• Title/Summary/Keyword: 시공조건

Search Result 1,434, Processing Time 0.037 seconds

Interaction Effect between Caissons by Installation of New Caisson on Existing Caisson Breakwater in Second Order Stokes Wave Condition (비선형 규칙파 조건에서 기존 케이슨 방파제에 신규 케이슨 추가설치에 따른 케이슨들 간의 상호작용 영향 평가)

  • Park, Min Su
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.6
    • /
    • pp.345-356
    • /
    • 2021
  • In order to increase the structural stability of existing caisson breakwater, the design and the construction is carried out by installation of new caissons on the back or the front of old caissons. In this study, we use the ANSYS AQWA program to analyze the wave forces acting on individual caisson according to effects of wave structure interaction when new caissons are additionally installed on existing caisson breakwater. Firstly, the wave force characteristics acting on the individual caisson were analyzed for each period (frequency) in the frequency domain. In time domain analysis, the dynamic wave force characteristics were strongly influenced by the distance between caissons on the frequency at which the unusual distribution of wave forces occurs.

Development of a Simulation Model for Supply Chain Management of Modular Construction based Steel Bridge (모듈러 공법 기반 강교 공급사슬 관리를 위한 시뮬레이션 모형 개발)

  • Lee, Jaeil;Jeong, Eunji;Kim, Sinam;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.3-15
    • /
    • 2022
  • In this study, we develop a simulation model for Supply Chain Management (SCM) of modular construction based steel bridge. To this end, first, Factory Production/Site Construction system data for the steel bridge construction were collected, and supply chain, entities, resources, processes were defined based on the collected data. After that, a steel bridge supply chain simulation model was developed by creating data, flowchart, and animation modules using Arena software. Finally, verification and validation of the model were performed by using animation check, extreme condition check, average value test, Little' s law test, and actual case value test. As a result, the developed simulation model appropriately expressed the processes and characteristics of the steel bridge supply chain without any logical errors, and provided accurate performance evaluation values for the target system. In the future, we expect that the model will faithfully play a role as a performance evaluation platform in developing management techniques for optimally operating the steel bridge supply chain.

A Study on the Chimi of Hwangnyongsa Temple and the Building Condition of Chimi Installed (황룡사 치미와 사용처의 건축조건 연구)

  • Kim, Sookyung
    • Journal of architectural history
    • /
    • v.31 no.6
    • /
    • pp.59-68
    • /
    • 2022
  • This paper is an architectural historical study on Chimi of Hwangnyongsa Temple. In this research, the shape and cross-section of the chimi are reviewed. The results of the study are as follows. The chimi is a form in which the head part facing the maru is omitted, and the upper and lower body are separated. The upper and lower bonds are assembled into a two types of joint throughout the side of the torso, and then bound with an iron strap. Because of the absence of ridge line in the front, and the narrow curved surface which makes the side plate close to the plane, the entire cross-section is triangular, and the rear plate maintains the shape of the chimi. The naerimmaru connected to the side of the chimi has a slope, so it is clear that the chimi was used on the woojingak-jibung(hipped-roof), and the wing part and back of the chimi are erected on the side roof. The height of the yongmaru and chunyeomaru is about the same and the roofing tiles of those are in contact. The roofing tiles of chunyemaru should be cut to fit the angle of the contacting part. The maru is 30 stories high of roofing tiles as a result of the on-board survey. Based on reference on the shape and timing of the production of chimi, the height of chimi, and the maru is believed to have been built before the Unified Silla Period and used in buildings with at least seven-kan frontage. Buildings corresponding to these construction conditions can be seen as Central hall and East hall in Hwangnyongsa temple.

Effect of the Yeongcheon Dam Waterway Tunnel, Korea, on Local Groundwater Levels (영천댐 도수터널 주변지역 지하수위 영향 분석)

  • Gyu-Han Kim;Seong-Woo Moon;Yong-Seok Seo
    • The Journal of Engineering Geology
    • /
    • v.33 no.3
    • /
    • pp.461-474
    • /
    • 2023
  • The study area is located in Hyeonseo-myeon and Andeok-myeon of Cheongsong-gun, Korea around the Yeongcheon dam waterway tunnel, and in this paper, it is analyzed whether the groundwater level is recovered or not compared to groundwater level before waterway tunnel construction by measuring the groundwater level of 156 wells which were installed in areas near and away from the waterway tunnel. From September 2017 to August 2018, the groundwater level of the well was measured at least once a month, and as a result of groundwater level observation survey, the groundwater level of wells distributed in the directly affected zone by the waterway tunnel is relatively lower than that of the indirectly affected zone apart from the waterway tunnel. These results are estimated to be predominantly affected by the effect of waterway tunnel acting on geologic discontinuities rather than by terrain conditions, i.e. groundwater flows being leaked to the waterway tunnel through direct or indirect channels. Continuous monitoring and further investigation will be required to maintain groundwater facilities and preserve groundwater environments in the future.

Earth Pressure Equation Acting on the Cylindrical Diaphragm Wall in a Shaft (원형수직구에 설치된 강성벽체에 작용하는 토압산정방법)

  • Kong, Jin-Young;Shin, Young-Wan;Hwang, Yi-Sung;Chun, Byung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.1
    • /
    • pp.21-29
    • /
    • 2009
  • On plane strain condition, many researchers have investigated the earth pressure according to the shape of wall, and standardized method has been applied to the design of the retaining wall. But on cylindrical diaphragm wall, at-rest earth pressure has been generally used. Even though this method is on conservative side, it may lead to over-design. In this paper, the application of convergence confinement method to the calculation of the earth pressure acting on the cylindrical diaphragm wall of a shaft was suggested. In addition, a model test was carried out to investigate the distributions of earth pressure. Model test results show that the earth pressures of diaphragm wall are about 1.4 times larger than active earth pressure and about 0.8 times less than at-rest earth pressure.

Model Tests for the Damage Assessment of Adjacent Buildings in Urban Excavation (흙막이굴착에 따른 인접건물의 손상평가에 대한 모형실험연구)

  • Kim, Hak-Moon;Hwang, Eui-Suk
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.10
    • /
    • pp.121-131
    • /
    • 2007
  • This study is to investigate the damage assessment of adjacent structures due to excavation in urban environment. Model tests were carried out for 2 story masonry building and frame structures in various shapes and locations. The damage level of adjacent structures were very differently estimated in accordance with the shape ratio (L/h) of structures, construction stages, and various locations. Therefore the most weak part (bay) of structure must be heavily instrumented and monitored in more details at early stage of constructions. The progressive crack development mechanism at various construction stages was revealed through model tests and crack size indicated more conservative side of damage level on the damage level graph.

A Study on the Evaluation of the Loads Acting on the Pillar in Two-Arch Tunnel (2-Arch 터널 중앙벽체 작용하중 산정에 관한 연구)

  • Oh, Gyoo-Chul;Chun, Byung-Sik;Do, Jong-Nam
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.11
    • /
    • pp.5-14
    • /
    • 2007
  • In this study, Matsuda formula used to evaluate the loads acting on the pillar was investigated and load reduction factor(${\alpha}$) was evaluated by numerical analysis to better apply for the design. From the results, normal stress was concentrated to one side due to excavation of preceding tunnel after construction of pillar. And 86.5% of maximum normal stress was revealed partly unequally when the ground was poor. By numerical analysis, $14{\sim}83%$ of total loads calculated by Matsuda formula decreased and then, from these results, load reduction factor(${\alpha}$) was estimated. From now on, stability and economic aspects could be guaranteed by applying the load reduction factor(${\alpha}$).

Stability Test of Stone Mattress Method by Real-scale Hydraulic Experiment (스톤매트리스 공법의 실규모 수리 안정성 실험)

  • Kim, Sung Jung;Kim, Myoung Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.223-223
    • /
    • 2021
  • 호안은 유수로부터 제방과 하안을 보호하는 구조물로 태풍 또는 집중호우로 인한 홍수로부터의 안정성이 확보되어야 한다. 적정한 호안공법 또는 제품의 선정을 위해서는 유속, 소류력 등이 반영된 수리 안정성 검토가 필요하나 현재 국내에는 이와 관련한 객관적인 평가나 시험 기준이 제시되어있지 않기 때문에 국내에서는 실제 수리실험을 통한 호안제품 및 공법의 수리학적 안정성을 제공하는 경우는 찾아보기 어려운 것이 현실이다. 본 연구는 호안공법 중 친환경적 재료를 사용하여 개발된 스톤매트리스 호안공법의 수리적 안정성을 검토하기 위해 수행되었다. 스톤매트리스 공법은 상부망과 하부망의 체결을 통해 돌을 군체로 일체화 시킴으로써 치수 안정성이 매우 뛰어나며, 충분한 식생공간을 확보한 공법으로 재료의 2차 변형 방지가 가능하며 안전한 군체 유지가 가능한 공법이다. 이러한 공법에 대한 안정성 검토를 위한 실규모 실험은 안동 하천연구센터에서 수행하였다. 실험에 사용된 수로는 8°의 경사를 갖는 급경사수로에서 수행되었다. 수로의 제원은 폭 3m, 길이 30m 의 직사각형 형태의 직선수로로 이루어져 있다. 시험체는 실규모로 제작되며 2m × 10m 의 제원을 갖는 별도의 트레이에 시공되어 실험시 크레인을 이용하여 실험수로에 안착시킨다. 수리 안정성 실험은 실험대상유량을 단계별로 나누어 점차적으로 증가시키며, 시험체의 이탈, 파괴 등의 큰 변화가 발생하였을 경우 실험을 종료한다. 수리량 측정은 유속측정, 수위관측 등으로 이루어지며, 재료의 변형은 3D스캐너를 이용하여 변위를 검토하였다. 총 3회에 걸친 실험결과 실험수로에서 발생가능한 최대유량인 4.34cms 조건에서 실험체 바닥에서의 소류력은 약 300N/m2 의 소류력이 발생하는 것으로 확인되었다. 또한 재료의 수직변위는 최대 1.8mm로 계측기 오차범위에 근접한 수치를 보이는 것으로 실험체의 이동이나 석재의 파손은 발생하지 않은 것으로 나타났다.

  • PDF

Study on New Concept Flood Barrier Technology against Storm Surge (해일대비 신개념 침수방어벽 기술 개발에 대한 연구)

  • Kim, Jiho;Park, Youngjin;Lee, Gyuwon;Kim, Byunghun;Chang, Jungsoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.343-343
    • /
    • 2020
  • 본 연구는 해안 및 도서지역에서 기후변화에 따라 재해위험이 증가되고 있으므로 '해일대비 신개념 침수방어벽 기술 개발'을 통해, 침수방어벽을 ICT와 연계하여 국민의 재산과 생명을 보호할 수 있도록 하는 연구이다. 이를 위해 국내·외 침수방어벽 자료를 조사하여 연구방향을 설정한 후, 국내·외 침수방어장치에 대한 개선방안을 제시하고자 한다. 기존 침수방어벽의 경우 ICT와 연계되어 있지 않아서 침수 예보나 경보 상황에 대응할 수 없는 실정이었다. 본 연구에서는 ICT 연계 방안을 제시하여 침수에 즉각적으로 대응할 수 있도록 함으로써 국민의 재산과 생명을 보호할 수 있도록 하고자 한다. 본 연구에서는 제시된 ICT 연계 침수방어벽에 대한 설치 대상지 검토 및 사업 대상 후보지를 선정하고, 조건별 수치모의(SWMM, 3D flow, FEM 등)를 통해 능력 검토를 수행하고자 한다. 향후 침수방어벽 시제품을 제작하면서 구조적인 안정성을 확보하도록 하였다. 침수센서의 경우 지주식으로 침수방어벽과 일체형으로 하고, 투명 침수방어벽의 경우 유리에 직접 디스플레이가 가능하도록 하였다. 본 연구에서는 기존에 보유하고 있는 직립형 고무보와 투명 홍수방어벽 기술에 대하여 재질과 구동방식, 시공성, 경제성, 유지관리 용이성 등을 재검토하여 해안 및 도서지역에 적합한 침수방어벽 기술에 대한 시제품과 운영시스템을 개발하고자 하며, 이를 통해 국민의 재산과 생명을 보호하고, 국내 물 시장에서 침수를 방지하여 국민경제에 기여할 수 있으며, 향후 ODA 사업에서 홍수예·경보 및 구조적 대책 분야에 진출하여 수출증대 효과를 얻을 수 있을 것이다.

  • PDF

Debris Yield Prediction of Gangwon Mountain Region in Korea (강원 산간지역의 토석유출량 예측)

  • Kwon, Hyuk Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.182-182
    • /
    • 2020
  • 최근 지구 온난화나 기상이변으로 인해 세계각지에서 많은 자연재해가 발생하고 있고 우리나라도 최근 전국 각지에서 국지성호우에 의한 많은 피해가 발생하고 있다. 특히 국지성호우로 인해 발생하는 산간지역의 토석류는 많은 재산피해를 일으키고 있다. 최근 토석, 토사, 혹은 부유 잡목 등의 유출로 인한 피해를 막기 위해 많은 사방댐을 축조하고 있으나 표면침식에 의해서 유출되는 토석량 혹은 토사량을 정확히 예측하지 못한다면 축조된 사방댐은 금방 제구실을 못할 수 있거나 혹은 과대 설계 및 시공되어 건설비를 낭비할 수 있다. 따라서 최적의 사방댐 건설을 위해 정확한 토석량의 산정은 매우 중요한 전제조건이라 할 수 있다. 본 연구에서는 강원도 인제군 산간지역 4곳의 사방댐유역에 대해 토석량 예측모형 MSDPM(Multi-Sequence Debris Prediction Model)과 LADMP(Los Angeles District Method for Prediction of sediments yield)를 이용하여 산정한 토석량과 실제 준설량을 비교하였다. 이를 위해 강원 산간지역에 맞도록 예측모형을 보정하였으며 토석류 유발 강우강도(Threshold Maximum 1-hr Rainfall Intensity)와 토석류 유발 최소강우량(Total Minimum Rainfall Amount)개념을 도입하여 예측모형식을 적용하였다. 위 식이 갖고 있는 대표적 특징 중 하나인 산불계수를 사용해야 하지만 본 연구지역은 산불 피해규모가 미미하여 산불의 영향은 고려하지 않고 토석량을 산정하였다. 두 예측모형의 계산결과와 실제 준설량을 비교해본 결과, MSDPM의 결과가 LADMP의 결과보다 준설량과 더 일치하는 것으로 나타났다. 실제 준설량과 MSDPM의 계산결과는 평균 17.37%의 차이를 나타냈고 LADMP의 계산결과는 평균 41.87%의 차이를 나타냈다. 본 연구에서 사용된 토석량 예측 모형은 앞으로 많은 산지유역의 토석량 예측에 사용이 가능 할 것으로 판단된다. 하지만 본 연구에서 사용된 자료의 제한성 때문에 앞으로 많은 실측 준설자료를 통하여 예측모형식을 보정하는 작업이 우선되어야 할 것으로 판단된다. 이를 위해서 많은 산지유역의 토석량을 장시간 실측하여 데이터를 축적하고 이를 사용하여 다양한 토석량 예측모형을 검보정하는 노력이 필요할 것으로 판단된다.

  • PDF