Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.242-245
/
2003
Most engineering tasks require collaboration between many users in major hospital Construction Projects that have many risks. Loss of cost and change orders occurred in factors such as information exchange, misunderstandings, advanced Technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. Each part of the major hospital construction projects have been rapidly changed technology of equipments. Therefore it is a major challenge to make a high level of communication and to have mutual understanding. The objective of this paper is to reduce risks for the design process and construction process of hospital projects.
The Journal of Korean Institute for Practical Engineering Education
/
v.3
no.2
/
pp.1-10
/
2011
The ultimate goal of architecture is to construct a building through design and supervision. According to this circumstance, architectural education divided into two part ; design and construction. However, these two processes have to be one program for better education. In this aspect, steel housing program could be a desirable one because of its structural(bearing wall) system and relative short construction schedule. In KUT architectural program, steel housing has been one of the most effective and important for about ten years. In this research, the contents(s/w) and running process of this program and practice lab(h/w) will be introduced with detail. And this study could be a good guideline for a better combination program with theory and practice in architectural engineering field.
Journal of the Korea Institute of Building Construction
/
v.16
no.6
/
pp.553-560
/
2016
Wage is a very important issue not only for the workers' current living but also for the future laboring landscape. As of 2014, it is reported that about 290,000 workers suffer from delay in payment of wage. The construction industry is particularly labor-intensive, which implies that delay in payment of wage is a serious problem. Despite this fact, in terms of the delayed payment of wage most studies have been conducted on the improvement of a system to resolve delayed payment in exclusion of labor workers' awareness and thinking. Thus, the purpose of this study is to understand construction labor' awareness and analyze the effectiveness of the resolution step of the delayed payment of wage based on construction labors' awareness. In the research result, more than 30 percent of all construction labors and managers are never aware of the settlement procedure of the delayed payment, and it appears that the resolution step system needs to be greatly improved. In conclusion, it is expected that this study will be utilized as fundamental data for the settlement procedure of the delayed payment, and the influence of delayed payment on construction labors' safety behavior and productivity should be further studied in the future.
Journal of the Korea Institute of Building Construction
/
v.20
no.4
/
pp.367-373
/
2020
As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.
Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
Journal of the Korea Institute of Building Construction
/
v.16
no.2
/
pp.151-159
/
2016
Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.
Journal of the Korea Institute of Building Construction
/
v.15
no.2
/
pp.249-255
/
2015
The competition of construction market is keener, so construction companies are seeking the methods for improving the performance. Construction field organizations and managers should have an innovative behavior to improve the performance. However, construction field organizations and managers are negative to innovation because they are generally conservative. Therefore, the purpose of this study is to analyze the factors to influence the innovative behavior of building construction field managers. In this study, self-leadership, feedback seeking behavior and job involvement are selected the factors to influence the innovative behavior by literature reviewing. The results of correlation analysis showed that the behavior-focused strategies in self-leadership and the job involvement influence the innovative behavior of building construction field managers. In addition, the individual characteristics such as marriage, experience, position and type of employ influence the innovative behavior of their. This study is expected to help to improve the performance management system in construction field organizations.
Journal of the Korea Institute of Building Construction
/
v.15
no.2
/
pp.227-235
/
2015
For last decade, the number of foreign workers in all industries has been increased continuously. In the construction industry, the number of foreign workers has also increased as 80,000 persons in 2010. According to the increase of foreign workers at domestic construction sites, the frequency of construction disasters has increased as well. The safety education can be a effective solution to decrease the construction disaster. So, it is necessary to develop the appropriate education system for foreign workers. Therefore, the objective of this study is to propose a safety education model for foreign workers and to develop the prototype system. In a result of that, a new safety education model and prototype system was constructed based on the method of E-learning. The system can support for foreign workers in domestic construction sites to understand the safety education easily. And, it can also assist the safety manager to educate and manage the foreign workers efficiently.
Kim, Chang-Duk;Park, Hye-Sin;Lee, Mun-Jae;Yu, Jeong-Ho
Korean Journal of Construction Engineering and Management
/
v.7
no.5
/
pp.53-63
/
2006
Since 2005, the government began to introduce and promote a new project delivery system, BTL(Build, Transfer, and Lease), in order to provide high level of public services for the upgraded quality of life and to boost the domestic and local construction economy. However, the lack of experiences in the new system by the constituents from diverse economic sectors brought a number of drawbacks from each constituent's perspective such as improperly low earning rate, excessive expenses for preparation of the project proposal, imbalanced regulations, heavy cost and procedures to establish SPC, the ineffective structure of the consortium, the short-term oriented evaluation criteria for the selection and so forth. These drawbacks turned out to be obstacles for the successful BTL projects. Hence, this paper analyzes the above issues and conducts the interviews with the professionals from the diverse sectors in order to propose the changes to resolve those for the improvement and finally to deliver the successful BTL projects for the diverse public owners.
Journal of the Korea Institute of Building Construction
/
v.14
no.2
/
pp.150-155
/
2014
The success of construction projects is heavily dependent on the work ability of the field managers who manage the execution of projects. The work ability of field managers is influenced by various elements such as job stress and individual characteristics. The purpose of this study is to reveal the factors influencing the work ability of construction field managers in Korea. Work ability is evaluated bases on the Work Ability Index(WAI) developed by the Finnish Institute of Occupational Health, while job stress is measured using the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency. The results showed that field managers under higher job stress have lower work abilities. In addition, it is revealed that exercise or religious practice have a positive influence on work ability. This study will help to increase the work ability and enable the efficient management of organization at building construction sites.
Kim, Yun-Sik;Cho, Jae-Kyong;Kim, Min-Ji;Cho, Kyu-Man;Hyun, Chang-Taek
Journal of the Korea Institute of Building Construction
/
v.10
no.2
/
pp.33-40
/
2010
Recently, the scale of construction work has been growing, and buildings are becoming higher. To enable greater efficiency of construction work, the use of vertical transportation equipment has been radically increasing. In this context, many studies have been conducted on tower cranes. While these studies have discussed issues such as the selection of tower cranes, the optimization of locations, and the hoisting time of tower cranes, there has been no research on the installation of tower cranes. As such, the installation of tower cranes on construction sites has been accomplished based on subjective judgment and technical assistance, and the experience of workers in equipment companies. Therefore, this study analyzes the productivity of tower cranes using simulation methodology, and proposes a generalized model of the installation process of tower cranes in order to offer a basic resource that site managers can directly utilize.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.