만 아니라 박스 거더와 같은 박벽요소에서는 일반적인 보요소(beam element)로는 나타낼 수 없는 ?(warping)을 무시할 수 없으므로 ? 자유도를 구현할 수 있는 특수한 기능의 구조해석용 프로그램의 개발이 절실히 요망된다. 그리고 시공단계별로 출력되는 많은 양의 수치결과들을 설계와 시공실무자에 지향된 형태로 조합, 변형시켜 그래픽 화면상에 나타내는 후처리 프로그램(Post-processor) 기능도 구조해석용 프로그램의 개발 못지않게 중요하다. 본 연구의 목적은 삼성종합건설과 서울대 토목공학과가 공동으로 ?(warping) 자유도를 포함한 7개의 자유도를 갖는 3차원 보요소를 사용하여 PS 콘크리트의 재료적 특성인 크리이프와 건조수축, 그리고 강재의 이완(relaxation)을 포함한 프리스트레싱력의 손실을 고려할 수 있고 시공 단계별 구조계의 변화 및 지지조건들의 다양한 변화를 효율적으로 모사할 수 있는 프로그램의 개발에 있다.

  • PDF

설계기준해설 - 과거 터널현장 국부적인 붕락 유형 사례 연구

  • Kim, Nak-Yeong;Hwang, Yeong-Cheol
    • 지반과기술
    • /
    • v.10 no.4
    • /
    • pp.20-31
    • /
    • 2013
  • 본 터널 붕락 사례 연구를 종합적으로 분석해 볼때, 시공 공정 중에 발생 가능한 붕괴 및 붕락은 앞서와 같이 과거의 여러 사례들을 토대로 분석함으로서 예측 할 수 있지만, 시공 외적인 요인에 대해서는 사실상 조사, 설계, 시공 중의 오류에 의해 발생되는 것이기 때문에 파악하기 어렵다. 본 터널 붕락사례를 통해 원인을 분석 정리 하면 다음과 같다. (1) 불규칙한 지반구조적 원인 대부분의 터널 붕락을 일으키는 불규칙한 지반구조는 과거 지반구조의 침식 또는 대규모 지반운동 등 지반구조의 급속한 변화에 기인한 것이다. 터널 시공전에 면밀한 사전 지반조사와 선진 보오링 등으로 정확한 지반구조를 파악한다면 이로 인한 터널 붕락은 최소화 시킬수 있다. (2) 기획과 설계단계에서의 오류 충분치 못한 지반조사에 의한 설계 및 부적절한 시공자재 사용등으로 터널 붕락이 발생 될수 있다. 터널 굴착 주변 지반조건과 이러한 지반조건에 적합한 터널 굴착 및 보강공법 등이 터널 설계시 심도있게 검토되어야 할 가장 중요한 요소이다. (3) 시공 및 관리에서의 오류 경험이 부족한 터널기술자의 현장 감독과 현장에서 수집되는 각종 계측자료의 신뢰성 부족과 결과의 재적용 미흡으로 효율적인 계측 및 지반정보를 활용한 정밀 시공이 이루어지지 않는 것도 터널 붕락의 중요한 요인으로 분석되었다. (4) 현장관리 조사서의 표준화 부족 터널굴착공사중 붕락이 발생된 현장의 막장조사결과를 보면 조사자가 임의로 표시를 하여 각 터널별 막장조사결과가 매우 상이할 뿐만 아니라 각 터널별로 기재방법, 양식이 달라서 실제 원인분석에 활용하기가 어려운 것으로 분석되었다.

  • PDF