• Title/Summary/Keyword: 수격 흡수기

Search Result 2, Processing Time 0.01 seconds

A Study on the Water Hammer Arrester Considering the Way of First Assessment Test (최초의 평가시험 방법을 고려한 수격흡수기의 장치에 관한 연구)

  • Yeum, Moon-Cheon;Han, Yong-Taek
    • Fire Science and Engineering
    • /
    • v.29 no.1
    • /
    • pp.53-59
    • /
    • 2015
  • Water hammering created by an unsteady flow in pipeline systems can cause excessive change in pressure, vibration, and noise. So, water hammer analysis is very important for limiting the damage caused to pipeline, pump and valve systems by operation conditions. On the other hand, water hammer arrester has been manufactured and used in order to minimize the damage caused by water hammering phenomenon in domestic, and it has been produced and installed as the low cost-oriented because of being no separate standard in the meanwhile. Therefore, our research team investigated about the standardization of water hammer arrester performance through the various methods, such as test methods for verification of one pipe, assuming the occurrence of water hammer in a water-based fire extinguishing system, separated for opening impact pressure and shut off impact pressure and for a branch pipe in order to make guideline for water hammer arrester performance. And finally, verified the performance of the water hammer pressure as the simple mechanical way using the U-shaped pipe and a test weight, so KFI standards for the water hammer arrester could be established.

Experimental Study on the Water Hammer Absorption Effects of Water Hammer Arrester in the Water Supply Piping System (급수관로계에 설치된 수격흡수기의 수격흡수효과에 관한 실험적 연구)

  • Choi, Jung-Geun;Lee, Suk-Jong;Lee, Myoeng-Ho;Sung, Jae-Yong
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.30 no.3
    • /
    • pp.396-402
    • /
    • 2006
  • In this study, dynamic characteristics of water hammer pressure in water supply piping system with water hammer arrester has been investigated experimentally to characterize the transient pressure of water hammer in high rise building. Experiments were conducted to verify the absorption effects by water hammer arresters with 3 different gas volumes of water hammer pressure generated by sudden valve closure. As the results, it has been found that zoning and sizing of pipe diameter for suitable flow velocity and water hammer arresters with effective pressure absorption capacity have to be installed to protect water hammer problems in building water supply piping system.