• Title/Summary/Keyword: 수행성 검증

Search Result 6,652, Processing Time 0.033 seconds

Welfare Interface using Multiple Facial Features Tracking (다중 얼굴 특징 추적을 이용한 복지형 인터페이스)

  • Ju, Jin-Sun;Shin, Yun-Hee;Kim, Eun-Yi
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.45 no.1
    • /
    • pp.75-83
    • /
    • 2008
  • We propose a welfare interface using multiple fecial features tracking, which can efficiently implement various mouse operations. The proposed system consist of five modules: face detection, eye detection, mouth detection, facial feature tracking, and mouse control. The facial region is first obtained using skin-color model and connected-component analysis(CCs). Thereafter the eye regions are localized using neutral network(NN)-based texture classifier that discriminates the facial region into eye class and non-eye class, and then mouth region is localized using edge detector. Once eye and mouth regions are localized they are continuously and correctly tracking by mean-shift algorithm and template matching, respectively. Based on the tracking results, mouse operations such as movement or click are implemented. To assess the validity of the proposed system, it was applied to the interface system for web browser and was tested on a group of 25 users. The results show that our system have the accuracy of 99% and process more than 21 frame/sec on PC for the $320{\times}240$ size input image, as such it can supply a user-friendly and convenient access to a computer in real-time operation.

Development of a New Lumped-Mass Stick Model using the Eigen-Properties of Structures (구조물의 동적 고유특성을 이용한 새로운 집중질량모델 개발)

  • Roh, Hwa-Sung;Youn, Ji-Man;Lee, Hu-Seok;Lee, Jong-Seh
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.16 no.4
    • /
    • pp.19-26
    • /
    • 2012
  • For a seismic design or performance evaluation of a structure, an experimental investigation on a scale model of the structure or numerical analysis based on the finite element model is considered. Regarding the numerical analysis, a three-dimensional finite element analysis is performed if a high accuracy of the results is required, while a sensitivity or fragility analysis which uses huge seismic ground motions leads to the use of a lumped-mass stick model. The conventional modeling technique to build the lumped-mass stick model calculates the amount of the lumped mass by considering the geometric shape of the structure, like a tributary area. However, the eigenvalues of the conventional model obtained through such a calculation are normally not the same as those of the actual structure. In order to overcome such a deficiency, in this study, a new lumped mass stick model is proposed. The model is named the "frequency adaptive-lumped-mass stick model." It provides the same eigenvalues and similar dynamic responses as the actual structure. A non-prismatic column is considered as an example, and its natural frequencies as well as the dynamic performance of the new lumped model are compared to those of the full-finite element model. To investigate the damping effect on the new model, 1% to 5% of the critical damping ratio is applied to the model and the corresponding results are also compared to those of the finite element model.

Development of Efficient Seismic Analysis Model using 2D T-Shape Rigid-body for Wall-Frame Structures with a Central Core (이차원 T형강체를 이용한 중심코어를 가진 전단벽-골조 구조물의 효율적인 지진해석모델 개발)

  • Park, Yong-Koo;Lee, Dong-Guen;Kim, Hyun-Su
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.1
    • /
    • pp.9-17
    • /
    • 2013
  • In this study, an efficient analytical model for the dynamic analysis of tall buildings with a shear wall-frame structural system has been proposed. A shear wall-frame structural system usually consists of a core wall showing flexural behavior and a frame presenting shear behavior. Therefore, the deformed shape of the shear wall-frame structural system is shown by the combination of flexural mode and shear mode. These characteristics should be considered when an efficient analytical model is developed. To this end, the effect of shear wall and frame on the dynamic behavior of a tall building with a dual system has been separately investigated. In this study, the structural characteristics of a separated individual shear wall model and the frame model without shear wall has been evaluated. In order to consider the effect of the shear wall in the frame model without shear wall, a rigid body was used instead of the shear wall. Each equivalent model for the separated shear wall part and frame part has been independently developed and two equivalent models were then combined to create an efficient analytical model for tall buildings with a shear wall-frame structural system. In order to verify the efficiency and accuracy of the proposed method, time history analyses of tall buildings with a shear wall-frame system were performed. Based on analytical results, it has been confirmed that the proposed method can provide accurate results, requiring significantly reduced computational time and memory.

틸트로터 비행체 개발추세와 고속 VTOL기 개발경쟁

  • An, Oh-Sung
    • Current Industrial and Technological Trends in Aerospace
    • /
    • v.5 no.1
    • /
    • pp.75-92
    • /
    • 2007
  • 2002년 프론티어사업의 일환으로서, 10년간 1200억의 예산으로 미래형 신개념비행체 기술개발사업을 시작한 스마트무인기사업은, $2002{\sim}2003$년 수행한 개념연구를 통해 미래형 신개념 고속 수직이착륙 항공기 개념으로서 틸트로터 개념을 선정하고 이의 개발에 매진하고 있다. 사업단에서는 우선, 항공 선진국에서 지난 반세기 동안 시행한 다양한 비행체 개념연구결과에 대해 자체적인 비교 분석 및 국제공동 연구를 근간으로하여, 당시 틸트로터에 필적하는 가능성을 보였던 스탑트로터(보잉사), 복합자이로콥터(카터콥터사) 개념이 아닌, 틸트로터 비행체의 기술개발을 결정하게 되었다. 각각의 비행체 개념이 갖는 위험성과 도전성, 그리고 소요기술, 설계특성, 개발 위험도 등에 대한 면밀한 분석을 기초로 한 사업단의 체계적 의사결정은 주효했다. 스탑트로터개념은 비행시험의 잇단 실패와 지연/잠정 중단사태가 이어졌고, 복합자이로콥터 또한 잇단 비행사고로 2002년 기록한 148kts를 능가하는 고속성능 시현에 지금까지 실패함으로써, 실용화 가능한 고속수직이착륙기로서의 검증을 위해서는 해결해야할 기술적 과제가 많이 남아있음을 보여주고 있다. 반면, 틸트로터 개념의 경우 V-22의 설계 수정형에 대한 성공적인 비행시험완료 및 인증획득으로 전면양산승인이 2005년 결정되어 458대가 (미해병대(360), 해군(48), 공군(50)) 납품될 예정이고, 2010년 인증획득을 목표로 민수용으로 개발중인 BA609의 순조로운 비행시험진행, 무인기로 개발된 Eagle Eye 기술시현기의 비행 시험성공과 2003년 미 해양경찰청으로부터 Deep Water 프로그램의 장거리 순찰임무 주력기종 선정과 같이 군용, 상용, 무인용 고속 수직이착륙 시장의 전 방위적 진입이 현실화되고 있다. 이에 따라 항공업계의 반응은 2가지 방향으로 나뉘고 있다. 하나는 유럽의 ERICA 프로그램과 같이 틸트로터 기술 개발을 서두르자고 주장하는 방향이고, 다른 하나는 시콜스키의 X2 프로그램과 같이 틸트로터와는 차별화된 독자적인 고속 수 직이착륙 비행체 개념 개발을 시도하는 것이다. 이러한 배경으로 국내 독자적인 기술력으로 지난해까지 일구어낸 성공적인 스마트무인기 상세설계 종료 및 축소형 비행체 전환비행성공은 그 의의가 매우 크다고 할 수 있다. 본 논문은 틸트로터 개발사를 통해, 신개념 비행체 개발의 어려움과 교훈을 알아보고, 세계에서 2번째로 틸트로터 기술을 개발하고 있는 스마트무인기 사업의 현황과 기술적 특징 및 의의의 정리, 그리고 틸트로터의 대안으로 진행중인 새로운 고속 VTOL 비행체 연구현황에 대한 소개 와 간단한 기술적 평가를 포함시켰다.

  • PDF

Summer Precipitation Forecast Using Satellite Data and Numerical Weather Forecast Model Data (광역 위성 영상과 수치예보자료를 이용한 여름철 강수량 예측)

  • Kim, Gwang-Seob;Cho, So-Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.7
    • /
    • pp.631-641
    • /
    • 2012
  • In this study, satellite data (MTSAT-1R), a numerical weather prediction model, RDAPS (Regional Data Assimilation and Prediction System) output, ground weather station data, and artificial neural networks were used to improve the accuracy of summer rainfall forecasts. The developed model was applied to the Seoul station to forecast the rainfall at 3, 6, 9, and 12-hour lead times. Also to reflect the different weather conditions during the summer season which is related to the frontal precipitation and the cyclonic precipitation such as Jangma and Typhoon, the neural network models were formed for two different periods of June-July and August-September respectively. The rainfall forecast model was trained during the summer season of 2006 and 2008 and was verified for that of 2009 based on the data availability. The results demonstrated that the model allows us to get the improved rainfall forecasts until lead time of 6 hour, but there is still a large room to improve the rainfall forecast skill.

Study on Improvement Plan through Appropriateness Analysis of Standard of Survey Cost (측량대가 기준의 적정성 분석을 통한 개선방안 연구)

  • Han, Soohee;Lee, Byoungkil;Lee, Yong Wook
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.3
    • /
    • pp.211-222
    • /
    • 2020
  • The purpose of this study is to derive a plan to improve the standard of survey cost, which is a system for estimating survey cost operated by the National Geographic Information Institute. The current standard has not been revised significantly since the initial enactment. However, in the situation where the survey industry is getting worse, the actualization of the standard is an urgent task for training engineers and industrial development. In this study, in order to break the problems of the standard and to derive improvement plan, we analyzed the outline, basic characteristics, and history of the standard and compared it with similar domestic ones. We collected opinions from the government and the industry through a survey, and verified labor cost and overhead rates. The conclusions are as follows. First, it is necessary to complement standard for production rate that directly affects direct cost, and to compensate for the missing items in the direct cost. Second, when compared with cost standards in foreign countries and cadastre field, the labor cost in survey field was found to be very low and improvement is needed. Third, the overhead rates were assessed to be appropriate, and the problem of improper overhead design should be coped with by strengthening education and promotion. Fourth, it is necessary to consider the introduction of deliberation committee or standard market price system for rapid response to new technologies.

Fundamental Study on the Strength Development of Cement Paste using Hardening Accelerator and High-Early-Strength Cement (경화촉진제와 조강시멘트를 사용한 시멘트 페이스트의 강도발현에 대한 기초적 연구)

  • Min, Tae-Beom;Cho, In-Sung;Lee, Han-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.407-415
    • /
    • 2013
  • The purpose of this research is to verify the performance of hardening accelerator in cement paste through mechanical performance evaluation and micro structure analysis on hardening accelerator for development of super high early strength concrete. The research results showed that hardening accelerator produced $Ca(OH)_2$ when hydrated with cement, enhancing the degree of saturation of Ca ion by using differential thermal analysis. Moreover, porosity was reduced rapidly as capillary pores were filled by hydration products of $C_3S$. According to the experiment using hydration measurement testing, when 1% and 3% of accelerator were mixed, hydration rate increased toward the second peak point compared to high early strength cement, before the first peak point disappeared. It turned out that adding accelerator accelerated the hydration rate of cement, especially $C_3S$. The shape of C-S-H is shown depending on the amounts of accelerator added and the production and age of $Ca(OH)_2$ by using SEM to observes hydration products. Therefore, it's evident that hardening accelerator used in this research increases amounts of $Ca(OH)_2$ and accelerates $C_3S$, it is effective for the strength development on early age.

Problem Analysis and Improvements Plans for PF ABCP of Apartment Housing Development Projects (공동주택 PF ABCP의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Soo-Yeol;Hwang, Uk-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.133-142
    • /
    • 2011
  • The purpose of this study is to analyze the problems of the parties involved in the issuance of apartment housing development projects. The adapted research method selected four apartment housing development as PF ABCP projects. This study carried out the case about participant institution of PF ABCP funding project including developer, constructor, financial institution so as to draw problems by participant institution. On the basis of the selected case, this thesis proposes methods for involved parties to negotiate and work out problems of the PF ABCP. The results of this study are as follows 1) Launching long-term project financing should be developed, including operating funds and strengthen the ABS and ABCP issuance of credit assessment procedures, combined with the simplicity of the instruments. 2) The Low-risk contract for the construction of simple managerial focus should be the construction, financial institutions essentially dependent on project financing feasibility verification purpose loans to prevent the division a true story, the development should be of interest to be preserved. The proposed included, among other, partial guarantee based on the construction plan financial institutions' share-based investment, and the supplement of legal issues.

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

Estimating Stand Volume Pinus densiflora Forest Based on Climate Change Scenario in Korea (미래 기후변화 시나리오에 따른 우리나라 소나무 임분의 재적 추정)

  • Kim, Moonil;Lee, Woo-Kyun;Guishan, Cui;Nam, Kijun;Yu, Hangnan;Choi, Sol-E;Kim, Chang-Gil;Gwon, Tae-Seong
    • Journal of Korean Society of Forest Science
    • /
    • v.103 no.1
    • /
    • pp.105-112
    • /
    • 2014
  • The main purpose of this study is to measure spatio-temporal variation of forest tree volume based on the RCP(Representative Concentration Pathway) 8.5 scenario, targeting on Pinus densiflora forests which is the main tree species in South Korea. To estimate nationwide scale, $5^{th}$ forest type map and National Forest Inventory data were used. Also, to reflect the impact of change in place and climate on growth of forest trees, growth model reflecting the climate and topography features were applied. The result of the model validation, which compared the result of the model with the forest statistics of different cities and provinces, showed a high suitability. Considering the continuous climate change, volume of Pinus densiflora forest is predicted to increase from $131m^3/ha$ at present to $212.42m^3/ha$ in the year of 2050. If the climate maintains as the present, volume is predicted to increase to $221.92m^3/ha$. With the climate change, it is predicted that most of the region, except for some of the alpine region, will have a decrease in growth rate of Pinus densiflora forest. The growth rate of Pinus densiflora forest will have a greater decline, especially in the coastal area and the southern area. With the result of this study, it will be possible to quantify the effect of climate change on the growth of Pinus densiflora forest according to spatio-temporal is possible. The result of the study can be useful in establishing the forest management practices, considering the adaptation of climate change.