Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Analysis of GPS Precipitable Water Vapor Variation During the Influence of a Typhoon EWINIAR (태풍 에위니아 영향력에서의 GPS 가강수량 변화 분석)

  • Song, Dong Seob;Yun, Hong Sic
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.1033-1041
    • /
    • 2006
  • In this study, we calculated a space-time variation of GPS precipitable water vapor using GPS meteorology technique during a progress of the typhoon EWINIAR had made an effect on Korean peninsular at 10 July, 2006. We estimated tropospheric dry delay and wet delay for one hourly using 22 GPS permanent stations and precipitable water vapor was conversed by using surface meteorological data. The Korean weighted mean temperature and air-pressure of versa-reduction to the mean sea level have been used for an accuracy improvement of GPS precipitable water vapor estimation. Finally, we compared MTSAT water vapor image, radar image and precipitable water vapor map during a passage of the typhoon EWINIAR.

GPS 신호의 전파엄폐(Radio Occultation)방법을 이용한 연직 수증기량 산출

  • No, Gyeong-Min;Jo, Jeong-Ho
    • Bulletin of the Korean Space Science Society
    • /
    • 2009.10a
    • /
    • pp.41.2-41.2
    • /
    • 2009
  • 저궤도위성에서 수신한 지구대기에 의해 엄폐된(Occulted) GPS 신호를 이용한 연직 수증기량 산출에 관해 다루었다. 전파엄폐(Radio Occultation) 기법은 원래 행성대기에 의해 엄폐된(Occulted) 별빛을 이용하여 행성의 대기를 분석하는데 사용되던 기법을 일컫는 말로 최근엔 GPS를 이용한 지구대기 분석에 활용되고 있다. 1995년 GPS/MET 위성을 통해 처음으로 GPS 전파엄폐 기술을 통한 대기정보의 연직분포를 산출하였고, 현재는 COSMIC 위성군을 비롯해 많은 저궤도위성에서 GPS 전파엄폐기술을 통해 온도, 압력, 습도 등의 연직분포를 산출하고 있다. 이 중 연직 수증기량 분포는 기상예보를 위한 수치모델(Numerical Weather Model)에서 매우 중요한 초기 값이다. GPS 전파엄폐 기술을 통한 연직수증기량 산출은 라이오존데(Radiosonde)나 마이크로미터와 같은 연직수증기량 관측기기의 검증 및 상호 통합활용이라는 측면에서 활용가치가 매우 높다. 특히, GPS 전파엄폐 기법은 시공간적 제약이 상대적으로 전 지구적인 기후분석에는 적합한 기법으로 주목을 받고 있다. 이 연구에서는 COSMIC에서 제공하는 굴절각(Bending Angle)정보를 이용하여 연직 수증기량을 산출하는 알고리즘을 구현하였다. 또한 천문연이 보유하고 있는 마이크로미터에서 산출한 가강수량과의 비교.검증하기위한 방안을 도출하였다. 이 연구결과는 현재 진행 중인 다목적실용위성 5호의 전파엄폐용 수신기의 활용에 기여할 것으로 기대된다.

  • PDF

Accuracy Analysis of GPS-derived Precipitable Water Vapor According to Interpolation Methods of Meteorological Data (기상자료 보간 방법에 의한 GPS기반 가강수량 산출 정확도 분석)

  • Kim, Du-Sik;Won, Ji-Hye;Kim, Hye-In;Kim, Kyeong-Hui;Park, Kwan-Dong
    • Spatial Information Research
    • /
    • v.18 no.4
    • /
    • pp.33-41
    • /
    • 2010
  • Approximately 100 permanent GPS stations are currently operational in Korea. However, only 10 sites have their own weather sensors connected directly to the GPS receiver. Thus. calculation of meteorological data through interpolation of AWS data are needed to determine precipitable water vapors at a specific GPS station without a meteorological sensor. This study analyzed the accuracy of two meteorological data interpolation methods called reverse sea level correction and kriging. As a result, the root-mean square-error of reverse sea level correction were seven times more accurate in pressure and twice more accurate in temperature than the kriging method. For the analysis of PWV accuracy, we calculated GPS PWV during the summer season in :2008 by using GPS observation data and interpolated meteorological data by reverse sea level correction. And, we compared GPS PWV s based on interpolated meteorological data with those from radiosonde observations and GPS PWV s based on onsite GPS meteorological sensor measurements. As a result, the accuracy of GPS PWV s from our interpolated meteorological data was within the required operational accuracy of 3mm.

BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

A Development of the Design modification function for road construction project Cost management (도로분야 공사비정보 관리를 위한 설계변경 기능 개발)

  • Moon, Jin-Seok;Yoon, Hoi-Su;Kim, Sung-Jin;Han, Choong-Han
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.16-17
    • /
    • 2012
  • 국토해양부는 지방국토관리청의 도로공사와 관련하여 발생하는 공사비 정보의 교환 및 공유를 목적으로 작업분류체계 기반의 공사비 관리 항목을 추가하여 전자설계도서 작성 납품 지침을 개정하였다. 이를 반영하고 문제점 개선 및 활성화를 위하여 5개 지방국토관리청에서 관리중인 10개 도로건설공사를 시범적용 사업으로 지정하여 발생하는 공사비 정보를 디지털 수량산출정보로 관리하고 있다. 시범사업을 진행하면서 건설공사에 발생하는 설계변경 업무를 전자화하여 관리하는 기능을 개발하고 추가 적용하였다. 이를 통해 건설사에서 생성한 설계변경 정보를 건설사와 발주처가 동일한 형태로 공사비 정보를 공유 및 관리 가능하도록 하였다.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

Determination of Precipitable Water Vapor from Combined GPS/GLONASS Measurements and its Accuracy Validation (GPS/GLONASS 통합관측자료를 이용한 가강수량 산출과 정확도 검증)

  • Sohn, Dong Hyo;Park, Kwan Dong;Kim, Yeon Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.21 no.4
    • /
    • pp.95-100
    • /
    • 2013
  • Several observation equipments are being used for determination of the water vapor content and precipitable water vapor (PWV) because the water vapor is highly variable temporally and spatially. In this study, we used GNSS systems such as GPS and GLONASS in standalone and combined modes to compute PWV and validated their accuracy with respect to the results of other water-vapor monitoring systems. The other systems used were radiosonde and microwave radiometer, and the comparisons were convenient because all three systems were collocated at the test site. The differences of PWW were in the range of 0.6-3.4 mm in the mean sense, and their standard deviations were 1.0-3.8 mm. The relatively large difference of GNSS compared with the other two systems were believed to be caused by the fact that the GNSS antenna used in this study was the kind for which the international standard of phase center variations (PCV) calibration is not available. We expect better accuracy of PWV determination and improved availability of it through integrated data processing of GPS/GLONASS when an appropriate antenna with PCV correction model is used.

A Study on Estimating Rice Yield of North Korea using MODIS NDVI (MODIS NDVI를 이용한 북한의 벼 수량 추정 연구)

  • Hong, S.Young;Choe, Eun-Young;Kim, Gun-Yeob;Kang, Sin-Kyu;Kim, Yi-Hyun;Zhang, Yong-Seon
    • Proceedings of the KSRS Conference
    • /
    • 2009.03a
    • /
    • pp.116-120
    • /
    • 2009
  • 원격탐사 기술은 사람이 직접 방문하여 조사하기 힘든 극지라든가 농업환경에 대한 자료 요구도가 높으면서도 직접 수집이 어려운 비접근 지역에 대한 정보를 추출하는데 유용한 관측수단이다. 본 연구는 MODIS(Moderate Resolution Imaging Spectroradiometer) 제공 산출물 중 16일 단위로 작성되는 NDVI(Normalized Difference Vegetation Index, MOD13)를 이용하여 북한의 벼 수량을 추정하는 것을 목적으로 하였고, 그 가능성과 한계에 대하여 알아보았다. 2000년부터 2008년까지 촬영된 MODIS MOD13 자료를 미국 NASA로부터 제공받아 좌표체계를 우리나라에 맞게 투영하고 NDVI를 추출하여 자료분석에 사용하였다. 통계청에서 발표한 벼 수량 및 생산량 통계자료를 이용하였다. 농촌진흥청 국립농업과학원에서 작성한 북한의 토지피복분류도를 이용하여 서해안 평야지대에 위치한 논을 위도별로 네군데 정하여 관심지역(area of interest)으로 설정하였다. 이 관심지역에 대한 시계열 값을 추출하여 연중 연간 변화를 분석하고 2000년부터 2007년까지 수잉기의 NDVI 값을 이용하여 수량에 대한 상관계수(r)는 $0.77^*$로 5%에서 유의하여 NDVI 값에 따라 벼 수량에 큰 영향을 주는 것으로 나타났다. 수잉기의 NDVI 값과 벼 수량에 대해 회귀분석한 결과($R^2=0.591^*$), NDVI에 따른 벼 수량의 변이를 59.1% 설명할 수 있었다. 이와 같이 회귀식을 이용하여 2008년 북한의 벼 수량은 약 2.80 ton/ha로 추정되었다.

  • PDF