• Title/Summary/Keyword: 수위-유량 관계곡선식

Search Result 178, Processing Time 0.03 seconds

Evaluation of flood frequency analysis technique using measured actual discharge data (실측유량 자료를 활용한 홍수량 빈도해석 기법 평가)

  • Kim, Tae-Jeong;Kim, Jang-Gyeong;Song, Jae-Hyun;Kim, Jin-Guk;Kwon, Hyun-Han
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.5
    • /
    • pp.333-343
    • /
    • 2022
  • For water resource management, the design flood is calculated using the flood frequency analysis technique and the rainfall runoff model. The method by design flood frequency analysis calculates the stochastic design flood by directly analyzing the actual discharge data and is theoretically evaluated as the most accurate method. Actual discharge data frequency analysis of the measured flow was limited due to data limitations in the existing flood flow analysis. In this study, design flood frequency analysis was performed using the measured flow data stably secured through the water level-discharge relationship curve formula. For the frequency analysis of design flood, the parameters were calculated by applying the bayesian inference, and the uncertainty of flood volume by frequency was quantified. It was confirmed that the result of calculating the design flood was close to that calculated by the rainfall-runoff model by applying long-term rainfall data. It is judged that hydrological analysis can be done from various perspectives by using long-term actual flow data through hydrological survey.

Calibration and Validation of SWAT Model for Long Term Simulation of Runoff and Sediment Transport at the Nakdong River Basin (낙동강유역의 장기 유역 유출 및 유사 모의를 위한 SWAT 모형의 검보정)

  • Lee, Eun-Jung;Jang, Eun-Kyung;Kim, Tae-Keun;Hwang, Man-Ha;Kwon, Yong-Sung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.881-881
    • /
    • 2012
  • 낙동강유역에는 4대강 사업으로 8개의 보가 낙동강 본류에 새롭게 설치되었으며, 따라서 상류로부터 유입되는 유사가 보상류에 퇴적되어 하천제방이나 하천구조물의 안전을 위협할 수 있다. 또한 홍수시에는 농경지의 매몰과 저수지의 퇴적현상이 발생하는 등 유역유사에 의한 다양한 문제가 발생할 수 있으며, 강우로부터 유출되는 유사는 강우사상에 따라 빠르게 변할 수 있으나 수체에 즉각적인 영향을 유발하지 않을 경우 만성적인 특성으로 인해 침전물을 계속 이동시키며 축적되는 문제가 발생한다. 따라서 이러한 문제를 사전에 예측하고 낙동강유역에 대한 유역유사관리 대책마련을 마련하기 위해 유역유출과 유사의 이송 및 퇴적양상을 분석하여 유역관리를 위한 자료를 구축할 필요가 있다. 이러한 기초자료 분석을 위해 활용되는 유역모형 중 SWAT(Soil and Water Assessment Tool) 모형은 장기간 유역 유출로 인한 유사 모의를 수행하는데 가장 많이 활용되는 모형이며, 미국 농무성 농업연구소(USDA Agricultural Research Service, ARS)의 Jeff Amold 등에 의해 개발된 모형이다. SWAT 모형은 장기유출 및 유사 발생에 대한 시 공간적 변화를 모의하는 모형으로 넓은 범위의 유역에 대해 일단위 모의 간격으로 최대 100년까지 모의가 가능한 장기유역 모의에 최적화된 모형이다. 본 논문에서는 SWAT 모형을 이용하여 낙동강유역의 장기 유역 유출 및 유사 모의를 수행하기위해 2004년에서 2009년까지의 유출량 자료와 유량-유사량관계곡선 등을 이용하여 본류 및 지류 유출구 주요지점에 대해 검보정을 수행하고자 한다. 모의의 정확도 향상을 위해 안동댐, 임하댐, 영천댐, 합천댐, 남강댐, 밀양댐 및 낙동강 본류 등 총 7개 유역으로 구분하여 SWAT 모형을 구축하였으며, 각 유역별로 유출량과 유사량에 대하여 각각 보정 및 검증을 수행하였다. 낙동강 본류유역 총 7개의 댐 방류량자료와 20개의 대형하수종말처리장 방류량자료를 이용한 낙동강유역의 유출량 보정 및 검증 결과, 모의치가 실측치를 잘 반영하고 있는 것으로 나타났다. 또한 총 11개 지점의 수위관측소에 대해 유사량 측정 성과를 이용한 유사량 보정 및 검증 결과, 강우시 유사량 모의값은 유출량-유사량관계곡선 식을 잘 반영하였으나, 비강우시에는 모의값이 관계곡선 식의 결과값보다 대체적으로 높게 나타났다.

  • PDF

Runoff Characteristics Change of a Basin under Urbanization (도시화 진행에 따른 유역 유출특성 변화에 관한 연구)

  • Son, Kwang-Ik;Kim, Min-Chol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.4
    • /
    • pp.89-93
    • /
    • 2010
  • It is well known that the drastic change of hydrological characteristics of an urbanized basin causes severe runoff, sediment yield, and peak flow. High vulnerability of urban flood disasters is caused by land-use change and development of a basin. A typical site suffering urbanization was selected and the experimental site has being operated last three years. Hydrological and hydraulic characteristics of the urbanizing basin were examined by observation of runoff, sediment loads and precipitation with T/M. The effects of land-use change were analyzed by examination of the hydrological characteristics, such as run-off ratio (runoff volume/rainfall volume), sediment yields. Runoff coefficient of rational equation was increased as basin was urbanized. Suspended sediment yields due to a urban development activities were raised almost 10 times compare to undisturbed condition for small runoff less than 1 cms. Meanwhile, no big change could be detected for bed loads.

Development and assessment of pre-release discharge technology for response to flood on deteriorated reservoirs dealing with abnormal weather events (이상기후대비 노후저수지 홍수 대응을 위한 사전방류 기술개발 및 평가)

  • Moon, Soojin;Jeong, Changsam;Choi, Byounghan;Kim, Seungwook;Jang, Daewon
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.11
    • /
    • pp.775-784
    • /
    • 2023
  • With the increasing trend of extreme rainfall that exceeds the design frequency of man-made structures due to extreme weather, it is necessary to review the safety of agricultural reservoirs designed in the past. However, there are no local government-managed reservoirs (13,685) that can be discharged in an emergency, except for reservoirs over a certain size under the jurisdiction of the Korea Rural Affairs Corporation. In this case, it is important to quickly deploy a mobile siphon to the site for preliminary discharge, and this study evaluated the applicability of a mobile siphon with a diameter of 200 mm, a minimum water level difference of 6 m, 420 (m2/h), and 10,000 (m2/day), which can perform both preliminary and emergency discharge functions, to the Yugum Reservoir in Gyeongju City. The test bed, Yugum Reservoir, is a facility that was completed in 1945 and has been in use for about 78 years. According to the hydrological stability analysis, the lowest height of the current dam crest section is 27.15 (EL.m), which is 0.29m lower than the reviewed flood level of 27.44 (EL.m), indicating that there is a possibility of lunar flow through the embankment, and the headroom is insufficient by 1.72 m, so it was reviewed as not securing hydrological safety. The water level-volume curve was arbitrarily derived because it was difficult to clearly establish the water level-flow relationship curve of the reservoir since the water level-flow measurement was not carried out regularly, and based on the derived curve, the algorithm for operating small and medium-sized old reservoirs was developed to consider the pre-discharge time, the amount of spillway discharge, and to predict the reservoir lunar flow time according to the flood volume by frequency, thereby securing evacuation time in advance and reducing the risk of collapse. Based on one row of 200 mm diameter mobile siphons, the optimal pre-discharge time to secure evacuation time (about 1 hour) while maintaining 80% of the upper limit water level (about 30,000 m2) during a 30-year flood was analyzed to be 12 hours earlier. If the pre-discharge technology utilizing siphons for small and medium-sized old reservoirs and the algorithm for reservoir operation are implemented in advance in case of abnormal weather and the decision-making of managers is supported, it is possible to secure the safety of residents in the risk area of reservoir collapse, resolve the anxiety of residents through the establishment of a support system for evacuating residents, and reduce risk factors by providing risk avoidance measures in the event of a reservoir risk situation.

Comparison of physics-based and data-driven models for streamflow simulation of the Mekong river (메콩강 유출모의를 위한 물리적 및 데이터 기반 모형의 비교·분석)

  • Lee, Giha;Jung, Sungho;Lee, Daeeop
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.6
    • /
    • pp.503-514
    • /
    • 2018
  • In recent, the hydrological regime of the Mekong river is changing drastically due to climate change and haphazard watershed development including dam construction. Information of hydrologic feature like streamflow of the Mekong river are required for water disaster prevention and sustainable water resources development in the river sharing countries. In this study, runoff simulations at the Kratie station of the lower Mekong river are performed using SWAT (Soil and Water Assessment Tool), a physics-based hydrologic model, and LSTM (Long Short-Term Memory), a data-driven deep learning algorithm. The SWAT model was set up based on globally-available database (topography: HydroSHED, landuse: GLCF-MODIS, soil: FAO-Soil map, rainfall: APHRODITE, etc) and then simulated daily discharge from 2003 to 2007. The LSTM was built using deep learning open-source library TensorFlow and the deep-layer neural networks of the LSTM were trained based merely on daily water level data of 10 upper stations of the Kratie during two periods: 2000~2002 and 2008~2014. Then, LSTM simulated daily discharge for 2003~2007 as in SWAT model. The simulation results show that Nash-Sutcliffe Efficiency (NSE) of each model were calculated at 0.9(SWAT) and 0.99(LSTM), respectively. In order to simply simulate hydrological time series of ungauged large watersheds, data-driven model like the LSTM method is more applicable than the physics-based hydrological model having complexity due to various database pressure because it is able to memorize the preceding time series sequences and reflect them to prediction.

Development and Assessment of Flow Nomograph for the Real-time Flood Forecasting in Cheonggye Stream (청계천 실시간 홍수예보를 위한 Flow Nomograph 개발 및 평가)

  • Bae, Deg-Hyo;Shim, Jae Bum;Yoon, Seong-Sim
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.11
    • /
    • pp.1107-1119
    • /
    • 2012
  • The objectives of this study are to develop the flow nomograph for real-time flood forecasting and to assess its applicability in restored Cheonggye stream. The Cheonggye stream basin has the high impermeability and short concentration time and complicated hydrological characteristics. Therefore, the flood prediction method using runoff model is ineffective due to the limit of forecast. Flow nomograph which is able to forecast flood only with rainfall information. To set the forecast criteria of flow nomograph at selected flood forecast points and calculated criterion flood water level for each point, and in order to reflect various flood events set up simulated rainfall scenario and calculated rainfall intensity and rainfall duration time for each condition of rainfall. Besides, using a rating curve, determined scope of flood discharge following criterion flood water level and using SWMM model calculated flood discharge for each forecasting point. Using rainfall information following rainfall scenario calculated above and flood discharge following criterion flood water level developed flow nomograph and evaluated it by applying it to real flood event. As a result of performing this study, the applicability of flow nomograph to the basin of Cheonggye stream appeared to be high. In the future, it is reckoned to have high applicability as a method of prediction of flood of urban stream basin like Cheonggye stream.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Analysis of Runoff Characteristics for a Small Forested Watershed Using HYCYMODEL - At a watershed in Mt. Palgong - (물순환(循環)모델에 의한 산지소유역(山地小流域)의 유출특성(流出特性) 분석(分析) - 팔공산유역(八空山流域)을 대상(對象)으로 -)

  • Park, Jae Chul;Lee, Heon Ho
    • Journal of Korean Society of Forest Science
    • /
    • v.89 no.5
    • /
    • pp.564-575
    • /
    • 2000
  • This study was carried out to reveal characteristics of long-term runoff by using HYCYMODEL in a small forested watershed. From May to September in 1998 and in 1999, the fitness of HYCYMODEL and runoff characteristics were estimated by HYCYMODEL using rainfall and discharge at the experimental watershed. The function of stage and discharge in the experimental watershed was determined as following equation $Q=11.148H^{2.5867}$($R^2=0.9956$). From May to September in 1998 and in 1999, the runoff rates were 57.7% in 1998 and 87.1% in 1999 at the experimental watershed. The discharge was assumed to be increased because of rainfall intensity difference and thinning. By applicability test, the HYCYMODEL showed good estimation of runoff by optimized fifteen parameters. Comparing runoff characteristics before and after thinning by calculating through HYCYMODEL, direct runoff and base runoff increased 4%, 7%, respectively as evapotranspiration decreased 11%. Parameters $D_{50}$ and $K_h$, which were related to the direct run, and a parameter $K_u$, which was related to the baseflow, were assumed to indicate that forest was changed by the effect of thinning and weathering process of bed rock.

  • PDF