• Title/Summary/Keyword: 시공시스템

Search Result 1,771, Processing Time 0.027 seconds

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

초대형 작업공간의 환기시스템 시공사례

  • 최충현;신승서
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.33 no.12
    • /
    • pp.24-31
    • /
    • 2004
  • 조선조 작업장 및 자동차 조립공장과 같은 초대형 작업공간의 작업환경을 개선시키기 위한 환기시스템 시공사례에 대해서 설계, 시공, 성능검증 및 완공으로 이어지는 일련의 진행과정을 소개하고자 한다.

  • PDF

Development and Reliability Verification of Quality Control System for Compaction Grouting Method (컴팩션 그라우팅 공법의 품질관리 시스템 개발 및 신뢰성 검증)

  • Seo, Seok-Hyun;Lee, Jung-Sang;Jung, Eui-Youp;Park, Sang-Yeong;Lee, Hyo-Bum
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.4
    • /
    • pp.11-20
    • /
    • 2020
  • This study introduced the compact grouting method that can be used for improving soft ground and restoring buildings with unequal subsidence. The pump used in the traditional compact grouting method is a system that injects one hole each, which reduces the construction efficiency, and the analog injection method manually manages the construction by field workers, making it difficult to manage consistent quality. Pump and quality control system were developed to solve problems in existing construction. Since field supervisor determines amount of injected materials by using analog equipment and controls manually, it is difficult to manage consistent quality of construction. Therefore, the quality control system was developed in order to solve that problem. The quality control system consists of automatic mixing system of injection materials, multiple simultaneous injection pumps, and injection management monitoring system. Performance of the quality control system was verified through on-site testing, and ground improvement performance was verified through quality testing after testing and testing of the compact grouting method. Therefore, it is expected that the integrated quality control system developed will improve the quality assurance and efficiency and stability of construction at sites where construction and quality verification are difficult.

Automatic Monitoring for Structural Response of a Large-Scale Irregular Building under Construction (대형 비정형 건축물의 시공 중 구조반응 자동 모니터링)

  • Choe, Se-Un;Park, Hyo-Seon
    • Computational Structural Engineering
    • /
    • v.29 no.2
    • /
    • pp.12-17
    • /
    • 2016
  • 본 기사에서 대형 비정형 건축물의 시공 중 자동 모니터링 사례를 소개하였다. 소개한 사례에서는 무선 자동 계측 시스템을 이용하여 변형률계, 경사계, 변위계 등이 총 88개 설치되어 약 13개월 동안 장기 모니터링이 수행되었다. 무선 자동 계측시스템은 장기간의 데이터를 확보하고 데이터 간의 상관성 및 이력분석을 용이하게 하였다. 이를 통해 대상 구조물의 시공 중 안전성 및 안정성을 확보하고, 정밀 시공을 구현하는데 기여할 수 있었다.

Analysis of the Impact of the Expansion of Direct Construction Works and Suggestions on the Application (직접시공 확대의 영향 분석 및 직접시공의무제도 적용을 위한 대응방안 제언)

  • Lee, Meesung;Kim, Siyeon;Yu, Ilhan;Han, Ju-yeon;Son, JeongWook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.15-23
    • /
    • 2021
  • As the construction production system is reorganized as part of the construction industry innovation plan, direct construction is expanding. According to this trend, this study analyzed the impact and problems of the expansion of direct construction through the position of the construction industry and a study of foreign cases. In addition, by diagnosing the impact of the measures to expand direct construction from various aspects, countermeasures were suggested to suitably apply the direct construction mandatory system. Also, for each alternative, effects and problems were evaluated through interviews with experts in policy/administrative and architecture fields. The alternatives for expanding and improving the efficiency of the direct construction mandatory system derived from this study are four items: granting the discretion of the client, differentiation by scale of construction, utilization of construction guarantee system, and introduction of flexible working group leader system. As a result of the expert interview, all of them were evaluated to have a positive impact directly and indirectly on the expansion of direct construction. This study contributes literature to the application of the direct construction mandatory system by examining the current status of direct construction, and suggests a direction for expanding direct construction through deduction of alternatives for applying the direct construction mandatory system and expert evaluation.

A Fundamental Study on the Automated Formwork System for Bridge Pier Unmanned Construction (교각 무인시공 자동화 거푸집 시스템 구성을 위한 기초 연구)

  • Lee, Jae Heun;Yoon, Hyejin;Kim, Young Jin;Chin, Won Jong;Lee, Sang Yoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.5
    • /
    • pp.707-717
    • /
    • 2024
  • Recently, the implementation of unmanned and automated technologies has been actively considered as a solution to reduce safety accidents in industrial sites. However, bridge construction sites are recognized as a more challenging area for research and development compared to other industries due to the complexity of the site, such as weather and terrain, and the fact that the work is not repetitive or standardized. In this paper, a formwork system for unmanned and automated construction of bridge piers, which are considered high-risk work environments due to tasks such as rebar assembly, concrete pouring, and formwork dismantling and assembly at high altitudes, was developed. To achieve this, the formwork was equipped with motorized spindles and an automated lifting system to replace the manual dismantling and assembly process. Additionally, manipulators were installed on the upper work platform to replace workers in tasks such as rebar assembly and concrete pouring. To verify the proposed technology, we aimed to demonstrate the feasibility of the automated formwork system for unmanned pier construction through an assembly test.

Development of Automatic PBD Construction Quality Measurement System for Soft Ground Improvement (연약지반 개량을 위한 PBD 시공품질 자동측정시스템 개발)

  • Kim, Min-Ho;Mun, Sang-Don;Kim, Hang-Young;Kim, Tae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.2
    • /
    • pp.605-610
    • /
    • 2011
  • Soft ground improvement is essential to enhance strength of ground for construction in reclaimed land or shore. There are many method of soft ground improvement, and vertical drain method was widely used in many countries including korea. As vertical drain method is to plant many Prefabricated Vertical Drains in soft ground, it promotes consolidation and enhances strength. The PBD(Plastci Board Drain) that is excellent economy and workability was widely used in many countries as Prefabricated Vertical Drains. Construction quality of PBD is affected installation depth, pressure, perpendicularity. This paper describes the system developed that can automatically measure installation depth, pressure and perpendicularity for PBD. This system can reduce fraction defective of construction by auto faulty alarm and keeps the safety of operator by auto control system.

Applicability Evaluation of Mobile Mapping System for Road Construction Surveying (도로 시공측량을 위한 모바일맵핑시스템의 적용성 평가)

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.169-175
    • /
    • 2022
  • Korea's construction industry has a shortage and aging of construction manpower, low productivity compared to other industries, and a high rate of industrial accidents. The Ministry of Land, Infrastructure and Transport is preparing for the 4th industrial revolution and is expanding investment in construction automation and innovative growth engines to improve productivity in the construction industry. In order for new technologies to be utilized in the road construction field, the accuracy of the technologies and the applicability of each type of work must be evaluated. In this study, the accuracy of the mobile mapping system was tried to verify based on the relevant work regulations, and to suggest the applicability of the mobile mapping system to high-speed driving tracks through data acquisition and analysis on road construction sites. The accuracy of the equipment used in the study was verified in accordance with the relevant work regulations, and the possibility of applying the mobile mapping system used for the study to road construction surveying was presented with a maximum error of less than 10cm in the horizontal and vertical directions. In addition, the possibility of utilizing the road construction survey using the mobile mapping system was presented through comparison with the existing method for data acquisition time for construction surveying, production of construction status survey results, and calculation of heatmap and earthworks. In the future, the use of construction status surveying of the mobile mapping system will greatly improve the efficiency of construction work.