• Title/Summary/Keyword: 수력발전댐

Search Result 19, Processing Time 0.02 seconds

The Attitude Change of the Downstream Cambodian Government on the Development of Hydropower Dams in the Mekong River: The Background and Influential Factors (메콩강 수력발전댐 개발에 대한 하류국가캄보디아 정부의 태도 변화: 그 배경과 영향 요인)

  • JEON, Eun Jung;YUN, Sun-Jin
    • The Southeast Asian review
    • /
    • v.28 no.1
    • /
    • pp.219-261
    • /
    • 2018
  • The conflicts among nations surrounding international rivers are intensifying as worldwide water shortage is getting worse. The Mekong River is a representative trans-boundary river in Southeast Asia shared by six countries, China, Myanmar, Thailand, Laos, Cambodia, and Vietnam. As the economy grows, hydroelectric power has become a major power supply source to meet the increasing power demand of the these countries. However, the construction of dams on the Mekong River is controversial because hydroelectric power in the river upstream has a negative impact not only on the whole river ecosystem but also on residents' life around downstream, in particular. In order to understand the controversy arising from international rivers, it is necessary to take into account different positions of countries sharing it. However, studies on the position of a specific country to Mekong hydropower have been conducted mainly focusing on China and Laos. Therefore, this study tried to study the position of Cambodian government which is located downstream of the Mekong River and is likely to bear costs rather than to gain benefits from hydroelectric power generation. What is the attitude of the Cambodian government to the hydroelectric development of the upper Mekong and what is the reason for that? The study confirmed the Cambodian government's support for dam construction on the Mekong River. It also figured out influential factors on the formation of such a position as follows: 1) economic asymmetry with China, 2) power dependency and geographical asymmetry in Laos, and 3) importance of hydroelectric power in Cambodia.

Analysis Temporal and Spatial Changes of Water Quality in Domestic Hydropower Dam Reservoirs (국내 수력발전댐 저수지 수질의 시공간 변화 분석)

  • Park, Kyoung-deok;Kang, Dong-hwan;Jo, Won Gi;Yang, Minjune
    • Journal of Environmental Science International
    • /
    • v.31 no.5
    • /
    • pp.373-388
    • /
    • 2022
  • This study analyzed the temporal and spatial characteristics of water quality for five hydropower dam reservoirs in South Korea. Water temperature, pH, dissolved oxygen, and chlorophyll-a (Chl-a) showed high fluctuations in summer and autumn at all reservoirs, indicating the existence of seasonal effects. At all five reservoirs, the concentrations of suspended solids (SS) and total nitrogen (TN) fell under the "slightly bad" category and those of total organic carbon (TOC) fell under the "slightly good" category or higher, according to "the standard for living environment of lake water quality." Variations in the concentration ranges and degrees of change in SS, TN, and TOC among reservoirs were observed, indicating the influences of rainfall, surrounding environments, and seasonal changes. Daecheong and Namgang Dam showed high Chl-a concentrations in summer, indicating that the metabolism of microbial communities, such as algae, was active.

Analysis of Greenhouse Gas Research Trends of Hydropower Dams: Focusing on Foreign Cases (수력발전댐에서 온실가스 연구 동향 분석 : 국외 사례를 중심으로)

  • Park, Kyoung-deok;Jo, Won Gi;So, Yoon Hwan;Kang, Dong-hwan
    • Journal of Environmental Science International
    • /
    • v.31 no.2
    • /
    • pp.195-213
    • /
    • 2022
  • This research summarizes the generating factors of greenhouse gas (carbon dioxide, methane, nitrous oxide) in hydropower dams and related domestic/foreign researches. Microorganisms and eutrophication are the main factors in greenhouse gases in hydropower dam reservoirs. The greenhouse gas emission from the hydropower dam is affected by meteorological factors and dam operation periods, and greenhouse gases are also emitted from the outlets. The fluxes of greenhouse gas emission from the hydropower dams were -926~180,806 mg CO2 m-2d-1, -0.19~3800 mg CH4 m-2d-1, and 0.01~16.1 mg N2O m-2d-1. In South Korea, the study on the greenhouse gas emission from Korean hydropower dams has been rarely, and therefore it is inquired. This research suggested the methods on the greenhouse gas emission from Korean hydropower dams and flux calculation.

Application on the Convergence Technology for Culture Festival Promotion of Riverside Space (강변공간의 문화축제 조성을 위한 융복합 기술의 활용)

  • Yeon, Sang-ho;Lee, Young-wook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.1 no.4
    • /
    • pp.79-86
    • /
    • 2015
  • Cheongpungho and riversides are located in the center of South Korea Jecheon Peninsula, cheongpungho be formed by a chungju hydroelectric dam built in 1984 has now been changed as a freshwater lake created by the center of the South Han River upstream over the past 30 years. Recent Jecheon-sigovernment is developing the entertainment and natural healing resorts for the future, this research is using remote sensing techniques and field survey plan in comparison to the feasibility study of the cultural festival of the area was conducted in geographic research and analysis very effective to conduct the natural environment and terrain analysis by aerial photography and remote sensing techniques that can be proven integration and cultural content, in the riverside area of future business creation and tourism resources of the facilities and events in the new brand through research It was envisioned. As a result, we propose a new direction for the future of cultural tourism to participate in the new state-of-the-art digital imaging technology to traditional cultural content in fusion experiments to be more multi-cultural festival is formed.

Application on the Convergence Technology for Culture Festival Composition of Riverside Space (강변공간의 문화축제 조성을 위한 융복합 기술의 적용)

  • Yeon, Sang-ho
    • The Journal of the Convergence on Culture Technology
    • /
    • v.4 no.1
    • /
    • pp.253-261
    • /
    • 2018
  • Cheongpungho number is located in the center of South Korea Jecheon Peninsula, Chungju cheongpungho be formed by hydroelectric dam construction in 1984, now has been changed to a large man-made freshwater sites during the past 30 years. Recent Jecheon government is developing natural healing resort and entertainment performances for the future, in comparison to the feasibility study of the region using remote sensing technology and site planning was conducted in geographic research and analysis, and as a result, we have a very effective to incorporate the color maps using aerial photography and digital terrain analysis and usage analysis to prove and was in the riverside area for the future of the business and the research proposal facilities and events of the brand, to be more multi-cultural festival form apply new high-tech fusion experiments suggest new direction for future tourism.

Rock Support Design of Bakun Tunnelling Project in Sarawak, Malaysia (바쿤 가배수로 터널의 최적지보설계)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.296-306
    • /
    • 1998
  • Ongoing huge Bakun Hydropower project is including the construction of a 210 m height hydroelectric rockfill dam with an installed capacity of 2,520 MW and a power transmission system connecting to the existing networks between Sarawak and peninsula Malaysia. In order to allow the main dam construction during the dry season, the Ballui river will have to be detoured through 3 concrete lined diversion tunnels with an internal diameter of 12 m and a length of 1,400 m each. The geology of Bakun site belongs to the several thousand meters thick Belaga formation deposited from the late Cteteceous to the early Teriary in the Northwest Borneo geosyncline. The orientation of the bedding plane, strike at N55$^{\circ}$E to N70$^{\circ}$E and dip at 50$^{\circ}$SE to 70$^{\circ}$SE, is developed uniformly in Bakun sedimentary rocks. Rock mechanical characteristics of Bakun site have been classified into 4 rock mass types(RMT) depending on the degree of weathering and the occurrence of rock jointing with RMR. Graywacke(Sandstone) as well as Shale can take place together in the same rock mass type if their rock mass properties are similar. It was summarized the rock support type and support system design of underground diversion tunnels in view of rock mechanics.

  • PDF

Flood Hazard Map and EAP Establishment Against Dam/Levee Failure (댐.제방 붕괴에 대비한 홍수위험지도 및 EAP 작성)

  • Han, Kun-Yeun;Kim, Keuk-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.291-295
    • /
    • 2006
  • 비상대처계획(EAP, Emergency Action Plan) 수립 및 홍수위험지도 작성의 목적은 댐.제방 붕괴 등 비상상황이 발생하였을 때 하류부의 생명과 재산 손실을 최소화하기 위한 것으로서 댐 운영 및 관리책임자가 극한홍수 및 지진발생 조건하에서 댐의 물리적, 지형적, 구조적 특성에 따른 발생 가능한 비상상황을 예상하고 이에 효율적으로 대처하기 위한 가능한 최선의 사전계획을 수립하는 것이다. 또한, 댐의 비상상황에 대처하기 위한 비상대처계획 수립 의무화 및 이에 대한 실제적인 모의훈련 등에 필요한 기초자료를 체계적으로 제공하고자 함에 있다. 국내에서 EAP를 수립하여야 할 대상 댐 저수지는 한국수자원공사에서 관리하는 다목적댐, 생공용수댐과 한국농촌공사에서 관리하는 농업용저수지, 한국수력원자력주식회사에서 관리하는 수력발전댐 및 지방자치단체에서 관리하는 댐 등이 해당된다. 제방의 경우 인구가 밀집되어 있는 전 지역이 그 대상이 될 수 있다. EAP의 주요 내용에는 만약에 발생할 수 있는 붕괴 사고시 인명의 손실이나 재산상의 피해를 발생시킬 수 있는 댐 저수지들에 대해서는 EAP를 수립하거나 갱신하기 위한 지침들이 포함되어 있어야 한다. 댐으로부터의 하류 연안지역의 개발이나 소유권은 다양하며, 이로 인해 댐의 운영이나 붕괴로 인한 잠재적 인명손실 또한 다양할 수 있다. 따라서 모든 EAP는 댐, 저수지 하류부 현장 조건에 맞도록 구성되어야 한다. EAP 수립의 주체는 댐 및 저수지 관리자이며 EAP에는 비상상황 확인, 평가, 등급분류, 비상연락체계 및 경보전달체계 수립, 비상시 응급행동요령, 홍수범람예측지도 작성, 비상주민대피계획 및 훈련방안, 부록, 주기적 또는 필요시마다 보완 계획 등이 포함되어야 하며, EAP의 주요 구성요소인 홍수위험지도에는 홍수위험정보 및 대피정보를 제시함으로써 실제 주민 대피계획시 실제적이고 효율적인 대피계획 수립에 활용될 수 있다. 있는 기술가치평가 모형의 구축이 요구된다. 이에 본 연구에서는 효율적인 R&D 투자 정책 수립과 정부정책수립에 기여하고자 AHP(Analytic Hierarchy Process, 계층 분석 과정)기법을 이용, 수자원의 지속적 확보기술의 특성에 따른 4개의 평가기준과 26개의 평가속성으로 이루어진 2단계 기술가치평가 모형을 구축하였으며 2개의 개별기술에 대한 시범적용을 실행하였다.하는 것으로 추정되었다.면으로의 월류량을 산정하고 유입된 지표유량에 대해서 배수시스템에서의 흐름해석을 수행하였다. 그리고, 침수해석을 위해서는 2차원 침수해석을 위한 DEM기반 침수해석모형을 개발하였고, 건물의 영향을 고려할 수 있도록 구성하였다. 본 연구결과 지표류 유출 해석의 물리적 특성을 잘 반영하며, 도시지역의 복잡한 배수시스템 해석모형과 지표범람 모형을 통합한 모형 개발로 인해 더욱 정교한 도시지역에서의 홍수 범람 해석을 실시할 수 있을 것으로 판단된다. 본 모형의 개발로 침수상황의 시간별 진행과정을 분석함으로써 도시홍수에 대한 침수위험 지점 파악 및 주민대피지도 구축 등에 활용될 수 있을 것으로 판단된다. 있을 것으로 판단되었다.4일간의 기상변화가 자발성 기흉 발생에 영향을 미친다고 추론할 수 있었다. 향후 본 연구에서 추론된 기상변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간은 24개월이하의 중단기가 적합함을 발견하였다. 이상의 행태적 측면과 투자성과측면의 실증결과를 통하여 한국주식시장에 있어서 시장수익률을 평균적으로 초과할 수 있는 거래전략은 존재하므로 이러한 전략을 개발 및 활용할 수 있으며, 특히, 한국주식시장에 적합한 거래전략은 반전거래전략이고, 이 전략의 유용성은 투자자가 설정한 투자기간보다 더욱 긴 분석기간의 주

  • PDF

Design of the reinforced concrete lining in bakun diversion tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.20-26
    • /
    • 1999
  • The completion of the Bakun Diversion Tunnel is subsequently to the Main Dam construction. Therefore, the completion date is very important for the Bakun Hydroelectric Project. Generally, the tunnel lining work as a finishing phase of the tunnelling project occupies a important portion as well as an excavation and a support work of the tunnels in respect to the construction cost and period. Internal section of Bakun Diversion Tunnel is designed circular shape to reduce the roughness of the water flow with 12 meters in diameter of total length 4314.6 meters of 3 tunnels. The lining thickness is varied between 500 mm and 700 mm depending on the structural condition. From the original Tender design of the Bakun tunnels, the required quantity of steel bars was 5,985 ton designed by Reinforced Concrete (RC) through the entire tunnel linings. During the detail design stage by the consideration of the rock conditions and various load conditions, we could suggest five kinds of RC lining type including plain concrete lining type. Through the detail design modification, we could reduce the required amount of steel bars to 2,178 ton, as a half of original Bill of Quantity. Finally, this design modification give us the time and cost saving effect to catch up the construction progress in time.

  • PDF

Introduction of Small-Scale Pumped-Storage Generation Technology to solve the Problem of Renewable Energy Volatility (재생에너지 변동성 문제 해결을 위한 소규모 양수발전 활용 기술 소개)

  • Tae Gyu Hwang;Jong Seok Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.78-78
    • /
    • 2023
  • 기후변화 위기는 유사 이래 인류가 직면한 가장 큰 도전으로 범정부적 글로벌 문제로서 이를 해결하기 위한 다양한 정책들이 범국가 차원 혹은 세계적 기업들에 의해 발표 혹은 시행되고 있다. 이러한 기후변화위기와 탄소배출 저감을 위한 대표적인 대응 방안 중 하나가 바로 재생에너지의 확대·보급 노력이다. 그러나 재생에너지는 날씨와 계절 등 자연환경의 영향을 받는 에너지원으로써 간헐성, 변동성을 가지므로, 시간대별 발전량 예측과 전력공급 안정성에 어려움이 있다. 이러한 문제를 해결하기 위하여 재생에너지 발전은 석탄화력 발전과 달리 전력의 수요와 공급의 균형을 위한 에너지저장장치(Energy Storage System, 이하 ESS)가 있어야 한다. ESS는 전력공급 안정성 향상과 전력 수급의 유연성을 제공하는 장점이 있지만, 초기 설치비용이 높은 단점이 있다. 특히, 배터리 기반 ESS의 경우 높은 구축 비용과 한정적인 충. 방전수명으로 인하여 대용량 ESS로써의 역할 수행에는 분명한 한계가 있다. 하지만 재생에너지와 연계한 ESS로 양수발전댐을 활용할 경우 장주기, 장수명, 대용량 에너지 저장에 매우 합리적인 수단으로 판단되었다. 다만, 양수발전 댐 구축에는 토목공사로 인한 환경 훼손이라는 문제점도 존재한다. 본 고에서는 지역 분산형 소규모 양수발전(Pumped Storage Hydropower, 이하 PSH)댐 구축 및 운영기술 개발을 통해 지역 전력공급과 전력 수급을 조절하면서 변동성 재생에너지를 안정적으로 사용할 수 있는 방안을 소개하고자 한다. 특히, 해당 기술은 지역별 특성에 맞춰 유연하게 설치할 수 있으며, 대규모 토목공사로 의한 환경적 부작용을 최소화할 수 있다. 또한 소규모 PSH는 지역의 저수지 및 수자원을 이용하여 에너지를 저장함으로써 변동성 큰 재생에너지의 유연화 대응과 동시에 안정적인 에너지 공급이 가능하다. 본 고에서는 재생에너지의 확대·보급에 따른 문제점과 대표적 ESS 기술들을 분석·소개한다. 지역분산형 소규모 PSH 기술개발 연구기획 내용 소개를 통하여 전력 생산 및 공급의 탈중앙화를 달성하고, 지역별 변동성 재생에너지의 안정적 활용과 지역 전력공급 특성 및 전력 수급에 대응할 수 있는 방안을 제안하고자 한다.

  • PDF