• Title/Summary/Keyword: 시공사

Search Result 621, Processing Time 0.022 seconds

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

Development of an Equipment Operating System for Effective Earthwork Operations (효율적인 토공작업을 위한 건설장비 운영시스템 개발)

  • Ahn, Seo-Hyun;Kim, Sung-Keun;Lim, So-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.153-166
    • /
    • 2017
  • Recently, the construction industry has been pursuing economical construction by introducing improved construction equipment and methods. However, in many cases, the equipment operation according to the intuition of the field manager and in the manner of traditional methods impedes the increase in effectiveness in terms of productivity and economy. The performance of new construction equipment has rapidly improved; however, the maximum effect of mechanized construction cannot be obtained unless the effective management and operation methods are implemented. According to the expert survey, it has been discovered that the problems of conventional construction equipment operation methods can be classified into several categories: allocation of construction equipment that is not suitable for the construction work, the combination of equipment that does not take into consideration real-time field situations, the decline in the skill of the construction equipment drivers, and lack of real-time access to necessary information. This paper proposes a construction equipment management system to solve these problems. The construction equipment management system can provide a method to maximize the work rate of the construction equipment fleet by developing an equipment allocation plan based on field conditions, whenever necessary, and transferring this information to the construction equipment drivers in real time. Ultimately, it is believed that the application of the construction equipment operation system in the field will make it possible to reduce carbon emissions by improving productivity and reducing fuel consumption.

USN Technologies Decision Making Matrix for the Efficiency Management of Earthwork Selection (효율적인 토공사 계측관리를 위한 USN기술 선정 의사결정 매트릭스 도출)

  • Jung, Seung-Woo;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.55-62
    • /
    • 2011
  • Recently, construction work has diversified and become larger. So, a systematic measurement and management measures are required. In this study, USN technology which is one of the most important network technologies was selected. Based on elements derived from comparison of each element of standard was calculated according to the importance of the elements. The importance of the decision to support the proposed model is explained by integrating the importance of each criteria and decision-support model by considering the situation and creating a matrix of considerations for the construction of earthwork. The results of this study show that USN technology in the context of judging criteria can be selected for the earthwork.

An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business) (해외건설시장 진출을 위한 건설사의 Pre-construction Service 핵심역량 분석)

  • Byun, Il-Woo;Kim, Ye-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.80-90
    • /
    • 2012
  • In 2011, the overall construction markets in KOREA are highly depressed due to decreases in orders of domestic construction markets in both private and public field. Also, we are losing competitive advantages over Chinese and Indian companies owing to the market shares on plant construction projects excessively. It is recognizable, under the circumstances that we are in interior position on high value technique to other advanced countries, that the orders of mega building and plant construction projects tend to be placed through the" Pre-construction Service", the importance of which has been emphasized domestically and internationally in recent time. However, current domestic construction companies show scarcity in understanding the general idea of the Pre-construction Service and fail in building proper structure of it. It is obvious that they cannot have any competent strategy to deal with Pre-construction Service. The Purpose of this paper is to analyze the core competence throughout preconstruction phase and, and make up for the weakness in the current pre-construction service process.

A Study on the Effect and Improvement Direction of the Credit Rating of Large Construction Firms by the Reinforced Real Estate Regulations and the Raising of the Base Rate (정부 부동산규제 강화와 기준금리 인상이 대형건설사 신용등급에 미치는 영향과 개선방향에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.90-102
    • /
    • 2018
  • In preparation of the increase in the domestic debts and the rise in the US interest rate, the Korean government has started to strengthen the regulation on the property market since 2017. So, it is likely that the sales in the domestic construction market would be decreased. Even in the overseas plant projects market, as there has been the continuous increase in the cost and the resulting increase in the losses, it looks hard for the large construction companies to keep their credit ratings as they are now. This study is designed to check Korean government's property policy and any possible problems caused by the overseas and domestic economic environment, which include the property market policy, interest rate, rise in the property price and lackluster sales in housing market. It showed the change in the credit ratings by finding out the sales, work capability, sales in non-governmental projects, operating profits and PF contingency liabilities. For this study, the questionnaires were sent to 30 practical experts to analyze the effect of the risk factor on the outside credit rating of large construction companies.

On the Topographies and Recovery of Vegetation in the Hillside Erosion Control Districts (산복사방공사시공지(山腹砂防工事施工地)에 있어서 지형(地形)과 식생회복(植生回復))

  • Kang, Wi Pyung
    • Journal of Korean Society of Forest Science
    • /
    • v.64 no.1
    • /
    • pp.42-46
    • /
    • 1984
  • This study was carried out to obtain the advanced basic data for hillside erosion control works. Recovery of vegetation in the hillside erosion control districts depends on various factors i.e., topographies, soil qualities, rain conditions and erosion control methods. The only relations between topographies and vegetation coverage were surveyed, since the other factors were equal in all those surveyed areas. The results obtained are summarized as follows; 1) Mean coverage values were decreased in order of 80%, 78.7%, 64.0% and 56.5%r in concave slope, uniform slope, compound slope and convex slope respectively. The mean coverage of all aspects was 69.8%. The slope pattern have a influence on formation of coverage. 2) Moisture ratio in soil and mean slope have an effect on the mean coverage value. 3) In the beginning of the hillside erosion control working, coverage (14.8%) by arbor species was too low comparing with that by herb. 4) It is more desirable to recover regetation by artificial planting or seed planting than by the natural vegetation in the barren hillside. In the beginning of the hillside erosion control working, it is difficult to expect vegetation recovery by natural species.

  • PDF

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

EPC Plant Project Lessons Learned Utilization Analysis (EPC 플랜트 프로젝트의 성공/실패사례 활용도 분석)

  • Yang, Sihoon;Kang, Taek-Ki;Cho, Young Duk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.39-47
    • /
    • 2021
  • As domestic construction companies, which used to be concentrated in the Middle East, have expanded their overseas orders to new markets in Asia and Latin America, they have to cope with various conditions. The EPC plant project, which undertakes construction projects such as civil engineering and construction, design, purchase, construction and commissioning, has expanded its scope. As a result, it is important to collect Lessons Learned from the previous project, systematize it, and use it to respond to changes in the environment. However, many employees do not share their skills or experiences voluntarily. To do so, it is necessary to create and systematize a culture that shares experience and technology. In order to understand and analyze the current situation, a questionnaire was conducted on the EPC project-related departments of construction companies implementing the EPC plant project. About 74% of the participants said Lessons Learned's collection and utilization helped. About 53% of the people who collected and registered actual cases and 39% of the people who had experience in preventing problems using cases were identified as employees' perception and utilization of Lessons Learned systems. Detailed analysis showed differences in workplace, duties, and rank. Through this study, the current status of Lessons Learned collection and utilization of EPC plant projects is understood, and the research on collection and utilization improvement is being carried out.

Flexible Unit Floor Plan of Off-Site Construction Housing Considering Long-Lasting Housing Certification System (장수명주택 인증을 고려한 OSC공법 주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun;Roh, Jeong-Yeol;Kwon, Soo-Hye;Kim, Seung-Mo
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.103-117
    • /
    • 2021
  • With the current rapid changes in population and technology, the long-lastig housing certification system is a means of prolonging the physical and functional lifespan of a building. The certification requires differentiation between the structure and infill elements to allow for variability and ease of repairs. This works well with prefabricated houses so this study investigated the possibility of applying the long-lastig housing certification requirements to apartment construction using off-site construction (OSC) methods focused on the installation of bathrooms (plumbing and toilet) that differ from the traditional wet method. This study examined three different sized floor plans at 22 m2, 46 m2, and a combined one resulting in 69 m2. The larger 69 m2 plan utilized a removeable non-load bearing wall to increase flexibility in the layout of the floorplan. The apartments are constructed of steel reinforced concrete composite columns on a 9 m × 10.5 m grid with integrated slabs. The exterior and interior infill walls are all non-load bearing with some containing plumbing. This separation of the structure and infill walls can help meet some of the criteria in the long-lastig housing certification, particularly with the ease of repairs. Technologies that facilitate the replacement of infill elements that contain plumbing and other building services can benefit the nation by reducing carbon emissions and therefore tax incentives should be introduced to increase the adoption of the proposed construction methods.

Overseas - Parametric DesignVIII (해외건축동향: 미국 - 파라메트릭 디자인VIII)

  • Sung, Woojae
    • Korean Architects
    • /
    • s.566
    • /
    • pp.92-97
    • /
    • 2016
  • 지난 두 회에 걸쳐 흔히 사람들이 이야기하는 파라메트릭 디자인의 전형에 가까우며 현재의 건축 및 시공 기술로 충분히 구현이 가능한 두 예를 살펴보았습니다. 조금 지루하다고 여기셨을 분들을 위해 앞으로 몇 회간은 시뮬레이션(simulation)에 대해 이야기를 해 볼까 합니다. 시뮬레이션은 단어가 의미하는 것처럼 실제의 현상을 모방하는 과정을 의미하며 이미 많은 분야에서 다양한 목적을 위해 사용되고 있습니다. 쉽게 머릿속에 떠오르는 시뮬레이션은 아마도 영화나 컴퓨터 게임에서 자연현상이나 물리적 법칙에 의한 사물의 거동 등을 본뜨고자 하는 목적의 특수효과를 위한 시뮬레이션, 과학자들이 자연의 현상의 이해 및 예측, 혹은 가설의 검증 등을 위해 사용하는 시뮬레이션, 엔지니어들이 물체의 물리적 화학적 거동을 시험해 보기 위해 사용하는 시뮬레이션 등이 아닐까 생각합니다. 시뮬레이션은 기본적으로 어떠한 현상에 대한 이해를 바탕으로 그러한 현상을 만들어 내는 법칙을 찾아내어 이를 디지털 모델화 하여야 합니다. 몇 회 전에 말씀드렸던 것처럼, 실험에 실험을 거듭하여 가장 영향력이 큰 변수를 찾아내고 미처 이해하지 못한 변수들을 보강하기 위해 도입하는 상수 등으로 이러한 과학적인 법칙을 도출하게 됩니다. 싸고 막강한 성능의 컴퓨터 및 데이터 저장방법 등을 등에 업은 빅 데이터(Big Data)를 통한 방법론이 이미 통계 및 확률의 분야에서 전통적인 알고리듬에 바탕을 둔 시뮬레이션에 우위를 점하고 있는 상황이긴 하지만, 개인적인 생각으로는 항상 다른 분야에 비해 기술적으로 한발 뒤쳐질 수밖에 없는 건축의 보수적인 속성 및 좀 더 많은 것에 대해 컨트롤을 하고 싶어 하는 많은 건축인들의 애착 등을 고려해 보았을 때 건축에서의 시뮬레이션이라는 영역은 아직도 알아야할 가치가 많다고 생각됩니다.

  • PDF