• Title/Summary/Keyword: 시공조건

Search Result 1,434, Processing Time 0.026 seconds

Calculations of Flat Plate Deflections Considering Effects of Construction Loads and Cracking (시공하중 및 균열 효과를 고려한 플랫 플레이트의 처짐 산정)

  • Kim, Jae-Yo;Im, Ju-Hyeuk;Park, Hong-Gun
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.6
    • /
    • pp.797-804
    • /
    • 2009
  • The structural designs of RC flat plates that have insufficient flexural stiffness due to lack of support from boundary beams may be governed by serviceability as well as a strength criteira. Specially, since over-loading and tensile cracking in early-aged slabs significantly increase the deflection of a flat plate system under construction, a construction sequence and its impact on the slab deflections may be decisive factors in designs of flat plate systems. In this study, the procedure of calculating slab deflections considering construction sequences and concrete cracking effects is proposed. The construction steps and the construction loads are defined by the simplified method, and then the slab moments, elastic deflections, and the effective moment of inertia are calculated in each construction step. The elastic deflections in column and middle strips are magnified to inelastic deflections by the effective moment of inertia, and the center deflection of slab are calculated by the crossing beam method. The proposed method is verified by comparisons with the existing test result and the nonlinear analysis result. Also, by applications of the proposed method, the effects of the slab construction cycle and the number of shored floors on the deflections of flat plates under construction are analyzed.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

A Prediction Method for Ground Surface Settlement During Shield Tunneling in Cohesive Soils (점성토 지반에서의 실드 터널 시공에 따른 지표침하 예측 기법)

  • Yoo, Chung-Sik;Lee, Ho
    • Geotechnical Engineering
    • /
    • v.13 no.6
    • /
    • pp.107-122
    • /
    • 1997
  • This paper presents a ground surface settlement prediction method for shield tunneling in cohesive soils. In order to develop the method, a parametric study on shield tunneling was performed by using a threetimensional elasto-plastic finite element analysis, which can simulate the construction procedure. By using the results of the finite element analysis, the ground movement mechanism was investigated and a base which relates the ground surface settlement and iuluencing factors was formed. The data base was then used to formulate semi -empirical equations for both surface settlement ratio above tunnel face and imflection point by means of a regression analysis. Furthermore, a prediction method for transverse and longitudinal surface settlement profiles was suggested by using the leveloped equations in conjunction with the normal probability curve. Effectiveness of the developed method was illustrated by comparing settlement profiles obtained by using the developed method with the results of finite element analysis and measured data. Based on the comparison, it was concluded that the developed method can be effectively rosed for practical applications at least within the conditions investigated.

  • PDF

The Efficient Berms for Restraining Excessive Deformation Caused by Deep Excavations in Urban Area (도심지 버팀 굴착시 과도 변헝 억제를 위한 효율적 소단)

  • 양구승;박기태
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.43-56
    • /
    • 1999
  • The use of berms can be an effective method to restrain excessive movements of wall and ground caused by deep excavations in urban area. But generally in construction sites, no berm remains for the sake of construction convenience or the geometry and magnitude of remaining berm is determined by individual experiences due to scarce research results. In this research, laboratory model tests and numerical analyses are used mainly for sandy soils. And efficient berms for restraining excessive movements by deep excavations are analyzed. Model tests were performed for the cases of cantilever and braced wall excavations, and the behaviors of retaining wall were analyzed according to the geometry and magnitude of berms. And also, numerical methods were used for analyzing efficient berms which are available in the soil and construction conditions in urban areas of Korea.

  • PDF

A study on chemical bonding characteristics of the interface between curved FRP panels for consecutive structural assembly (곡면 FRP 패널 부재 연속시공을 위한 연결부 화학적 접합 특성에 관한 연구)

  • Lee, Gyu-Phil;Shin, Hyu-Soung;Jung, Woo-Tai
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.1
    • /
    • pp.79-91
    • /
    • 2012
  • A curved fiber reinforced polymer (FRP) panel is produced with a certain width depending on allowances of manufacturing processes and facilities. An targeted arch-shaped structure could be built by sequential connection of series of the FRP panels. The connection manner between the FRP panels could be given by chemical treatment, mechanical treatment and hybrid method. Among those, the connection between the panels by chemical treatment is commonly adopted. Therefore, For an optimized design of the connected part between FRP pannels, a number of direct shear tests have been undertaken in terms of a number of parameters: surface treatment conditions, bonding materials, etc.. As results, surface grinding condition by sand paper or surface treatment by sand blasting appear properly acceptable methods, and epoxy and acryl resins are shown to be effective bonding materials for the purpose in this study.

Evaluation of Behaviors in Abutment Transition Zone Depending on Constrution Orders and Number of Piles (뒤채움 시공순서 및 말뚝 수에 따른 교대 접속부 거동평가)

  • Kim, Ung-Jin;Jeong, Rag-Gyo;Kim, Dae-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.1-7
    • /
    • 2017
  • The RAR (Reinforced Abutment for Railways) is an economical abutment to reduce the settlement of a transitional zone and horizontal displacement of an abutment by constructing backfill before the abutment. In this paper, the performance of the RAR depending on the pile installation was evaluated using 2D (Dimensional) finite element analysis and compared with the existing abutment (with 5 rows pile). Numerical analysis showed that increasing pile installation is more effective in reducing horizontal displacement and earth pressure than settlement of the transitional zone. The horizontal displacement and earth pressure of the RAR was approximately 26~37% and 59~83% compared to the existing abutment by changing the pile installation. More pile installation led to a greater reduction of the horizontal displacement and earth pressure of the RAR. In addition, the horizontal earth pressure of RAR is influenced considerably by the reinforcement, pile, foundation, and stiffness of the ground.

An Experimental Study to Evaluate the Subsidence Stability of Riprap Protection without Filters (필터 없는 사석보호공의 유사이탈로 인한 침하 안정성 평가를 위한 실험 연구)

  • Ji, Un;Yeo, Woon-Kwang;Lee, Won-Min
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.4
    • /
    • pp.445-454
    • /
    • 2008
  • Many countermeasures for local scour at bridge piers constructed on the river and sea have been developed and researched to protect piers against local scour. The most commonly employed method is riprap protection, which is sometimes required the filter installation between riprap and base layers. However, the construction of stone filters are really hard to perform in the field, require the high cost, or sometimes are impossible. The experimental modeling is conducted to analyze the riprap failure modes and the stability of riprap protection without filters based on the different approach velocity and riprap layer thickness conditions. Also, the stability index to evaluate the performance of riprap protection is developed using the experimental results. The cover and thickness of the riprap layer play a very important role in the stability and thicker riprap layers can prevent a total disintegration of the riprap layer effectively, especially due to winnowing failure.

A Study on Thermal Conductivity Properties of Ground Heat Exchangers for GSHP systems (지열냉난방시스템 수직형 지중열교환기 그라우트의 열적 특성에 관한 연구)

  • Baek, Sung-Kwon;Jeon, Joong-Kyu;An, Hyung-Jun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.546-549
    • /
    • 2007
  • 지열 냉난방 시스템의 설계는 냉난방 공간의 크기에 따라 필요한 부하를 계산하여 설계하게된 다. 설계 부하를 충분히 소화할 수 있는 지열교환기의 길이와 보어홀의 깊이 및 개수는 지반의 열적 특성에 크게 좌우된다. 열전도율이 큰 지반일수록 지열교환기 내의 열 흡수 및 소산이 효과적으로 이루어져 지열교환기의 길이도 상대적으로 짧아질 수 있다. 즉, 효율적이고 정확한 설계를 하기 위해서는 지반, 암반 및 지중열교환기의 물리적 특성에 따른 열적 특성을 설계자는 미리 숙지하여야 한다. 현재 국내에서 수직 밀폐형 지중열교환기의 그라우트로 벤토나이트를 가장 많이 사용하고 있으나, 해외의 경우 지중 조건에 따라 시멘트 또는 벤토나이트를 적절히 선택하여 시공하고 있다. 이는 벤토나이트의 특성상 적용 조건이 제약을 받기 때문이며, 특히 지하수가 존재하지 않을 경우 사용이 사실상 불가능하다. 국내에서 이에 대한 충분한 연구는 아직 이루어지지 않았으며, 시멘트 그라우트를 사용하기 위한 물리적, 열적 특성에 대한 연구가 필요한 시점이라 판단하여 본 연구를 수행하였다. 시멘트 그라우트의 경우 수화반응이 일어나는 초기의 건조수축을 최소화하는 배합비로 물성을 구성하였으며, 벤토나이트는 일반 현장 시공 비율을 사용하였다. 열전도율은 첫째 실내 시험으로 시멘트 그라우트에 대한 열판시험법과 벤토나이트 그라우트에 대한 탐침시험법으로 수행하여 구하였으며, 두 번째 방법인 현장 시공으로 직접 현장열응답시험을 수행하여 그라우트 간의 열적 특성을 비교하였다. 또한 기존 시멘트그라우트의 열적 특성을 개량한 코오롱건설에서 개발한 시멘트 그라우트에 대한 열적 거동도 기존 타 그라우트의 열적 거동과 비교하였으며, 개발 제품의 성능이 상당히 우수함을 알 수 있었다.

  • PDF

Evaluation of tunnel face stability based on upper bound theorem (상한치 이론에 근거한 터널 막장의 안정성 연구)

  • Lee, In-Mo;Lee, Jae-Sung;Nam, Seok-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.1
    • /
    • pp.3-11
    • /
    • 2003
  • Face stability of a tunnel is a main concern during tunnel excavation. However, there has been only a few studies on this problem while a lot of researches on the support systems have been carried out. In addition, when tunneling is performed below the groundwater level, the groundwater flows into the tunnel so that the seepage forces generated on the tunnel face might give rise to a serious potential for the face instability. In this study, the face stability was evaluated by simultaneously considering two factors: one is the effective stress calculated by upper bound theorem; the other is the seepage forces acting on the tunnel face obtained by numerical analysis under the condition of steady-state groundwater flow. Tunneling in difficult geological conditions often requires auxiliary techniques to guarantee safe tunnel excavations and/or to prevent damage to structures and services around the tunnel. The steel pipe-reinforced multistep grouting has been recently applied to tunnel sites in Korea. Face stability of a tunnel with the steel pipe-reinforced multistep grouting was also analyzed in this study.

  • PDF

A case Study on Collapse Causes and Restoration of Retaining Wall with Vegetated Concrete Block (식생블록 옹벽의 붕괴원인 및 복구방안에 관한 사례 연구)

  • Hong, Gigwon;You, Seung-Kyong;Yun, Jung-Mann;Park, Jong-Beom;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.105-115
    • /
    • 2016
  • This paper describes a restoration of retaining wall, which was collapsed by rainfall. The failure causes was analyzed by field case, and then the countermeasure was suggested. The failure causes confirmed that observance of design and construction criteria was insufficient. It also was the climate condition like a rainfall and inappropriate construction management. The stability analysis for retaining wall, soil improvement and reinforced earth wall was conducted to confirm validity of the countermeasure. The analysis results showed that the suggested construction method satisfied in required safety factors. Therefore, it should be secured the stability of the structure based on the application of appropriate design method and construction management, when structure was constructed.