• 제목/요약/키워드: 소단면 작업장

검색결과 1건 처리시간 0.016초

소단면 터널에서 효율적인 발파 패턴에 관한 연구 (A Study on Effective Blasting Patterns on Small Area Tunnel)

  • 임한욱;권오성
    • 산업기술연구
    • /
    • 제26권A호
    • /
    • pp.17-28
    • /
    • 2006
  • In underground drilling and blasting, particularly in small headings(generally under $20m^2$), the prospects for changes of blast parameters are usually more limited than those employed by large area tunnel(over $20m^2$). It is also well known that the consumption of explosives and specific drilling rate for small tunnel areas are exponentially increased also tunnel areas decrease. To confirm above results, some tests for two tunnels(irrigation water tunnel with $6.0m^2$ area, electric supplies tunnel with $15.0m^2$) are also carried out in this study. As a results, specific drilling rate and specific charge for irrigation water tunnel were decreased from 13.8 to $7.7m/m^3$ and from 4.88 to $2.56kg/m^3$ respectively. Those for electric supplies tunnel were also decreased from 8.0 to $4.9m/m^3$ and from 3.46 to $2.22kg/m^3$.

  • PDF