• Title/Summary/Keyword: 수압면적

Search Result 25, Processing Time 0.028 seconds

A Study on the Cell Structure for Capacitive Deionization System (축전식 탈염 시스템을 위한 셀 구조에 관한 연구)

  • Lee, Ju-Young;Seo, Seok-Jun;Park, Jung-Woo;Moon, Seung-Hyeon
    • Korean Chemical Engineering Research
    • /
    • v.48 no.6
    • /
    • pp.791-794
    • /
    • 2010
  • This study presents channel design of a CDI stack to achieve high removal efficiency in a large scale by applying parallel flow structure with a concentrated stream. The flow pattern in the stack was simulated by COMSOL Multiphysics program. To prove the salt removal performance, a unit cell and 20 cell stacks were tested at a flow rate condition of 18 ml/min and 360 ml/min, respectively. The removal efficiencies of the unit cell and the 20 cell stacks were obtained as 70.8 % and 75.6 %, respectively, with 100 mg/L sodium chloride solution. During the operation of cell test, water pressures of unit cell and 20 cell pair stack maintained in the ranges of 1.1 psi and 1.3~1.5 psi, respectively. It was demonstrated that the parallel cell structure with two concentrated streams can be employed in a large scale CDI for salt removal.

Application of Ultrasonic Energy to Accelerate Consolidation of Soft Ground (연약지반 압밀 촉진을 위한 초음파 에너지의 활용)

  • Park, Ji-Ho;Hwang, Jung-Ha;Shim, Seong-Hyeon;Kim, Young-Uk
    • Proceedings of the KAIS Fall Conference
    • /
    • 2008.05a
    • /
    • pp.139-141
    • /
    • 2008
  • 최근 우리나라는 국토면적을 넓히기 위하여 많은 지역에 준설 및 매립 공사를 수행하고 있다. 준설 및 매립공사 시 주재료로 사용되는 해성점토는 매립 초기에 매우 연약한 지반을 형성하게 된다. 이에 빠른 구조물 시공을 위하여 대상지반의 압밀을 촉진시키는 다양한 공법이 활발히 연구되고 있다. 본 연구는 새로운 압밀촉진 공법개발을 위한 기초시험으로써 초음파 에너지를 연약지반 처리에 활용하고자 자체 고안된 초음파 발생장치를 적용하여 소규모 및 대형시험을 수행하였다. 시험에 사용된 연약 지반 점토시료는 시험조건의 일관성을 유지하기 위하여 자체개발한 원심력 시료 성형기를 사용하였다. 초음파 적용에 따른 압밀시험결과 매우 큰 압밀량의 증가를 확인할 수 있었으며 대형 시험의 경우에도 빠른 간극수압의 소산을 확인 할 수 있었다. 연구결과 초음파가 점토의 압밀시간을 단축시키는데 효과가 크다는 것을 볼 수 있었고, 차후 초음파를 통한 다양한 압밀촉진공법이 개발될 수 있다는 가능성을 확인 할 수 있었다.

  • PDF

A Case study and Analysis on the Up-Lift Pressure Treatment Evaluation of Underground Installations for their Efficient Adoption (사례분석을 통한 효율적 상향수압(Up-Lift Pressure) 처리공법 적용방안에 관한연구 - ◯◯ 상업지역 현장사례 중심으로 -)

  • Ko, Ok-Yeol;Kwon, Oh-Chul;Shim, Jae-Kwang;Park, Tae-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.119-129
    • /
    • 2009
  • Building construction trends have been changed dramatically in terms of size and mass. With the need to maximize land usage, there has been an increase in the construction of high-rise buildings. This affects not only the entire construction duration and cost, but also subsequent construction activities, such as work to increase underground facilities and in reclamation land area construction. These types of site conditions require soft ground reinforcement and the proper uplift water pressure treatment. In general, two kinds of methods have been used for uplift water pressure treatment systems. However, there have been some problems arising as the result of a lack of research and analysis on underground construction techniques, and a reliance on experiments over actual survey and analysis of site conditions. This paper focused on the problems of conventional selection procedure, by analyzing drawings and proposing a kind of modeling for a reasonable procedure. The results were applied to OO project as a sample construction case to be verified in this research. The initial plan in the case project was the Rock Anchor System. However, as there were terrible miscalculations of basic site conditions that had an extraordinary influence on the underground water level, such as the site's proximity to the Han-river, it was necessary to change the plan to include apermanent drainage system. This achieved a direct construction cost reduction \ 406,702,000 and a maximum sayings of 4% of operational cost, based on the 50-year building Life Cycle Cost.

A Study on Continuous long-term Wave Observation using Remote Monitoring System (원격모니터링을 이용한 연속파랑관측에 관한 연구)

  • Shin, Bumshick
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.1
    • /
    • pp.654-659
    • /
    • 2018
  • In this study, continuous long-term observation is implemented with an ocean radar. Ocean radar conducts remote observation (combined) with ground-based radars, which enable a series of simultaneous observations of an extensive range of the coast with high frequency. An ocean radar for continuous long-term observation is operated at Samcheok on the east coast of Korea. Samcheok experienced tsunami damage in recent years and is the location of a nuclear power plant. In order to examine the reliability of the ocean radar, a pressure-type wave gauge, ultrasonic wave gauge, and ocean buoy are installed for the purpose of data comparison and verification. The ocean radar used in this study is an array-type HF-RADAR named WERA (WavE RAdar). The analysis of the data obtained from continuous long-term observations showed that the radar observations were in agreement with more than 90% of the wave data collected within a 25 km range from the center of two sites. Less than 1% of the entire observation data was unmeasured by the time series analysis. As a result of comparing the radar data with the direct observations made by the wave gauge, it was inferred that the RMS deviation is less than 20cm and the correlation coefficient was in the range of 0.84 ~ 0.87. Moreover, supported by such observations, a comprehensive monitoring system is being developed to provide the public with real-time reports on waves and currents via the internet.

Application of Ultrasonic Energy to Fast Consolidation of Soft Clays (연약지만 압밀 촉진을 위한 초음파 에너지의 활용)

  • Park, Ji-Ho;Hwang, Jung-Ha;Kim, Young-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.4
    • /
    • pp.1039-1042
    • /
    • 2008
  • Dredged fills have been widely used to secure a land for the engineering activities. Before the useful application of the area, the soils should be consolidated to acquire the aquate shear strength. Several research projects have attempted to develop a method fur accelerating the consolidation of soft clay. Our study examined the effect of ultrasonic energy on the consolidation of soft clay, Tests were conducted using specially designed and fabricated equipment that was capable of directly applying ultrasonic energy to soil samples during consolidation tests. The specimens were prepared from slurry using a centrifuge facility, and tests were conducted at various levels of ultrasonic power and treatment time. The study showed that ultrasonic energy had a considerable effect on consolidation time, suggesting that ultrasound can be used to reduce the consolidation time of soft clay.

A Study on the Stability of Subsidence for the Foundation of Rectangular Pyramid (사각 피라미드 기초의 침하 안정성에 관한 연구)

  • Kim, Seong-Pil;Kim, Doo-Hwan;Song, Kwan-Kwon;Lee, Ki-Sun;Kim, Jeong-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.2
    • /
    • pp.83-89
    • /
    • 2018
  • In this study, the settlement of concrete rectangular pyramid foundation on soft ground is investigated based on a finite element analysis. considering the grounding load and the grounding area of square pyramid foundation, we compensate the insufficient design bearing capacity and investigated the effect of settlement by load. Based on this study, it is found that the rectangular pyramid foundation shows the smallest settlement of three different type of foundations. As a result of this study, it was resulted that the square pyramid foundations were more effective than the crushed stone foundations by 18%. These results show that the ground pressures of the square pyramid bases are divided into horizontal and vertical stresses, so it is analyzed that the horizontal stress builds up the rigid ground on the foundation of the structure and distributes the load widely to increase the resistance to the overhead load.

Performance Test of Hypocenter Determination Methods under the Assumption of Inaccurate Velocity Models: A case of surface microseismic monitoring (부정확한 속도 모델을 가정한 진원 결정 방법의 성능평가: 지표면 미소지진 모니터링 사례)

  • Woo, Jeong-Ung;Rhie, Junkee;Kang, Tae-Seob
    • Geophysics and Geophysical Exploration
    • /
    • v.19 no.1
    • /
    • pp.1-10
    • /
    • 2016
  • The hypocenter distribution of microseismic events generated by hydraulic fracturing for shale gas development provides essential information for understanding characteristics of fracture network. In this study, we evaluate how inaccurate velocity models influence the inversion results of two widely used location programs, hypoellipse and hypoDD, which are developed based on an iterative linear inversion. We assume that 98 stations are densely located inside the circle with a radius of 4 km and 5 artificial hypocenter sets (S0 ~ S4) are located from the center of the network to the south with 1 km interval. Each hypocenter set contains 25 events placed on the plane. To quantify accuracies of the inversion results, we defined 6 parameters: difference between average hypocenters of assumed and inverted locations, $d_1$; ratio of assumed and inverted areas estimated by hypocenters, r; difference between dip of the reference plane and the best fitting plane for determined hypocenters, ${\theta}$; difference between strike of the reference plane and the best fitting plane for determined hypocenters, ${\phi}$; root-mean-square distance between hypocenters and the best fitting plane, $d_2$; root-mean-square error in horizontal direction on the best fitting plane, $d_3$. Synthetic travel times are calculated for the reference model having 1D layered structure and the inaccurate velocity model for the inversion is constructed by using normal distribution with standard deviations of 0.1, 0.2, and 0.3 km/s, respectively, with respect to the reference model. The parameters $d_1$, r, ${\theta}$, and $d_2$ show positive correlation with the level of velocity perturbations, but the others are not sensitive to the perturbations except S4, which is located at the outer boundary of the network. In cases of S0, S1, S2, and S3, hypoellipse and hypoDD provide similar results for $d_1$. However, for other parameters, hypoDD shows much better results and errors of locations can be reduced by about several meters regardless of the level of perturbations. In light of the purpose to understand the characteristics of hydraulic fracturing, $1{\sigma}$ error of velocity structure should be under 0.2 km/s in hypoellipse and 0.3 km/s in hypoDD.

A Study on Sewage Characteristics in Hanam City (하남시 오수발생특성에 대한 연구)

  • Choi, Gye-Woon;Hyun, Ji-Hwan;Lee, Ho-Sun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1317-1322
    • /
    • 2005
  • 하수관거 설계시나 단지개발사업, 그리고 하수관거정비사업과 같이 오수처리시설의 적정 규모 결정을 위해서는 정확한 상수사용량 및 오수발생량 원단위가 요구되지만 국내의 경우 이러한 원단위에 대한 기초자료 부족과 자료의 신빙성 결여로 인해 적정 원단위를 결정하는데 어려움이 있다. 이러한 관점에서 단지개발이 이루어지는 도시에서는 도시의 규모, 입지조건, 기후조건, 생활양식 등 다양한 요인들이 고려된 오수발생패턴 및 발생량 조사가 필요하며, 조사된 원단위는 오수처리시설의 적정 규모 결정뿐 아니라 침입수/유입수 분석 및 하수관거정비에 대한 성과예측에도 활용될 수 있다. 본 연구에서는 현재 단지개발 및 하수관거정비사업이 진행중인 하남시의 표본이 될 수 있는 대표구역을 선정하고 그 지역에서 조사지역을 세부적으로 분류하여 각 지역별 오수발생특성을 분석하였다. 대상지역인 하남시는 총면적의 $97\%$가 자연녹지 및 생산녹지이며, 나머지 $3\%$는 일반주거지역 및 일반 상업지역으로 나뉜다. 그리고 도시계획상 공장지역으로 편성된 부분이 없어 앞으로도 하남시 대부분의 면적이 녹지와 주거/상업지역으로 구성될 것이다. 이러한 하남시의 특성을 고려하여 조사지역은 공장지역을 제외한 일반주거지역, 밀집주거지역, 영업지역으로 분류하였으며 이렇게 분류된 지역은 각각 오수발생패턴 및 오수농도에 대한 조사를 실시하여 오수발생특성을 분석하였고, 조사지역별 인구수 조사와 연계하여 원단위 자료를 추출하였다. 이렇게 조사된 자료들을 통해 침입수/유입수 분석에 요구되는 오수전환율, 야간생활하수량 비율을 산정하였으며, 차후 단지개발 및 관거정비 후에 발생하는 오수 발생특성과 비교분석을 통하여 하남시 지역의 오수발생특성에 대한 신뢰성 있는 자료로 활용될 것으로 기대된다. RMA2 모형을 이용하여 충주댐에서의 물의 흐름을 해석한 결과 옥순대교$\~$청풍대교 구간 사이에 댐 및 지형적 영향으로 인해 잘 발달된 와류가 하도 전체를 통하여 발생되고 있었고 이는 댐 부유물 정체현상이 나타나는 지점과 잘 일치하고 있었다.정함 후 감마분석에 의하여 구하였다. CF:CS 연령모델을 적용한 결과 깊이에 따른 supported $^{210}Pb$와 퇴적 속도는 0.91cm/year 인 것으로 산정 되었다.RS is a more advanced content-based image retrieval system than other systems which support only concepts or image features.방하는 것이 선계기준에 적합한 것으로 나타났다. 밸브 개폐에 따른 수압 변화를 모의한 결과 밸브 개폐도를 적절히 유지하여 필요수량의 확보 및 누수방지대책에 활용할 수 있을 것으로 판단된다.8R(mm)(r^2=0.84)$로 지수적으로 증가하는 경향을 나타내었다. 유거수량은 토성별로 양토를 1.0으로 기준할 때 사양토가 0.86으로 가장 작았고, 식양토 1.09, 식토 1.15로 평가되어 침투수에 비해 토성별 차이가 크게 나타났다. 이는 토성이 세립질일 수록 유거수의 저항이 작기 때문으로 생각된다. 경사에 따라서는 경사도가 증가할수록 증가하였으며 $10\% 경사일 때를 기준으로 $Ro(mm)=Ro_{10}{\times}0.797{\times}e^{-0.021s(\%)}$로 나타났다.천성 승모판 폐쇄 부전등을 초래하는 심각한 선천성 심질환이다. 그러나 진단 즉시 직접 좌관상동맥-대동맥 이식술로 수술적 교정을 해줌으로써 좋은 성적을 기대할 수 있음을 보여주

  • PDF

Determination of the Size of Surge Tank with Partition (격벽을 갖는 조압수조의 크기 결정)

  • Kim, Kyoung Ho;Yang, Hai Ryong;Oh, Hyun Sik;Lee, Ho Jin
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.159-159
    • /
    • 2011
  • 수자원 공급의 시 공간적 편차가 큰 우리나라에서는 수자원을 이용하기 위해서 다수의 댐을 건설하고 있다. 특히, 생활수준의 향상으로 용수 수요가 급증하였기 때문에 용수가 부족한 곳에는 광역상수도 사업 등을 통하여 용수를 공급하고 있다. 댐에서 용수가 공급되기까지의 과정은 일종의 관수로 흐름으로 생각할 수 있다. 관수로 내를 흐르는 유체가 갑자기 정지하게 되면, 유체 운동 에너지의 변화가 유발되고, 그로 인해 관내에 급격한 압력의 상승이 일어나게 된다. 반대로 정지하고 있던 유체가 빠른 속도로 흐르게 되면 압력 감소가 급격하게 발생한다. 이와 같이 유체 운동 상태의 급변에 의한 압력변화와 그에 따른 압력파가 음속의 속도로 상 하류로 전파되는 현상을 수격작용(waterhammer)이라 한다. 통상적으로 수격작용은 밸브 개폐 정도가 갑자기 바뀔 때, 펌프의 급격한 기동이나 정지 시, 터빈 내 전력소요가 갑자기 바뀔 때, 댐 수위의 갑작스런 변화, 펌프 임펠러의 진동, 물 수요의 급격한 변화 등에 의해 발생하며, 수격작용은 유체의 질량과 운동량 때문에 관 벽에 큰 힘을 가하게 되어 정상적인 동수압 보다 몇 배나 큰 압력을 발생시킴으로 관 자체는 물론 펌프, 밸브, 터빈 등 관 시설물을 파손시키거나 진동, 소음 등을 야기시킴으로 대규모 건물, 공장, 발전소 등을 설계할 경우 그에 대한 적절한 대책을 강구하여야 한다. 특히 댐에 연결된 저수지 또는 조정지로부터의 도수로가 압력수로이며 그 길이가 상당히 크면 수차가 급정지했을 경우 수격작용에 의해서 압력터널 내에 과도한 압력상승이 일어난다. 이 압력상승을 방지함과 함께 발전소 부하의 증감에 따라서 수량을 공급하거나, 흡수할 목적으로 압력도수로와 수압관과의 접합부에 자유수면이 있는 수조를 설치한다. 이것을 조압수조(surge tank)라 한다(최영박, 1979). 조압수조에서 부하의 급속한 차단에 의해서 수차로 유입될 수량이 차단되면 도수로 내로 흘러 들어온 물은 관성 때문에 수조 내의 수위를 상승시키고, 수조 수위가 어느 정도 이상으로 되어 저수지 수위 보다 상승하면 수조로의 유입이 정지하고 반대로 수조에서 저수지로 역류하여 수조수위는 하강한다. 즉, 조압수조는 도수로 내에 발생한 과도한 압력을 수조 내 수면의 승강운동을 이용하여 감소시키고 원래의 안정적인 수위로 회복시킨다. 본 연구에서는 수격작용에 대한 댐 안정성을 확보하는 수단 중의 하나인 조압수조에 대해 살펴보았다. 연구대상으로 용담댐을 선정하였다. 용담댐에 대한 기존의 검토결과 수직 갱의 지름이 5m 이상이면 조압수조의 동적안정조건을 만족 시키는 것으로 조사되었다. 댐의 설계홍수위인 EL. 265.5m를 기준으로 조압수조의 안정성을 감소시키지 않는 범위 내에서 조압수조 내 격벽 설치 유 무에 따른 수조의 최적 크기를 산정하였다. 산정결과를 분석한 결과 동일 조건에서 격벽을 설치한 경우가 격벽을 설치하지 않은 경우에 비해서 조압수조의 면적이 약 21% 감소하는 것으로 나타났다.

  • PDF

Technical Consideration for Production Data Analysis with Transient Flow Data on Shale Gas Well (셰일가스정 천이유동 생산자료분석의 기술적 고려사항)

  • Han, Dong-kwon;Kwon, Sun-il
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.1
    • /
    • pp.13-22
    • /
    • 2016
  • This paper presents development of an appropriate procedure and flow chart to analyze shale gas production data obtained from a multi-fractured horizontal well according to flow characteristics in order to calculate an estimated ultimate recovery. Also, the technical considerations were proposed when a rate transient analysis was performed with field production data occurred to only $1^{st}$ transient flow. If production data show the $1^{st}$ transient flow from log-log and square root time plot analysis, production forecasting must be performed by applying different method as before and after of the end of $1^{st}$ linear flow. It is estimated by an area of stimulated reservoir volume which can be calculated from analysis results of micro-seismic data. If there are no bottomhole pressure data or micro-seismic data, an empirical decline curve method can be used to forecast production performance. If production period is relatively short, an accuracy of production data analysis could be improved by analyzing except the early production data, if it is necessary, after evaluating appropriation with near well data. Also, because over- or under-estimation for stimulated reservoir volume could take place according to analysis method or analyzer's own mind, it is necessary to recalculate it with fracture modeling, reservoir simulation and rate transient analysis, if it is necessary, after adequacy evaluation for fracture stage, injection volume of fracture fluid and productivity of producers.